Loading...
Ordinance - 21-01 - Schedule of Fees and ChargesCITY OF SPRING PARK SPRING PARK, MN ORDINANCE 21-01 AMENDMENT AND RESTATEMENT OF CITY CODE APPENDIX A — SCHEDULE OF FEES AND CHARGES Chapter 1. General Administration Administrative Citations and Fines §1-14 General fines for violations/citations First offense 100.00 Second offense 150.00 Third offense (and all subsequent offenses) 200.00 Chapter 4. Alcoholic Beverages Alcohol §4-31(c) Beer, 3.2 on -sale 532.00 F§4-31(a) Beer, 3.2 off -sale 80.00 §4-31 (b) Taproom, growler off -sale 100.00 §4-31 (d) Taproom, on -sale 2,000.00 §4-31(c) I Liquor, intoxicating on -sale (payable in 2 equal installments on 6/1 and 12/31) 10,050.00 §4-31(e) Liquor, intoxicating Sunday sale 200.00 §4-31(a) Liquor, intoxicating off -sale 100.00 §4-92 Wine, on sale 1,064.00 Chapter 6. Amusements and Entertainments Amusement Device §6-163 Owner 293.00 §6-165 1 Operator 37.40 Dance §6-62 Single event 45.00 §6-105 Dinner dance — (payable in 2 equal installments on 6/1 and 12/31) 2,658.50 (Music Concert §6-70A Single Event 45.00 §6-70A Season 1,600 Special Event Fee/Escrow §6-192 Single Event Permit 100/250 Single Event Permit with Live or Amplified Music 250/500 Multi -Day Event Permit 250/1,000 + 100 for each additional day Chapter 10. Buildings and Building Regulations and Signs Building Permit § 10-33 Permit fees See Building Code Fee Schedule Plan review See Building Code Fee Schedule State surcharge See Building Code Fee Schedule Mechanical Permit See Building Code Fee Schedule ShedlAccessory Building Permit See Building Code Fee Schedule §42-64 Fence Permit See Building Code Fee Schedule § 10-98 1 Sign Permit Temporary Sign Permit 35.00 Permanent Sign Permit 175.00 Permanent Sign Escrow Deposit 1500.00 Permanent/Temporary Sign Late Application Fee 150.00 IChapter 11. R-3 Docks § 11-12 jAnnual application fee — dock permit 1200.00 §11-31 Violation — I" offense 250.00 § 11-31 Violation — 2nd offense 500.00 §11-31 Violation — 3rd offense 1750.00 Chapter 12. Businesses Cigarette/Tobacco Products License § 12-82 License to sell 25.00 Massage Services §12-213 Annual fee for establishment 250.00 §12-213 Investigation Fee for establishment license 150.00 § 12-243 Annual Certificate to Practice Fee for person 100.00 § 12-243 Investigation Fee — Certificate to Practice for person 150.00 Chapter 13. Peddlers, Solicitors and Transient Merchants §13-32 License 25.00 § 13-32 Food Truck License 75.00 Investigation Fee (if investigation is required by City Code) 150.00 Chapter 26. Secondhand Goods Pawnbroker §26.61 License 25.00 §26-63 1 Investigation Fee 150.00 §26-64 Bond 1,000.00 Chapter 28. Solid Waste Management §28-62 Solid Waste Collection License 1 sc Vehicle 50.00 Each additional vehicle 25.00 §28-64 1 Performance Bond 1,000.00 Chapter 32. Streets, Sidewalks, and Other Public Places 11§32-92 Excavation Permit 10015,000 Chapter 34. Utilities §34-251 Plumbing permit uilding Code FFeehedule Public utilities §34-41 Sewer minimum charge per quarter per unit 20.00 Sewer (per 1,000 gallons) 3:33 Sewer/Met Council Charge (per 1,000 gallons) 3:33 §34-11 Sewer connection 50.00 Water minimum charge per quarter per unit 20.00 §34-192 Water (per 1,000 gallons) 0-8999 2.65 9000-17,999 3.98 18,000+ 5.31 I §34-221 I Water connection I50.00 §34-224 Meter/radio read unit installation or removal 35.00 Replace lost or damaged meter (due to tampering) 195.00 Replace lost or damaged radio read unit (due to tampering) 140.00 Turn on or turn off 30.00 Frost plate replacement 25.00 Repair of meter/mounting horn/radio read unit 40.00 Test fee, residential per year 6.40 Test fee, commercial per year 6.40 Second water meter fee 335.00 §34-164 1 Special assessment search — water service application 10.00 334-166 Lawn Sprinkling Violations 1 st violation Written warning 2nd violation 50.00 3rd violation 75.00 4th violation 150.00 Additional violations may result in misdemeanor prosecution Chapter 36. Telecommunications §36-27 Excavation Permit Excavation Permit Base Fee 100.00 Excavation Permit Escrow Fee 5,000.00 Excavation Obstruction Permit Fee 100.00 jMiscellaneous Fees Copies 0.25 per page after first 30 Ordinance book Same as (Zoning �Copies City Code book Same as Copies NSF check fee 30.00 False alarm fee 1 st 0.00 2nd 0.00 3rd 50.00 4" 100.00 5" + 250.00 Candidate fling fee 2.00 Chapter 42. Zoning/Planning §42.15 Land use (Single Family/2 Family Residential) Fee/Escrow Variance request 50011,500 Vacation of public street, right of way or easement 15011,000 Rezoning application 200/300 Conditional use permit 50011,500 Interim Use Permit 50011,500 Interim Use Permit Inspection Fee (Short -Term Rental) 150 Simple lot combination 100/1,000 Site Plan/Building Plan Review 250/750 Subdivision — Concept Plan Review 0/0 Subdivision — Preliminary Plat Review 300/1,000 Subdivision — Final Plat 300/1,000 Environmental Review 300/750 Ordinance Amendment or Rezoning 200/300 Appeals 0/0 Administrative Approvals 50/100 §42.15 Land use (Multi family Residential & Commercial Land Use) Fee/Escrow Variance request 500/1,500 Vacation of public street, right of way or easement 300/500 Rezoning application 300/500 Conditional use permit 500/1,500 Simple lot combination 300/1,000 Site Plan Review 300/1,000 Subdivision —Concept Plan Review 300/1,000 Subdivision —Preliminary Plat Review 300/1,000 Subdivision — Final Plat 300/1,000 Environmental Review 300/750 Ordinance Amendment or Rezoning 300/500 Appeals 250/500 Administrative Approvals 501100 Effective Date: January 1, 2019 CITY OF SPRING PARK BUILDING CODE FEE SCHEDULE Residential Fees (for permits that are issued over-the-counter and have flat -rate fees) (Definition of residential: IRC-1 Single Family Dwelling: Any building that contains one dwelling unit used, intended, or designed to be built, used, rented, leased, let, or hired out to be occupied, or occupied for living purposes. IRC-2 Two -Family Dwelling: Any building that contains two separate dwelling units with separation either horizontal or vertical on one lot used, intended, or designed to be built, used, rented, leased, let, or hired out to be occupied, or occupied for living purposes. IRC-3 — Townhouse: Definition: A single-family dwelling unit constructed in a group of two or more attached units in which each unit extends from the foundation to the roof and having open space on at least two sides of each unit. Each single-family dwelling unit shall be considered to be a separate building. Separate building service utilities shall be provided to each single-family dwelling unit when required by other chapters of the State Building Code. IRC-4 Accessory Structure: Definition: A structure not greater than 3000 ftz in floor area, and not over two stories in height, the use of which is customarily accessory to and incidental to that of the dwelling(s) and which is located on the same lot Maintenance Permit Fees: • Re -Roof: $50.00 see handout for when building permit is required • Re -Side: $50.00 see handout for when building permit is required • Re -Window: $50.00 replacement of same size windows (Exception: egress windows — see handout) • Re -Door (Exterior): $50.00 replacement of same -size exterior doors • Garage (overhead) door: $50.00 replacement of same size doors Zoning Permit Fees: • Shed (under 200 sq. ft.) $50.00 no state surcharge • Fence (under 7' in height) $50.00 no state surcharge • Retaining Wall (under 4' in height) $50.00 no state surcharge (Fences over 7' in height and retaining walls over 4' in height require building permits submitted for plan review and are based on valuation) Plumbing Permit Fees: • New fixtures: $10.00 per fixture, ($75.00 minimum) • Lawn Irrigation Systems: $50.00 • Fixture Maintenance: $50.00 (This permit is for replacing a previously existing fixture or appliance where only disconnecting and reconnecting of existing pipes or ducts is to be done. Changing vent systems, running new drain or supply lines, or replacing or installing new ductwork, pipes, or vents is not fixture maintenance. Examples include Sink, Toilet, Water Softener, or Water Heater Replacement.) Mechanical Permit Fees: • New appliances: $37.50 per appliance ($75.00 minimum) (for new construction only: furnace and A/C are considered one unit) • Gas Line (with mechanical permit): $15.00 per gas line, $30.00 minimum • Gas Line only permit: $50.00 • Fire Place insert — see Above (Mechanical Permits) • Fire Place masonry — Based on valuation (building permit required) • Fixture Maintenance: $50.00 (This permit is for replacing a previously existing appliance where only disconnecting and reconnecting of existing pipes or ducts is to be done. Changing vent systems, running new gas lines, or replacing or installing new ductwork, pipes, or vents is not fixture maintenance. Examples include Furnace, Boiler, or A/C Replacement.) Commercial Fees (includes all projects not defined as residential on page 1) ALL Commercial permit applications require plan review, and permit fees are based on valuation (includes, re -roof, re -side, re -window, and re -door). Plumbing and Mechanical Permit Fees = Valuation Based Permits Building Permit minimum: $75.00 Plumbing minimum: $75.00 Mechanical minimum: $75.00 Gas line minimum (unless included with other mechanical work): $50.00 Fire Sprinkler Systems require regular building permit; fees are based on valuation Fire Alarm Systems require regular building permit; fees are based on valuation Valuation Based Fees (Residential and Commercial building permit fees when plan review is required) Fee Schedule Base: 1997 +25% Value up to (and including): For the first: Plus For each additional: $1,200 $75.00 1,200 - $2,000 $75.00 1,200 $3.50 $100 or fraction thereof $25,000 $102.50 $2,000 $17.75 $1,000 or fraction thereof $50,000 $510.75 $25,000 $12.75 $1,000 or fraction thereof $100,000 $829.50 $50,000 1 $8.85 $1,000 or fraction thereof $500,000 $1272.00 $100,000 $7.10 $1,000 or fraction thereof $1,000,000 $4112.00 $500,000 $6.00 $1,000 or fraction thereof 1,000,001 and u $7112.00 $1,000,000 $5.00 $1,000 or fraction thereof 'Pursuant to MN Rules Chapter 1300.0160 subpart 3, Building permit valuations shall be set by the Building Official. For determining the permit valuation, the Building Official will use the supplied valuation with a minimum value as calculated by the current Building Valuation Data Table, published each May by the Department of Labor and Industry and other data, as needed, for projects not otherwise specified. Buildina Permit Related Fees — commercial and/or residential • Plan Check/Document Evaluation fee: 65% of the Permit Fee for Residential and Commercial Projects when valuation -based permits require plans/documents to be submitted for review, including required plumbing plan review. • Master Plan: When submittal documents for similar plans are approved, plan review fees shall not exceed 25 percent of the normal building permit fee established and charged for the same structure. Plan review fees for the master plan review is 65% of the permit fee. • Review of state approved plans: 25% of the plan review required by the adopted fee schedule (for orientation to the plans) • Residential Site Inspection (including initial S.E.C.), required for all new construction (new homes, detached garages, accessory structures) $50.00 • Commercial Site Inspection (includinq initial S.E.C.), required for all new construction (new buildings and accessory structures) $90.00 • S.E.C. (Soil and Erosion Control) $.0006 x permit valuation for all Building Permits except re -roof, re- side, window replacement, decks & interior remodels. Minimum $150.00 new home or commercial construction, minimum $50.00 on any other non-exempt construction. • Demolition Permit Fees: Based on valuation • Exterior Structures: 2 Retaining Wall (over 4' in height): based on valuation Fence (over 7' in height): based on valuation Sheds (over 200 sq. feet): based on valuation Swimming Pools: Seasonal Swimming Pools: $50.00 Seasonal residential swimming pools requiring permits (over 24" and 5000 gallons, installed entirely above grade) are allowed to be installed with a single application and approval provided that the same pool is installed in the same location each year. Once approved, the pool may be put up and taken down any number of times. A site plan is required to be approved as a part of the permit submittal, and must be kept on site for review as needed.) Permanent and In -ground Swimming Pools: Based on Valuation Moved in Structures: • Pre -moved in single family dwelling - code compliance inspection: $175.00 plus travel time and mileage from municipality office (as calculated by Google maps) • Pre -moved in accessory structure - code compliance inspection: $125.00 plus travel time and mileage from municipality office (as calculated by Google maps) • Connection fee - Moved in structure: $200.00 (does not include foundation/interior remodel) • Manufactured home installation: $275.00 (does not include foundation/interior remodel) plus connection fees (if applicable) • Connection fee - plumbing: $50.00 • Connection fee - mechanical: $50.00 • Site work for manufactured, prefab, or moved in home (foundation, basement, etc.): valuation based Electrical Permits A Minimum Fee Per Inspection Trip - Includes 4 circuits more than 4 see Section D below $40.00 Additional Inspection trips for Reins ection/Bondin /E ui otential Plane/etc. $40.00 B Residential - one and two-family dwelling units (up to 3 trips included Per unit 1. New Dwelling Unit, up to and including a 200 amp service ....................................... $125.00 2. New Dwelling Unit, 201 amp to 400 amp service ................................................... $175.00 3. Existing Dwelling unit, additions, alterations, or repairs up to & including a 200 amp service, fees as per C&D below but not to exceed ................................................. $125.00 4. Existing Dwelling Unit, additions, alterations, or repairs 201 amp to 40 amp service, fees as per C&D below but not to exceed............................................................ $175.00 5. New or Existing Dwelling unit, 401 amp service or above ........................................ See C & D C New or Upgraded Services, Temp. Services, Generators, Other power supply sources, or feeders to separate structures Each 1. Up to and including 200 amp service.................................................................. $50.00 2. 201 amp to and including 400 amp service.......................................................... $100.00 3. 401 amp to and including 800 amp service.......................................................... $200.00 4. 801 amp service and above.............................................................................. $300.00 D Fees for circuits/feeders & Transformers Per circuit 1. 0 to 200 amp................................................................................................. $10.00 2. Above 200 amp............................................................................................. $15.00 3. Transformers up to 10 KVA.............................................................................. $20.00 4. Transformers over 10 KVA............................................................................... $30.00 E Multi -Family Dwellings Per unit 1. Each dwelling unit $50.00 F Alarm, Communication, Signaling Circuits, or less than 50 volts Each 1. Each system device or apparatus $0.50 G For inspections not covered on this form or for required special inspections (hourly) $60.00 H Commercial plan review fee if required) is 25% of Total Permit Fee I Work started or finished without permit is 2 times the required permit fee 3 State Surcharge Fees State Surcharge: Schedule is based on the currently adopted State Surcharge Table - per MN Statute 326B.148 State Surcharge is applicable on all permits unless otherwise noted. Other Inspections and Fees 1. Re -inspection Fee - A re -inspection fee may be assessed for each inspection or re - inspection when such portion of work for which inspection is called is not complete or when corrections called for are not made. On valuation -based building permits, this fee is not to be interpreted as requiring re -inspection fees the first time a job is rejected for failure to comply with the requirements of the code, but as controlling the practice of calling for inspections before the job is ready for such inspection or re -inspection. Re - inspection fees shall also be assessed when: 1) the address of the jobsite is not posted, 2) the inspection record card is not posted or provided at the worksite, 3) the approved plans are not readily available for the inspector, 4) full access to the site is not provided for the inspector, 5) the inspector is not met by the responsible individual (no show), 6) on residential (IRC) maintenance permits where corrections are required to be inspected, and 7) deviations from the approved plans occur without prior building official approval. Re -inspection fees are due on or before the re -inspection. Payment shall be made payable to the Municipality: $60 each 2. Inspections outside of normal business hours (will include travel time both ways - 2 hour $75/hr. minimum): 3. Inspections for which no fee is indicated, Miscellaneous and Special Services (1/2 hour minimum): $75/hr. 4. Additional Plan Review required by changes, additions, or revisions to approved plans $75/hr. '/2 hour minimum): 5. Special Investigation fee (work started without obtaining a permit) - applies whether 100% of permit is issued or not: permit fee 6. 1 Copy charge black/white 8'/2 x 11 - per side: $.25/sheet 7. Copy char e black/white 11 x 17 and 8'/z x 14) - per side: $.50/sheet 8. Copy charge color 8'/2 x 11 - per side: $1.00/sheet 9. Copy charge color 11 x 17 and 8'/2 x 14 - per side: $2.00/sheet 10. Print or Copy charge (large plan sheet color or black/white $4.00 11. Replacement permit card fee - short card 8 '/2 x 7): $25.00 12. Re lacement permit card fee - long card 8'/ x 14): $40.00 13. License Look -Up contractor license verification): $5.00 14. Lead Certification for eligible construction contractor Lead Certification Verification): $5.00 15. Permit Renewal within 6 mos. of expiration (no plan changes, no code changes, new 50% of permit number): original permit fee 16. Change of Use of occupancy classification: $100.00 17. Pre -Final inspection new home or structure - 2 hour minimum: $75/hr. 18. Temporary Certificate of Occupancy - Escrow less costs to administer)** $1,000.00 19. Refunds: Plan review if plan review has not started 100% Plan review if plan review has started -partial) 50% Plan review if plan review has been completed) 0% Permit fee if work has not started within 6 months of permit issuance by municipality 75% Maintenance Permits 0% LI Permit Valuation is based on supplied construction value with a minimum of the calculated value from the approved building department valuation schedule. "This would be a City imposed fee. Adopted by the City Council of Spring Park on the 4ch day of October, 2021 City of Sprin Park By: , Jerome P. Rockvam, Mayor A'tes By: a ie Hoffman, City I 5 J 6 , AFFIDAVIT OF PUBLICATION CITY OF SPRING PARK SPRING PARK, STATE OF MINNESOTA ) MINNESOTA ss COUNTY OF CARVER SUMMARY PUBLICATION ORDINANCE NO.21-01 AN ORDINANCE Karen Nelson being duly sworn on an oath, AMENDING AND states or affirms that he/she is the Publisher's RESTATING APPENDIX A OF THE CITY Designated Agent of the newspaper(s)known g g CODE —SCHEDULE OF as: FEES AND CHARGES Laker Pioneer This summary of the ordinance is published pursuant to Minnesota with the known office of issue being located Statue 331A.01, Subd. 10. in the county of: On October 4,2021 the Spring CARVER Park City Council adopted Ordi- with additional circulation in the counties of: nance No. 21-01 amending and restating Appendix A of the Spring HENNEPIN Park City Code regarding schedule and has full knowledge of the facts stated of fees and charges. below: (A) The newspaper has complied with all of This ordinance makes the fol- lowing fee changes to 'the City the requirements constituting qualifica- Code: excavation permit base fee tion as a qualified newspaper as provided $100.00, excavation permit escrow by Minn. Stat. §331A.02. fee $5,000.00, excavation obstruc- This Public Notice was printed and pub- ( ) P p tionB ordi- This fees npermit fee he f$10ollo0.wing Hance adjusts the following fees for lished in said newspaper(s) once each variance requests, interim use per - week, for 1 successive week(s); the first mits, and conditional use permits insertion being on 11/27/2021 and the last to $500.00 base fee plus $1,500.00 insertion beingon 11/27/2021. escrow fee & interim use permit inspection fee (short-term rental) $150.00. MORTGAGE FORECLOSURE NOTICES Pursuant to Minnesota Stat. §580.033 Copies of the ordinance are available for public inspection in relating to the publication of mortgage the City Clerk's office during normal foreclosure notices: The newspaper complies business hours or upon request by with the conditions described in §580,033, calling Spring Park City Hall at 952- subd. 1, clause (1) or (2). If the newspaper's 471-9051. known office of issue is located in a county ADOPTED by the City Council of adjoining the county where the mortgaged the City of Spring Park this 4th day premises or some part of the mortgaged of October, 2021. premises described in the notice are located, Jamie Hoffman, City Clerk a substantial portion of the newspaper's Published in the circulation is in the latter county. Laker Pioneer November 27, 2021 �[ By: T \OL�t�_ � �� 118 Designated Agent Subscribed and sworn to or affirmed before me on 11/27/2021 by Karen Nelson. Notary Public DARLENE MARIE MACCPHSW N NOTARY PUBLIC.MINNESOTA My Cow FOtp n Jan 31. 2024 Rate Information: (1) Lowest classified rate paid by commercial users for comparable space: $15.00 per column inch Ad ID 1184714