Loading...
Permits - Permit# SP-2021-00077 - 2258 Hazeldell Avenue - 8/6/2021City of Spring Park Permit 1 CITY OF S P R J CJ�VU i # INNaS0IA To Schedule an Inspection Call: 952-442-7520 Details Permit Number: SP-2021-00077 Issue Date: 8/6/2021 Zoning Type: RESIDENTIAL Use Type: 24 HOUR NOTICE REQUIRED FOR ALL INSPECTIONS ♦ MON-FRI: 8AM-4:30PM • NO HOLIDAYS Site Address: 2258 HAZELDELL AVENUE, SP, MN 55384 Description: Re -Roof Permit Granted To: Homeowner's Name: ROBIN L SHERMAN Phone Number: Parcel #: 1711723330067 Fees Permit Type: MAINT - Roofing Replacement Permit Exp: 2/2/2022 Valuation: $0.00 13287 License Lookup 8/6/2021 1.00 8/6/2021 Paid Check: 2638 $5.00 13287 Residential - Re -Roof 8/6/2021 1.00 8/6/2021 Paid Check: 2638 $50.00 13287 State Surcharge Flat Fee - $1.00 8/6/2021 1.00 8/6/2021 Paid Check: 2638 $1.00 Total: $56.00 Notes • This permit is issued in accordance with and subject to all provisions of Ordinances and policies governing building and zoning in City of Spring Park. • Permit Holder/Contractor/Owners Agent is responsible to call for the inspections! • Permit Packet, including approved plan, and this inspection record must be posted in an accessible location before calling for inspection. Maintain this inspection record until work is complete. • No deviations from the approved plans are allowed without prior consent from the building inspections department. • To Owner, Occupant, or Contractor: It is ILLEGAL TO OCCUPY this area/building until all required final inspections have been made, approved, signed, and certificate of occupancy issued! Scott Qualle, Building Official City of Spring Park #4349 Warren Avenue ♦ 55384 Copyright ©2021 INSPECTION RECORD 2020 MN State Building Code City of Spring Park Permit Number: SP-2021-00077 Issue Date: 8/6/2021 SITE ADDRESS: 2258 HAZELDELL AVENUE, SP, MN SS384 Description: PERMIT TYPE: MAINT - Roofing Replacement Re -Roof ZONE/USE TYPE: RESIDENTIAL APPLICANT: OWNER: ROBIN L SHERMAN No inspection will be performed, and a re -inspection fee will be charged, if this "Inspection Record", the "City of Spring Park Permit", and, when applicable, the approved plans are not available to the inspector. This permit expires if construction activity does not commence within 180 days from obtaining this permit; when construction activity has been suspended or abandoned for at least 180 days; or the work has not been inspected within 180 days from the last documented activity. IF SEPARATE PERMITS ARE REQUIRED, REFER TO THE "SEPARATE PERMITS REQUIRED FOR:" STAMP ON YOUR APPROVED PLANS/CONSTRUCTION DOCUMENTS TO IDENTIFY WHAT SEPARATE PERMITS ARE REQUIRED. ALL REQUIRED ROUGH -IN INSPECTIONS, NOTED ON SEPARATE PERMITS, MUST BE COMPLETED PRIOR TO SCHEDULING A FRAMING INSPECTION. ALL REQUIRED FINAL INSPECTIONS, NOTED ON SEPARATE PERMITS, MUST BE COMPLETED PRIOR TO SCHEDULING A BUILDING FINAL INSPECTION. Permit Card Re -Roof In -Process DO NOT COVER ITEMS TO BE INSPECTED. Required MUST CALL TO SCHEDULE NO LATER THAN THE BUSINESS DAY PRIOR TO THE INSPECTION DAY: 8:00 A.M. TO 4:30 P.M. MOND" THRU FRIDAY. PHONE NUMBER TO CALL: 952-442-7520 When a Certificate of Occupancy is needed, return this card and the approved final inspection notice to the City of Spring Park office. Transaction ID: 13287 Transaction Number: Transaction Type: Payment Recipient: Contractor Notes: Thank you for your Payment! 1 CITY OF P R I �I �' 11-x < MINK1801A City of Spring Park 4349 Warren Avenue SP MN, 55384 Ph: 952-442-7520 $56.00 Date: 8/6/2021 Method: Check: 2638 Address: 2258 HAZELDELL AVENUE, SP, MN 55384 Reference: Permit Number: SP-2021-00077 Type: MAINT - Roofing Replacement for Product: Status: Quantity: Price: Total Amount: Re-RoofResidential - II $50.00 $50.00 License Lookup Paid 1.00 $5.00 $5.00 State Surcharge Flat Fee - $1.00 Paid 1.00 $1.00 $1.00 Total Amount: $56.00 Page 1 of 1 Printed on: 8/6/2021 CITY OF SPRING PARK PAGE 1 BUILDING PERMIT 4349 Warren Avenue 7i '"�C�a 1- 7`1 Spring Park, MN 55384 ❑ Handout Given Phone: 952-471-9051 Fax: 952-471-9160 ❑ Lead Handout Given Routed to MNSPECT #CI-Z2 ( SITE ADDRESS: vlC) It QC-- PID: 1) Was the home constructed before 1978? (YES ❑, continue with line 2, NO ❑ continue without completing EPA Section) 2) Will the work disturb 2!6 sq ft of interior painted surfaces or >_20 sq ft of exterior painted surfaces? (YES ❑ go to line 4, NO ❑ line 3) 3) Are there any windows being replaced? (YES o, go to line 4, NO ❑ continue without completing EPA Section) 4) Has this home been Certified Lead Free? (YES ❑, you MUST Attach Certification Information, NO ❑ complete line 5) 3) EPA Contractor Certification Number. NAT - (applies to contractor only) • PROPERTY OWNER: t r n ell— Address: e- • Ci :_ f PC_( L State: Zip: S3�`I Email: Contact Name: Phone: • t+ CONTRACTOR: O �t^ Address: 3 0 RC�J\ O V/6/ 40 e- Ci : �e- J:W-e.r State: M JVZip: 0 Phone: - 0 Z`- Lf 30 Fax: Contractor License No: 13 L 5 y Contact Name:Ll\, ctr-u lone: J�o� - �✓� Email: ��� �Gct c."' Gv•�l G-n +CS . Ct=%"A ARCHITECT: Address: City: State: Zip: Phone: Fax • Email: Contact Name: Phone: TYPE OF WORK: ❑ New Construction ❑ Deck &Re -Roof ❑ Commercial Aesidential ❑ Change of Use ❑ Pool ❑ Re -Side EST. VALUATION. OF WORK ❑ Finish Basement ❑ Retainflwl ff❑ Fence $ 4 ❑ Remodel ❑ Porch ❑ Shed Square feet: ❑ Addition ❑ Demolitioneop ❑ Window/Door Replacement ❑ Garage-Attached/Detach ❑ Plumbing -provide detail on Page 2 # being replaced •• Detailed Description of Work: ❑ Accessory Structure ❑ Mechanical -provide detail on Page 2 ❑ Misc Other • Signature of this application by the legal property owner or a licensed contractor, as the owners representative, is required and authorizes the Zoning Administrator or designee and the Building Official or designee to enter upon the property to perform needed inspections. Entry may be without prior notice. I hereby acknowledge that I have read this application and state that all Information Is true and correct to the best of my knowledge. I further agree that al work performed will be in accordance with approved plans. spectfications and conditions and to abide by all ordinances of the Municipality and the laws of the State of Minnesota regarding actions taken pursuant to this permit. I agree to pay all plan review fees even if I choose not to proceed with the work. Permit expires when work .. is not commenced within 180 days from date of permit, or if work is suspended, abandoned, or not inspected for 180 days. Work beyond the scope of this permit, or work without a permit or Inspection. • will be subject to a penalty. Noise Ordinance In Effect: MONDAY - FRIDAY Before 7 a.m. and after 10 p.m. Weekends/Holidays before 7 a.m. and after 8 p.m. SIGNATURE OF APPLICANT: DATE: - I PRINTED NAME:` z U c/ This is the signature of: ❑ Owner or))Owner's Representative OCCUR TYPE: CONST. TYPE: CODE: BLDG SPRINKLED Yes / No VALUATION: $ Permit Fee: $ e C> WAC Charge: $ Plan Review Fee: $ Sewer & Water Hook -Up: $ State Surcharge: $ CSC) Sewer& Water Disconnect: $ Site Inspection Fee: $ Water Meter. $ S.E.C. Fee: $ Muni SE/WA Fee: $ Investigation Fee / Other Fee: $ •2016 SAC Escrow. $2 485 >' Copy Charge ($.25 per8.5 01 page) $ Other: $ 0 License Check ($5) / Lead Check ($5) $ 'r. TOTAL DUE: $ f�CY_� w SUB -TOTAL $ �5 . C7C7 N 'NOTE: Commercial plans will be submitted to the Met Council Environmental Svcs Plumbing Fee (from Page 2) $ W for SAC determination. Escrow payment will be required when permit Is issued. If Mechanical Fee from Page 2 $ after Met Council review no SAC is determined, escrow will be refunded in full. U. Special Conditions/Required Setbacks: IL O Building Approval By: DATE: Printed Building Ap val ❑ License Verification ❑ Lead Verification - Checked By: City Approval By DATE: r Paid: Date: - to Receipt No. (f-O By: ?S J LICENSE/CERTIFICATE/REGISTRATION DETAIL RESIDENTIAL Class Type: BLDG Number: BC642454 CONTRACTOR Application 241205 Status: ISSUED No: Effect Expire Date: 3/31/2023 4/1/2021 Date: Orig Date: 11/28/2011 Print 3/22/2021 Date: Enforcement NO Action: Workplace N/A Experience: Name: GLACIER COMPANIES LLC Address: 21630 HANOVER AVE LAKEVI LLE , MN 55044 Phone: 612-202-2930 Business Relationship Requirements Name: BRADLEY, QB143183 [View JACOB M Lic/Reg No: license/registration] Status: ISSUED Application 268938 No: Expire 3/31/2022 Effect 5/27/2020 Date: Date: Orig 2/18/2010 Date: Another Lookup? "` PHONE: 952-442-7520 M N 3 P E C TLLC - (a p FAX: 952-442-7521 COMPLYHELPING YOU . as EMAIL. INFO@MNSPECT.COM RESIDENTIAL ROOFING REPLACEMENT ➢ This handout is intended only as a guide. It shall not be considered a complete set of requirements. ➢ Materials and installation must comply with the current Minnesota State Building Code and the manufacturers' installation specifications for each product. ➢ Residential roofing replacement permits are issued over the counter at the municipality office. ➢ This handout is VALID for single-family homes, duplexes, and townhomes. (Does NOT include condominiums, apartment complexes, and commercial properties.) ➢ NOT VALID for repairs, replacement, removal, or installation of any structural members. ➢ Each address requires a separate permit. POSTED prior to start of work - VISIBLE from street or driveway - ACCESSIBLE to the inspector Inspections MUST be scheduled during office hours AT LEAST one business day prior to inspection. If a specific date and time is required, additional notice may be needed. Failure to cancel a scheduled inspection may result in a reinspection fee. o Office Hours: Monday - Friday • 8:00 a.m. - 4:30 p.m. o Phone: (952) 442-7520 or (888) 446-1801 In -Progress Inspection: An inspection must be performed prior to the completion of the project unless otherwise approved (see Page 3 for details). Ideally, the inspection should take place when the tear -off is done and the underlayment and ice barrier are applied and not yet fully covered by roof covering. (The taking of photographs showing decking, ice barrier, underlayment, and flashing is always a good idea, but is NOT a substitute for the required inspection.) See notes on Page 2 regarding installing roofing materials over one existing layer. ✓ Your representative must be on site, able to communicate with the inspector, and provide access to the roof (ladder). ✓ You must have all installation instructions on site. ✓ Asphalt shingles must meet ASTM D7158 or ASTM D 3161 and comply with Table R905.2.4.1 of the current MRC for class and minimum wind resistance. Verification must be provided at time of inspection. ✓ Failure to comply with inspection and installation requirements may result in: 1) the requirement to remove materials, 2) penalty fees, and/or 3) a license investigation under Minnesota Statute 326B.84. NOTICE: Construction or work for which a permit is required shall be subject to inspection by the Building Official, and such construction or work shall remain accessible and exposed for inspection purposes until approved. It is the responsibility of the permit applicant to be in attendance on site and provide access to the Building Official for all required inspections. If work is concealed and/or work is not complete at time of inspection, an additional inspection is required and a reinspection fee may apply. Note: The State of Minnesota requires all residential building contractors, remodelers, roofers, plumbers, and electricians to obtain a state license, unless they qualify for a specific exemption. Any person claiming an exemption must provide a copy of a Certificate of Exemption from the Department of Labor & Industry to the Municipality before a permit will be issued. Note: To determine contractor requirements, or to check the licensing status of a contractor, please call the Minnesota Department of Labor & Industry at 651-284-5065 or toll free 1-800-342-5354. Note: For specific code requirements, contact the Building Inspection Department at 952442-7520 or 888-446-1801 or e-mail: info a�%mnspect.com. Residential Roofing Replacement Handout Page 1 of 3 Copyright © MNSPECT 2020, Rev. April 2021 When new roof covering is to be installed over one layer of existing covering, an initial inspection prior to covering will need to be completed to verify that only one layer is being covered and compliance with R908.3.1 is being met: R908.3.1 Re-covering versus replacement. New roof coverings shall not be installed without first removing all existing layers of roof coverings where any of the following conditions exist: 1. Where the existing roof or roof covering is water -soaked or has deteriorated to the point that the existing roof or roof covering is not adequate as a base for additional roofing. 2. Where the existing roof covering is wood shake, slate, clay, cement or asbestos -cement tile. 3. Where the existing roof has two or more applications of any type of roof covering. A re -inspection and re -inspection fee will be required if the original roofing is determined to be inadequate. PROJECT The following is a guideline to assist in compliance with the requirements of the MN State Building Code. ❑ The home address must be visible from the street. ❑ Identify the roof pitch(es) to determine which approved roof covering(s) can be installed. Roof Covering Pitch Requirements Roof Covering Pitch Requirements Asphalt Shingles 2" rise per 12" run or greater Metal Roof Panels '/2" rise per 12" run or greater (,k * *) (lapped, with sealant) Clay/Concrete Tile 2%" rise per 12" run or greater Metal Roof Panels W rise per 12" run or greater (*) (standing seam) Wood 3" rise per 12" run or greater Modified Bitumen Roofing '/," rise per 12" run or greater Shingles/Shakes (A *) Metal Shingles 3" rise per 12" run or greater Thermoset Single -ply Roofing '/," rise per 12" run or greater (A*) Metal Roof Panels 3" rise per 12" run or greater Thermoplastic Single -ply '/." rise per 12" run or greater (lapped, no sealant) Roofing Slate Shingles 4" rise per 12" run or greater Liquid -applied Coatings '/." rise per 12" run or greater w* Mineral -surfaced Roll 1" rise per 12" run or greater Sprayed Polyurethane Foam '/." rise per 12" run or greater Roofing A * Roofing ❑ Make sure the roof decking is in good condition and there are no gaps that exceed the manufacturer's installation instructions for the roof covering used. Roof sheathing shall be checked prior to re -roofing and repaired or replaced if rotted or unsound. Replacement sheathing shall conform to the requirements of the Building Code and the manufacturer of the product. ❑ Obtain a Building Permit if any structural members need to repaired, replaced, and/or added. ❑ � Install the required ice barrier starting at the eaves to a point no less than 24" inside the interior of the exterior wall (measured horizontally). (Exception: detached structures that are not heated.) ❑ Make sure all flashing is constructed of a minimum 26-gauge, corrosion -resistant sheet metal. ❑ Install the front wall, vertical sidewall, soil stack, vent pipe, and/or chimney flashing in accordance with the manufacturer's printed instructions. Apply counter flashing in a shingle -like fashion. ❑ Install valley linings and flashing. ❑ A cricket or saddle is required on all chimneys or penetrations that are more than 30" wide (measured parallel to ridge). See Figure R1003.20 and Table R1003.20 — current MN State Residential Code. ❑ * Install the required underlayment materials, ensuring the underlayment materials extend to the edges of the roof deck. *(For Asphalt Shingles -Roofs with pitches of 2:12 up to, but not including, 4:12 have double underlayment requirements. First, apply a 19" strip along the eave, and then 36" strips lapped a minimum of 19". End laps shall be 4" and offset by 6'. Please call if you need additional information.) ❑ Ensure all roof covering materials are installed in accordance with the manufacturers' installation instructions. ❑ Ensure all venting terminations extend through the roof deck and are properly flashed. ❑ Ensure the minimum attic cross -ventilation is provided. How to calculate the minimum: 1. When soffit/eave venting is provided, 1 sq. ft. minimum of net free ventilation area shall be provided for every 300 sq. ft. of attic area (40%-50% of the net required ventilation opening must be located in the upper portion of the roof, no more than 3' below the ridge). The remaining ventilation must be located in the eave/soffit. 2. When less than 50% of the required ventilation is provided in the eave/soffit, 1 sq. ft. minimum of net free ventilation area shall be provided for every 150 sq. ft. of attic area. ❑ All removed and excess roofing materials must be disposed of at an MPCA-approved landfill. Residential Roofing Replacement Handout Page 2 of 3 Copyright © MNSPECT 2020, Rev. April 2021 INSPECTION PROCEDURES FOR REROOF PROJECTS APPLIES FOR THE INSTALLATION OF ASPHALT SHINGLES ONLY The building code requires an inspection to close all permits. The appropriate time to verify compliance and discuss the project is while the work is "in progress." As a result, we require the contractor to call us at (952) 442-7520 at least one day prior to starting the work to schedule a half -way inspection (while the work is underway). If, and only if, we are unable to provide an inspector while the project is underway, we will authorize you to take photos and provide them at the final inspection, which will require you to provide the photos at the job site. If the inspector who visits the worksite determines that the supplied pictures are not conclusive, you will be required to meet our inspector on -site and to provide access to the roof. Should this be required, a reinspection fee will apply. At the time of the inspection, you must provide the following photos: NOTE: Photos shall identify that the roof is of the house being worked on (i.e. photos should include identifying features such as the yard, driveway, house siding, etc.). ✓ Decking with nothing on it — all sides/planes of the roof ✓ Ice/water guard — photos taken BEFORE underlayment is added to roof ✓ Underlayment — photos taken after installation: • All sides/planes of the roof • Underlayment shall extend to roof edges ✓ Flashing — all required flashing: • step flashing, • dormer flashing, • All other required flashing Benefits of an in -progress inspection: • If there is an issue with the work "under" the shingles, it can hopefully be caught prior to covering — saving time and money. • Pictures are often inconclusive. • The inspector can communicate directly with the contractor while on site, avoiding the possibility that correction requirements will not be passed on to the contractor. • If the contractor has a wide range of service it can be inconvenient to return to the site to make any required corrections. An in -progress inspection allows corrections to be made while the contractor is still on site. • The inspector and the contractor can discuss issues and concerns to ensure that work being done is compliant with the code. The Inspector's job is to verify a code compliant installation. In -progress inspections are the best way to do this! Residential Roofing Replacement Handout Page 3 of 3 Copyright © MNSPECT 2020, Rev. April 2021