Ordinance - 21-01 - Schedule of Fees and ChargesCITY OF SPRING PARK
SPRING PARK, MN
ORDINANCE 21-01
AMENDMENT AND RESTATEMENT OF CITY CODE
APPENDIX A — SCHEDULE OF FEES AND CHARGES
Chapter 1. General Administration
Administrative Citations and Fines
§1-14
General fines for violations/citations
First offense
100.00
Second offense
150.00
Third offense (and all subsequent offenses)
200.00
Chapter 4. Alcoholic Beverages
Alcohol
§4-31(c)
Beer, 3.2 on -sale
532.00
F§4-31(a)
Beer, 3.2 off -sale
80.00
§4-31 (b)
Taproom, growler off -sale
100.00
§4-31 (d)
Taproom, on -sale
2,000.00
§4-31(c)
I Liquor, intoxicating on -sale (payable in 2 equal installments on 6/1 and 12/31)
10,050.00
§4-31(e)
Liquor, intoxicating Sunday sale
200.00
§4-31(a)
Liquor, intoxicating off -sale
100.00
§4-92
Wine, on sale
1,064.00
Chapter 6. Amusements and Entertainments
Amusement Device
§6-163
Owner
293.00
§6-165
1 Operator
37.40
Dance
§6-62
Single event
45.00
§6-105
Dinner dance — (payable in 2 equal installments on 6/1 and 12/31)
2,658.50
(Music Concert
§6-70A
Single Event
45.00
§6-70A
Season
1,600
Special Event
Fee/Escrow
§6-192
Single Event Permit
100/250
Single Event Permit with Live or Amplified Music
250/500
Multi -Day Event Permit
250/1,000
+ 100 for each
additional day
Chapter 10. Buildings and Building Regulations and Signs
Building Permit
§ 10-33
Permit fees
See Building Code
Fee Schedule
Plan review
See Building Code
Fee Schedule
State surcharge
See Building Code
Fee Schedule
Mechanical Permit
See Building Code
Fee Schedule
ShedlAccessory Building Permit
See Building Code
Fee Schedule
§42-64
Fence Permit
See Building Code
Fee Schedule
§ 10-98
1 Sign Permit
Temporary Sign Permit
35.00
Permanent Sign Permit 175.00
Permanent Sign Escrow Deposit 1500.00
Permanent/Temporary Sign Late Application Fee 150.00
IChapter 11. R-3 Docks
§ 11-12
jAnnual application fee — dock permit
1200.00
§11-31
Violation — I" offense
250.00
§ 11-31
Violation — 2nd offense
500.00
§11-31
Violation — 3rd offense
1750.00
Chapter 12. Businesses
Cigarette/Tobacco Products License
§ 12-82
License to sell
25.00
Massage Services
§12-213
Annual fee for establishment
250.00
§12-213
Investigation Fee for establishment license
150.00
§ 12-243
Annual Certificate to Practice Fee for person
100.00
§ 12-243
Investigation Fee — Certificate to Practice for person
150.00
Chapter 13. Peddlers, Solicitors and Transient Merchants
§13-32
License
25.00
§ 13-32
Food Truck License
75.00
Investigation Fee (if investigation is required by City Code)
150.00
Chapter 26. Secondhand Goods
Pawnbroker
§26.61
License
25.00
§26-63 1
Investigation Fee
150.00
§26-64
Bond
1,000.00
Chapter 28. Solid Waste Management
§28-62
Solid Waste Collection License
1 sc Vehicle
50.00
Each additional vehicle
25.00
§28-64 1
Performance Bond
1,000.00
Chapter 32. Streets, Sidewalks, and Other Public Places
11§32-92
Excavation Permit
10015,000
Chapter 34. Utilities
§34-251
Plumbing permit
uilding Code
FFeehedule
Public utilities
§34-41
Sewer minimum charge per quarter per unit
20.00
Sewer (per 1,000 gallons)
3:33
Sewer/Met Council Charge (per 1,000 gallons)
3:33
§34-11
Sewer connection
50.00
Water minimum charge per quarter per unit
20.00
§34-192
Water (per 1,000 gallons)
0-8999
2.65
9000-17,999
3.98
18,000+
5.31
I §34-221
I Water connection
I50.00
§34-224
Meter/radio read unit installation or removal
35.00
Replace lost or damaged meter (due to tampering)
195.00
Replace lost or damaged radio read unit (due to tampering)
140.00
Turn on or turn off
30.00
Frost plate replacement
25.00
Repair of meter/mounting horn/radio read unit
40.00
Test fee, residential per year
6.40
Test fee, commercial per year
6.40
Second water meter fee
335.00
§34-164
1 Special assessment search — water service application
10.00
334-166
Lawn Sprinkling Violations
1 st violation
Written warning
2nd violation
50.00
3rd violation
75.00
4th violation
150.00
Additional violations may result in misdemeanor prosecution
Chapter 36. Telecommunications
§36-27
Excavation Permit
Excavation Permit Base Fee
100.00
Excavation Permit Escrow Fee
5,000.00
Excavation Obstruction Permit Fee
100.00
jMiscellaneous Fees
Copies 0.25 per page
after first 30
Ordinance book
Same as
(Zoning
�Copies
City Code book
Same as
Copies
NSF check fee
30.00
False alarm fee
1 st 0.00
2nd 0.00
3rd 50.00
4" 100.00
5" + 250.00
Candidate fling fee 2.00
Chapter 42. Zoning/Planning
§42.15
Land use (Single Family/2 Family Residential)
Fee/Escrow
Variance request
50011,500
Vacation of public street, right of way or easement
15011,000
Rezoning application
200/300
Conditional use permit
50011,500
Interim Use Permit
50011,500
Interim Use Permit Inspection Fee (Short -Term Rental)
150
Simple lot combination
100/1,000
Site Plan/Building Plan Review
250/750
Subdivision — Concept Plan Review
0/0
Subdivision — Preliminary Plat Review
300/1,000
Subdivision — Final Plat
300/1,000
Environmental Review
300/750
Ordinance Amendment or Rezoning
200/300
Appeals
0/0
Administrative Approvals
50/100
§42.15
Land use (Multi family Residential & Commercial Land Use)
Fee/Escrow
Variance request
500/1,500
Vacation of public street, right of way or easement
300/500
Rezoning application
300/500
Conditional use permit
500/1,500
Simple lot combination
300/1,000
Site Plan Review
300/1,000
Subdivision —Concept Plan Review
300/1,000
Subdivision —Preliminary Plat Review
300/1,000
Subdivision — Final Plat
300/1,000
Environmental Review
300/750
Ordinance Amendment or Rezoning
300/500
Appeals
250/500
Administrative Approvals
501100
Effective Date: January 1, 2019
CITY OF SPRING PARK
BUILDING CODE FEE SCHEDULE
Residential Fees
(for permits that are issued over-the-counter and have flat -rate fees)
(Definition of residential: IRC-1 Single Family Dwelling: Any building that contains one dwelling unit used,
intended, or designed to be built, used, rented, leased, let, or hired out to be occupied, or occupied for living
purposes. IRC-2 Two -Family Dwelling: Any building that contains two separate dwelling units with separation
either horizontal or vertical on one lot used, intended, or designed to be built, used, rented, leased, let, or hired
out to be occupied, or occupied for living purposes. IRC-3 — Townhouse: Definition: A single-family dwelling unit
constructed in a group of two or more attached units in which each unit extends from the foundation to the roof
and having open space on at least two sides of each unit. Each single-family dwelling unit shall be considered to
be a separate building. Separate building service utilities shall be provided to each single-family dwelling unit
when required by other chapters of the State Building Code. IRC-4 Accessory Structure: Definition: A
structure not greater than 3000 ftz in floor area, and not over two stories in height, the use of which is customarily
accessory to and incidental to that of the dwelling(s) and which is located on the same lot
Maintenance Permit Fees:
• Re -Roof: $50.00 see handout for when building permit is required
• Re -Side: $50.00 see handout for when building permit is required
• Re -Window: $50.00 replacement of same size windows (Exception: egress windows —
see handout)
• Re -Door (Exterior): $50.00 replacement of same -size exterior doors
• Garage (overhead) door: $50.00 replacement of same size doors
Zoning Permit Fees:
• Shed (under 200 sq. ft.) $50.00 no state surcharge
• Fence (under 7' in height) $50.00 no state surcharge
• Retaining Wall
(under 4' in height) $50.00 no state surcharge
(Fences over 7' in height and retaining walls over 4' in height require building permits submitted for plan
review and are based on valuation)
Plumbing Permit Fees:
• New fixtures: $10.00 per fixture, ($75.00 minimum)
• Lawn Irrigation Systems: $50.00
• Fixture Maintenance: $50.00 (This permit is for replacing a previously existing fixture or appliance where
only disconnecting and reconnecting of existing pipes or ducts is to be done. Changing vent systems,
running new drain or supply lines, or replacing or installing new ductwork, pipes, or vents is not fixture
maintenance. Examples include Sink, Toilet, Water Softener, or Water Heater Replacement.)
Mechanical Permit Fees:
• New appliances: $37.50 per appliance ($75.00 minimum) (for new construction only: furnace and A/C are
considered one unit)
• Gas Line (with mechanical permit): $15.00 per gas line, $30.00 minimum
• Gas Line only permit: $50.00
• Fire Place insert — see Above (Mechanical Permits)
• Fire Place masonry — Based on valuation (building permit required)
• Fixture Maintenance: $50.00 (This permit is for replacing a previously existing appliance where only
disconnecting and reconnecting of existing pipes or ducts is to be done. Changing vent systems, running
new gas lines, or replacing or installing new ductwork, pipes, or vents is not fixture maintenance.
Examples include Furnace, Boiler, or A/C Replacement.)
Commercial Fees
(includes all projects not defined as residential on page 1)
ALL Commercial permit applications require plan review, and permit fees are based on valuation (includes,
re -roof, re -side, re -window, and re -door).
Plumbing and Mechanical Permit Fees = Valuation Based Permits
Building Permit minimum: $75.00
Plumbing minimum: $75.00
Mechanical minimum: $75.00
Gas line minimum (unless included with other mechanical work): $50.00
Fire Sprinkler Systems require regular building permit; fees are based on valuation
Fire Alarm Systems require regular building permit; fees are based on valuation
Valuation Based Fees
(Residential and Commercial building permit fees when plan review is required)
Fee Schedule Base: 1997 +25%
Value up to (and
including):
For the first:
Plus
For each additional:
$1,200
$75.00
1,200
-
$2,000
$75.00
1,200
$3.50
$100 or fraction thereof
$25,000
$102.50
$2,000
$17.75
$1,000 or fraction thereof
$50,000
$510.75
$25,000
$12.75
$1,000 or fraction thereof
$100,000
$829.50
$50,000
1 $8.85
$1,000 or fraction thereof
$500,000
$1272.00
$100,000
$7.10
$1,000 or fraction thereof
$1,000,000
$4112.00
$500,000
$6.00
$1,000 or fraction thereof
1,000,001 and u
$7112.00
$1,000,000
$5.00
$1,000 or fraction thereof
'Pursuant to MN Rules Chapter 1300.0160 subpart 3, Building permit valuations shall be set by the Building Official. For determining the
permit valuation, the Building Official will use the supplied valuation with a minimum value as calculated by the current Building Valuation Data
Table, published each May by the Department of Labor and Industry and other data, as needed, for projects not otherwise specified.
Buildina Permit Related Fees — commercial and/or residential
• Plan Check/Document Evaluation fee: 65% of the Permit Fee for Residential and Commercial Projects
when valuation -based permits require plans/documents to be submitted for review, including required
plumbing plan review.
• Master Plan: When submittal documents for similar plans are approved, plan review fees shall not
exceed 25 percent of the normal building permit fee established and charged for the same structure.
Plan review fees for the master plan review is 65% of the permit fee.
• Review of state approved plans: 25% of the plan review required by the adopted fee schedule (for
orientation to the plans)
• Residential Site Inspection (including initial S.E.C.), required for all new construction (new homes,
detached garages, accessory structures) $50.00
• Commercial Site Inspection (includinq initial S.E.C.), required for all new construction (new buildings
and accessory structures) $90.00
• S.E.C. (Soil and Erosion Control) $.0006 x permit valuation for all Building Permits except re -roof, re-
side, window replacement, decks & interior remodels. Minimum $150.00 new home or commercial
construction, minimum $50.00 on any other non-exempt construction.
• Demolition Permit Fees: Based on valuation
• Exterior Structures:
2
Retaining Wall (over 4' in height): based on valuation
Fence (over 7' in height): based on valuation
Sheds (over 200 sq. feet): based on valuation
Swimming Pools:
Seasonal Swimming Pools: $50.00
Seasonal residential swimming pools requiring permits (over 24" and 5000 gallons, installed
entirely above grade) are allowed to be installed with a single application and approval
provided that the same pool is installed in the same location each year. Once approved, the
pool may be put up and taken down any number of times. A site plan is required to be
approved as a part of the permit submittal, and must be kept on site for review as needed.)
Permanent and In -ground Swimming Pools: Based on Valuation
Moved in Structures:
• Pre -moved in single family dwelling - code compliance inspection: $175.00 plus travel time and
mileage from municipality office (as calculated by Google maps)
• Pre -moved in accessory structure - code compliance inspection: $125.00 plus travel time and
mileage from municipality office (as calculated by Google maps)
• Connection fee - Moved in structure: $200.00 (does not include foundation/interior remodel)
• Manufactured home installation: $275.00 (does not include foundation/interior remodel) plus
connection fees (if applicable)
• Connection fee - plumbing: $50.00
• Connection fee - mechanical: $50.00
• Site work for manufactured, prefab, or moved in home (foundation, basement, etc.): valuation
based
Electrical Permits
A
Minimum Fee Per Inspection Trip - Includes 4 circuits more than 4 see Section D below
$40.00
Additional Inspection trips for Reins ection/Bondin /E ui otential Plane/etc.
$40.00
B
Residential - one and two-family dwelling units (up to 3 trips included
Per unit
1. New Dwelling Unit, up to and including a 200 amp service .......................................
$125.00
2. New Dwelling Unit, 201 amp to 400 amp service ...................................................
$175.00
3. Existing Dwelling unit, additions, alterations, or repairs up to & including a 200 amp
service, fees as per C&D below but not to exceed .................................................
$125.00
4. Existing Dwelling Unit, additions, alterations, or repairs 201 amp to 40 amp service,
fees as per C&D below but not to exceed............................................................
$175.00
5. New or Existing Dwelling unit, 401 amp service or above ........................................
See C & D
C
New or Upgraded Services, Temp. Services, Generators, Other power supply sources, or
feeders to separate structures
Each
1. Up to and including 200 amp service..................................................................
$50.00
2. 201 amp to and including 400 amp service..........................................................
$100.00
3. 401 amp to and including 800 amp service..........................................................
$200.00
4. 801 amp service and above..............................................................................
$300.00
D
Fees for circuits/feeders & Transformers
Per circuit
1. 0 to 200 amp.................................................................................................
$10.00
2. Above 200 amp.............................................................................................
$15.00
3. Transformers up to 10 KVA..............................................................................
$20.00
4. Transformers over 10 KVA...............................................................................
$30.00
E
Multi -Family Dwellings
Per unit
1. Each dwelling unit
$50.00
F
Alarm, Communication, Signaling Circuits, or less than 50 volts
Each
1. Each system device or apparatus
$0.50
G
For inspections not covered on this form or for required special inspections (hourly)
$60.00
H
Commercial plan review fee if required) is 25% of Total Permit Fee
I
Work started or finished without permit is 2 times the required permit fee
3
State Surcharge Fees
State Surcharge: Schedule is based on the currently adopted State Surcharge Table - per MN Statute
326B.148
State Surcharge is applicable on all permits unless otherwise noted.
Other Inspections and Fees
1.
Re -inspection Fee - A re -inspection fee may be assessed for each inspection or re -
inspection when such portion of work for which inspection is called is not complete or
when corrections called for are not made. On valuation -based building permits, this fee
is not to be interpreted as requiring re -inspection fees the first time a job is rejected for
failure to comply with the requirements of the code, but as controlling the practice of
calling for inspections before the job is ready for such inspection or re -inspection. Re -
inspection fees shall also be assessed when: 1) the address of the jobsite is not posted,
2) the inspection record card is not posted or provided at the worksite, 3) the approved
plans are not readily available for the inspector, 4) full access to the site is not provided
for the inspector, 5) the inspector is not met by the responsible individual (no show), 6)
on residential (IRC) maintenance permits where corrections are required to be
inspected, and 7) deviations from the approved plans occur without prior building official
approval. Re -inspection fees are due on or before the re -inspection. Payment shall be
made payable to the Municipality:
$60 each
2.
Inspections outside of normal business hours (will include travel time both ways - 2 hour
$75/hr.
minimum):
3.
Inspections for which no fee is indicated, Miscellaneous and Special Services (1/2 hour
minimum):
$75/hr.
4.
Additional Plan Review required by changes, additions, or revisions to approved plans
$75/hr.
'/2 hour minimum):
5.
Special Investigation fee (work started without obtaining a permit) - applies whether
100% of
permit is issued or not:
permit fee
6.
1 Copy charge black/white 8'/2 x 11 - per side:
$.25/sheet
7.
Copy char e black/white 11 x 17 and 8'/z x 14) - per side:
$.50/sheet
8.
Copy charge color 8'/2 x 11 - per side:
$1.00/sheet
9.
Copy charge color 11 x 17 and 8'/2 x 14 - per side:
$2.00/sheet
10.
Print or Copy charge (large plan sheet color or black/white
$4.00
11.
Replacement permit card fee - short card 8 '/2 x 7):
$25.00
12.
Re lacement permit card fee - long card 8'/ x 14):
$40.00
13.
License Look -Up contractor license verification):
$5.00
14.
Lead Certification for eligible construction contractor Lead Certification Verification):
$5.00
15.
Permit Renewal within 6 mos. of expiration (no plan changes, no code changes, new
50% of
permit number):
original
permit fee
16.
Change of Use of occupancy classification:
$100.00
17.
Pre -Final inspection new home or structure - 2 hour minimum:
$75/hr.
18.
Temporary Certificate of Occupancy - Escrow less costs to administer)**
$1,000.00
19.
Refunds:
Plan review if plan review has not started
100%
Plan review if plan review has started -partial)
50%
Plan review if plan review has been completed)
0%
Permit fee if work has not started within 6 months of permit issuance by municipality
75%
Maintenance Permits
0%
LI
Permit Valuation is based on supplied construction value with a minimum of the calculated value from the
approved building department valuation schedule.
"This would be a City imposed fee.
Adopted by the City Council of Spring Park on the 4ch day of October, 2021
City of Sprin Park
By: ,
Jerome P. Rockvam, Mayor
A'tes
By:
a ie Hoffman, City I
5
J 6 ,
AFFIDAVIT OF PUBLICATION
CITY OF SPRING
PARK SPRING PARK,
STATE OF MINNESOTA )
MINNESOTA
ss
COUNTY OF CARVER
SUMMARY PUBLICATION
ORDINANCE NO.21-01
AN ORDINANCE
Karen Nelson being duly sworn on an oath,
AMENDING AND
states or affirms that he/she is the Publisher's
RESTATING
APPENDIX A OF THE CITY
Designated Agent of the newspaper(s)known
g g
CODE —SCHEDULE OF
as:
FEES AND CHARGES
Laker Pioneer
This summary of the ordinance
is published pursuant to Minnesota
with the known office of issue being located
Statue 331A.01, Subd. 10.
in the county of:
On October 4,2021 the Spring
CARVER
Park City Council adopted Ordi-
with additional circulation in the counties of:
nance No. 21-01 amending and
restating Appendix A of the Spring
HENNEPIN
Park City Code regarding schedule
and has full knowledge of the facts stated
of fees and charges.
below:
(A) The newspaper has complied with all of
This ordinance makes the fol-
lowing fee changes to 'the City
the requirements constituting qualifica-
Code: excavation permit base fee
tion as a qualified newspaper as provided
$100.00, excavation permit escrow
by Minn. Stat. §331A.02.
fee $5,000.00, excavation obstruc-
This Public Notice was printed and pub-
( ) P p
tionB ordi-
This fees
npermit fee he f$10ollo0.wing
Hance adjusts the following fees for
lished in said newspaper(s) once each
variance requests, interim use per -
week, for 1 successive week(s); the first
mits, and conditional use permits
insertion being on 11/27/2021 and the last
to $500.00 base fee plus $1,500.00
insertion beingon 11/27/2021.
escrow fee & interim use permit
inspection fee (short-term rental)
$150.00.
MORTGAGE FORECLOSURE NOTICES
Pursuant to Minnesota Stat. §580.033
Copies of the ordinance are
available for public inspection in
relating to the publication of mortgage
the City Clerk's office during normal
foreclosure notices: The newspaper complies
business hours or upon request by
with the conditions described in §580,033,
calling Spring Park City Hall at 952-
subd. 1, clause (1) or (2). If the newspaper's
471-9051.
known office of issue is located in a county
ADOPTED by the City Council of
adjoining the county where the mortgaged
the City of Spring Park this 4th day
premises or some part of the mortgaged
of October, 2021.
premises described in the notice are located,
Jamie Hoffman, City Clerk
a substantial portion of the newspaper's
Published in the
circulation is in the latter county.
Laker Pioneer
November 27, 2021
�[
By: T \OL�t�_ � ��
118
Designated Agent
Subscribed and sworn to or affirmed before
me on 11/27/2021 by Karen Nelson.
Notary Public
DARLENE MARIE MACCPHSW N
NOTARY PUBLIC.MINNESOTA
My Cow FOtp n Jan 31. 2024
Rate Information:
(1) Lowest classified rate paid by commercial users
for comparable space:
$15.00 per column inch
Ad ID 1184714