Ordinance - 17-04 - Schedule of Fees and ChargesCITY OF SPRING PARK
SPRING PARK, MN
ORDINANCE 17-04
AMENDMENT AND RESTATEMENT OF CITY CODE
APPENDIX A — SCHEDULE OF FEES AND CHARGES
Chapter 1. General Administration
Administrative Citations and Fines
§1-14
General fines for violations/citations
First offense
1100.00
Second offense
1150.00
Third offense (and all subsequent offenses)
200.00
Fines for violation of Chapter 11 — Dock Permits
See below
Fines for violation of Chapter 34 — Lawn Sprinkling
See below
Chapter 4. Alcoholic Beverages
Alcohol
§4-31(c)
Beer, 3.2 on -sale 1532.00
§4-31(a)
Beer, 3.2 off -sale 180.00
§4-31 (b)
Taproom, growler off -sale 1100.00
§4-31 (d)
Taproom, on -sale 12,000.00
§4-31(c)
I Liquor, intoxicating on -sale (payable in 2 equal installments on 6/1 and 12/31)
10,050.00
§4-31(e)
Liquor, intoxicating Sunday sale
200.00
§4-31(a)
Liquor, intoxicating off -sale 1100.00
§4-92
Wine, on sale 11,064.00
Chapter 6. Amusements and Entertainments
Amusement Device
§6-163
Owner 1293.00
§6-165
1 Operator 137.40
Dance
§6-62
Single event 145.00
§6-105
Dinner dance — (payable in 2 equal installments on 6/1 and 12/31)
2,658.50
Music Concert
§6-70A
I Single Event
45.00
§6-70A
Season
1,600
Special Event
§6-192
Permit
100.00
Chapter 10. Buildings and Building Regulations and Signs
Building Permit
§ 10-33
Permit fees
See Building Code
Fee Schedule
Plan review
See Building Code
Fee Schedule
State surcharge
See Building Code
Fee Schedule
F
Mechanical Permit
See Building Code
I Fee Schedule
ShedlAccessory Building Permit
See Building Code
Fee Schedule
§42-64
Fence Permit
See Building Code
Fee Schedule
§ 10-98
1 Sign Permit
Temporary Sign Permit
25.00
Temporary Sign Retainer
100.00
Temporary Sign Late Application Fee
200.00
Permanent Sign Permit
75.00
Permanent Sign Escrow Deposit
500.00
Permanent Sign Late Application Fee
50.00
Chapter 11. Docks
§ 11-12
Annual application fee — dock permit
200.00
§ 11-31
Violation — 1st offense
250.00
§ 11-31
Violation — 2nd offense
500.00
§ 11-31
Violation — 3'd offense
750.00
Chapter 12. Businesses
Cigarette/Tobacco Products License
§ 12-82
License to sell
25.00
Massage Services
§ 12-213
Annual fee for establishment
250.00
§ 12-213
Investigation Fee for establishment license
150.00
§12-243 Annual Certificate to Practice Fee for person
§ 12-243 Jnvestigation Fee — Certificate to Practice for person
Chapter 13. Peddlers, Solicitors and Transient Merchants
§13-32 License
1§ 3-32 (Food Truck Per Day l
Chapter 26. Secondhand Goods
Pawnbroker
§26.61 License
§ 26-63 Investigation
§ 26-64 I Band —
(Chapter 28. Solid Waste Management
§ 28-62 d Waste Collection License
1 st Vehicle
Each additional vehicle
i 28-64 performance Bond
FArt. III I Recycling bin
r-
r
Chapter 34. Utilities
§ 34-251 Plumbing permit
Public utilities
§ 34-41 Sewer minimum charge per quarter per unit
Sewer (per 1,000 gallons)
Sewer/Met Council Charge (per 1,000 gallons)
§ 34-11 Sewer connection
Water minimum charge per quarter per unit
§ 34-192 Water (per 1,000 gallons)
§ 34-221 Water connection
§ 34-224 Meter installation or removal
Turn on or turn off
Frost plate replacement
Repair of meter/mounting horn
100.00
150.00
25.00
25.00
100.00
1,000.00
50.00
125.00
1,000.00
— - 110.00
See Building Code
Fee Schedule
7.50
13.25
12.50
50.00
12.00
------]0-8999 2.50
9000-17,999 3.75
18,000+ 5.00
50.00
35.00
30.00
25.00
40.00
Test fee, residential per year
6.40
Test fee, commercial per year
6.40
§ 34-164
Special assessment search — water service application
10.00
§ 34-166
Lawn Sprinkling Violations
1 st violation
Written warning
2nd violation
50.00
3rd violation
75.00
4`h violation
150.00
Additional violations may result in misdemeanor prosecution
Copies (for nonresidents and mailed)
Council agenda's each 0.50 year
15.00
Council minutes each 2.50 year
75.00
Planning Commission agenda's
0.50 ea/7.50 yr
Planning Commission minutes
2.50 ea/50.00 yr
Any of the above — single page
0.25
Copies - miscellaneous page
0.25
Mailing Labels
10.00
Zoning Ordinance book
50.00
City Code book
165.00
Chapter 42. Zoning/Planning
§42.15
Land use (Single Family/2 Family Residential)
Fee/Escrow
Variance request
250/500
Vacation of public street, right of way or easement
15011,000
Rezoning application
200/300
Conditional use permit
200/500
Simple lot combination
100/1,000
Site Plan/Building Plan Review
250/750
Subdivision — Concept Plan Review
0/0
Subdivision — Preliminary Plat Review
300/1,000
Subdivision — Final Plat
300/1,000
Environmental Review
300/750
Ordinance Amendment or Rezoning
200/300
Appeals
0/0
Administrative Approvals
501100
r
§42.15
Land use (Multi family Residential & Commercial Land Use)
Fee/Escrow
Variance request
300/1,000
Vacation of public street, right of way or easement
300/500
Rezoning application
300/500
Conditional use permit
300/1,000
Simple lot combination
300/1,000
Site Plan Review
300/1,000
Subdivision —Concept Plan Review
300/1,000
Subdivision —Preliminary Plat Review
300/1,000
Subdivision — Final Plat
300/1,000
Environmental Review
300/750
Ordinance Amendment or Rezoning
300/500
Appeals
250/500
Administrative Approvals
501100
CITY OF SPRING PARK
BUILDING CODE FEE SCHEDULE
Residential Fees
(for permits that are issued over-the-counter and have flat -rate fees)
(Definition of residential: IRC-1 Single Family Dwelling: Any building that contains one dwelling unit
used, intended, or designed to be built, used, rented, leased, let, or hired out to be occupied, or occupied
for living purposes. IRC-2 Two -Family Dwelling: Any building that contains two separate dwelling units
with separation either horizontal or vertical on one lot used, intended, or designed to be built, used,
rented, leased, let, or hired out to be occupied, or occupied for living purposes. IRC-3 — Townhouse:
Definition: A single-family dwelling unit constructed in a group of two or more attached units in which each
unit extends from the foundation to the roof and having open space on at least two sides of each unit.
Each single-family dwelling unit shall be considered to be a separate building. Separate building service
utilities shall be provided to each single-family dwelling unit when required by other chapters of the State
Building Code. IRC-4 Accessory Structure: Definition: A structure not greater than 3000 ft2 in floor area,
and not over two stories in height, the use of which is customarily accessory to and incidental to that of
the dwelling(s) and which is located on the same lot.
Maintenance Permit Fees:
Re -Roof: $38.50 (see handout for building permit requirements) + State surcharge
Re -Side: $38.50 (see handout for building permit requirements) + State surcharge
Re -Window: $38.50 replacement of same size windows (Exception: egress windows —
see handout)
Re -Door (Exterior): $38.50 replacement of same -size exterior doors
Garage (overhead) door: $38.50 replacement of same size doors
Zoning Permit Fees:
• Shed (under 200 sq. ft.) $38.50; no state surcharge
Fence (under 7' in height) $38.50; no state surcharge
Retaining Wall (under 4' in height) $38.50; no state surcharge
(Sheds over 200 sq. ft., fences over 7' in height and retaining walls over 4' in height require building
permits submitted for plan review and permit fees are based on valuation)
Plumbing Permit Fees:
• New fixtures: $5.00 per fixture with $50.00 minimum fee
Plumbing change outs (water heaters and water softeners): $20.00 each plus state surcharge
Mechanical Permit Fees:
• New appliances: $38.00 each (furnace, air conditioner, in -floor heating system, gas water heater) plus
state surcharge
Gas Line (with mechanical permit): $10.00 per gas line, $20.00 minimum, plus state surcharge
Gas Line only permit: $45.00 plus state surcharge
Fire Place insert — $38.50 plus state surcharge
Fire Place (masonry) — Building permit required; fee based on valuation
Commercial Fees
(all projects not defined as residential above)
ALL Commercial permit applications require plan review, and permit fees are based on valuation
(includes, reroof, re -side, re -window, and re -door).
Plumbing and Mechanical Permit Fees - Valuation Based Permits (1.25% of contract price) with minimum
fees as follows:
Building Permit minimum: $75.00
Plumbing minimum: $55.00 + state surcharge
Mechanical minimum: $55.00 + state surcharge
Gas line minimum: $45.00 + state surcharge
Commercial Plumbing Plan Review:
Building Sewer and/or Water Service Only $150.00
Plumbing System:
25 or fewer drainage fixture units $150.00
26-50 drainage fixture units $250.00
51-150 drainage fixture units $350.00
151-249 drainage fixture units $500.00
250 + drainage fixture units $3.00 X # of drainage fixture units (max. $4,000)
I nterceptors/Separators $70.00/each
Storm Drainage System Minimum $150.00
Internal Roof drain opening $50.00/each; max. of $500.00
Storm Water Interceptor, Separator, or Catch Basin $70.00/each
Fire Sprinkler Systems require regular building permit; fees are based on valuation; no state surcharge
Fire Alarm Systems require regular building permit; fees are based on valuation
Demolition fees are based on valuation (contractor's cost estimate) and require a regular building permit
Valuation Based Fees
(Residential and Commercial building permit fees when plan review is required). -
Value up to
Fee
For the first
Plus
For each additional:
(and including):
$0 - $500
$38.50
$500
-
-
$500.01 - $2,000
$38.50
$500
$3.36
$100 or fraction thereof
$2,000.01 - $25,000
$88.90
$2000
$15.40
$1000 or fraction thereof
$25,000.01-$50,000
$443.10
$25,000
$11.11
$1000 or fraction thereof
$50,000.01-$100,000
$720.85
$50,000
$7.70
$1,000 or fraction thereof
$100,000.01-$500,000
$1,105.85
$100,000
$6.16
$1,000 or fraction thereof
$500,000.01-$1,000,000
$3,569.85
$500,000
$5.23
$1,000 or fraction thereof
$1,000,000.01 +
$6,184.85
$1,000,000
$4.02
$1,000 or fraction thereof
*Pursuant to MN Rules Chapter 1300.0160 subpart 3, Building permit valuations shall be set by the Building Official. For determining
the permit valuation, the Building Official will use the supplied valuation with a minimum value as calculated by the current Building
Valuation Data Table, published each May by the Department of Labor and Industry and other data, as needed, for projects not
otherwise specified.
Building Permit Related Fees — commercial and residential
Plan Check/Document Evaluation fee: 65% of the Permit Fee for Residential and Commercial
Projects. All valuation -based permits require plans/documents to be submitted for review
Residential Site Inspection (including initial S.E.C.), required for all new construction (new homes,
detached garages, accessory structures): $45.00
Commercial Site Inspection (including initial S.E.C.), required for all new construction (new
buildings and accessory structures): $90.00
S.E.C. (Soil and Erosion Control) $.0005 x permit valuation for all Building Permits except re -roof,
reside, window replacement, decks & interior remodels. Minimum $200.00 new home or commercial
construction; minimum $50.00 on any other non-exempt construction.
Demolition Permit Fees: Based on valuation; regular building permit required.
Exterior Structures:
Retaining Wall (over 4' in height): based on valuation
Fence (over 7' in height): based on valuation
Sheds (over 200 sq. feet): based on valuation
Pre -moved in single family dwelling — code compliance inspection: $165.00 plus travel time and
mileage from municipality office (as calculated by Google maps)
Pre -moved in accessory structure — code compliance inspection: $125.00 plus travel time and
mileage from municipality office (as calculated by Google maps)
Connection fee — Moved in structure: $275.00 (does not include foundation/interior remodel)
Manufactured home installation: $275.00 (does not include foundation/interior remodel) plus
connection fees (if applicable)
Electric Permit fees: See separate electric fee schedule
State Surcharge Fees
State Surcharge: Schedule is based on the currently adopted State Surcharge Table — per MN Statute
326B.148
State Surcharge is applicable on all permits unless otherwise noted.
Other Inspections and Fees
1. Re -inspection Fee - A re -inspection fee may be assessed for each inspection or reinspection when
such portion of work for which inspection is called is not complete or when corrections called for are not
made. On valuation -based building permits, this fee is not to be interpreted as requiring re -inspection fees
the first time a job is rejected for failure to comply with the requirements of the code, but as controlling the
practice of calling for inspections before the job is ready for such inspection or re -inspection. Reinspection
fees shall also be assessed when: 1) the address of the jobsite is not posted, 2) the inspection record
card is not posted or provided at the worksite, 3) the approved plans are not readily available for the
inspector, 4) full access to the site is not provided for the inspector, 5) the inspector is not met by the
responsible individual (no show), 6) on residential (IRC) maintenance permits where corrections are
required to be inspected, and 7) deviations from the approved plans occur without prior building official
approval. Re -inspection fees are due on or before the re -inspection. Payment shall be made payable to
the Municipality: $60 each
2. Inspections outside of normal business hours (will include travel time both ways — 2 hour
minimum): $120/hr
3. Inspections for which no fee is indicated, Miscellaneous and Special Services
(1 hour minimum): $60/hr
4. Additional Plan Review required by changes, additions, or revisions to approved plans
('h hour minimum) $60/hr
5. Special Investigation fee (work started without obtaining a permit) — applies whether
permit is issued or not: 100% of permit fee
6. Copy charge (black/white 8'/2 x 11) — per side $.25/sheet
Permit Valuation is based on supplied construction value with a minimum of the calculated value from the
approved building department valuation schedule.
Adopted by the City Council of Spring Park on the 10`h day of July, 2017
City of
By
Attest:
By
TheiVsa Schyma, City Clerk
Jerome P/. Rockvam, Mayor