Loading...
Permits - Permit# SP-2021-00067 - 4368 West Arm Road - 12/13/2021City of Spring Park Permit U rY OF `SE Rri\1VONA__rZt h44kK1J0iA To Schedule an Inspection Call: 952-442-7520 Details Permit Number: SP-2021-00067 Issue Date: 12/13/2021 Zoning Type: RESIDENTIAL Use Type: 24 HOUR NOTICE REQUIRED FOR ALL INSPECTIONS ♦ MON-FRI: 8AM-4:30PM ♦ NO HOLIDAYS Site Address: 4368 WEST ARM ROAD, SP, MN 55384 Description: Replace Siding and Roof; 2 Windows, 1 Door Permit Granted To: Homeowner's Name: ANDREW MORGAN WARD Phone Number: Parcel #: 1811723430058 Fees 14514 Notes Permit Type: BLDG - Misc Repair Permit Exp: 12/28/2021 Valuation: $23,000.00 —Permit Fee 7/1/2021 1.00 12/13/2021 Paid Check: 4240 $118.81 Total: $118.81 • This permit is issued in accordance with and subject to all provisions of Ordinances and policies governing building and zoning in City of Spring Park. • Permit Holder/Contractor/Owners Agent is responsible to call for the inspections! • Permit Packet, including approved plan, and this inspection record must be posted in an accessible location before calling for inspection. Maintain this inspection record until work is complete. • No deviations from the approved plans are allowed without prior consent from the building inspections department. • To Owner, Occupant, or Contractor: It is ILLEGAL TO OCCUPY this area/building until all required final inspections have been made, approved, signed, and certificate of occupancy issued! Scott Qualle, Building Official City of Spring Park +4349 Warren Avenue ♦ 55384 Copyright ©2021 INSPECTION RECORD 2020 MN State Building Code City of Spring Park Permit Number: SP-2021-00067 Issue Date: 12/13/2021 SITE ADDRESS: 4368 WEST ARM ROAD, SP, MN 55384 Description: PERMIT TYPE: BLDG - Misc Repair Replace Siding and Roof, 2 Windows, l Door ZONE/USE TYPE: RESIDENTIAL APPLICANT: ANDREW MORGAN WARD OWNER: ANDREW MORGAN WARD No inspection will be performed, and a re -inspection fee will be charged, if this "Inspection Record", the "City of Spring Park Permit", and, when applicable, the approved plans are not available to the inspector. This permit expires if construction activity does not commence within 180 days from obtaining this permit; when construction activity has been suspended or abandoned for at least 180 days; or the work has not been inspected within 180 days from the last documented activity. IF SEPARATE PERMITS ARE REQUIRED, REFER TO THE "SEPARATE PERMITS REQUIRED FOR:" STAMP ON YOUR APPROVED PLANS/CONSTRUCTION DOCUMENTS TO IDENTIFY WHAT SEPARATE PERMITS ARE REQUIRED. ALL REQUIRED ROUGH -IN INSPECTIONS, NOTED ON SEPARATE PERMITS, MUST BE COMPLETED PRIOR TO SCHEDULING A FRAMING INSPECTION. ALL REQUIRED FINAL INSPECTIONS, NOTED ON SEPARATE PERMITS, MUST BE COMPLETED PRIOR TO SCHEDULING A BUILDING FINAL INSPECTION. DO NOT COVER ITEMS TO BE INSPECTED. Permit Card (_5) Status Inspection Meeting/SiteVisit 11/23: Appears siding has been patched and painted. Trailer with old siding on -site with paint cans. (TR) Re -Window In- Required 2 Windows, 1 Door Progress Re -Side In -Process Required Re -Roof In -Process Required Final Required MUST CALL TO SCHEDULE NO LATER THAN THE BUSINESS DAY PRIOR TO THE INSPECTION DAY: 8:00 A.M. TO 4:30 P.M. MONDAY THRU FRIDAY. PHONE NUMBER TO CALL: 952-442-7520 When a Certificate of Occupancy is needed, return this card and the approved final inspection notice to the City of Spring Park office. CITY OF SPRING PARK PAGE 1 BUILDING PERMIT 4349 Warren Avenue SP-2021-00067 Spring Park, MN 55384 ❑ Handout Ginn Phone: 952-//47��1-9051 F!!X:/�962-477 -9160 ❑ Lead standout c�tvsn Routed tD MNSPECT SM ADDRESS. L8 G � ICJ. m PID: 1) Was the home constructed before 1978? (YES ❑. continue with line 2, NO2pcontnue without completing EPA Section) 2) Wei the work dlaturb 26 aq ft of Interior painted surfaces or M sq ft of extenor painted surfaces? (YES o go to line 4, NO o Ina 3) _ 3) Are there any windriws being replaced (YES a, go to line 4. NO ❑ continue without completing EPA Section) 4) Has this hone been Certified Lead Free? (YES o, you MUST Attach Certific:altion information, NO to complete line 5) d) EPA Contractor Certifloabon Number HAT - (applros to contractor only) PROPERTY OWNER: ddmss .,t State- ZI martin t EQLi ua.- . ".,- _Email. Contact Name Pryer OIL -L-111) CONTRACTOR:Address: State: Zl : P e: F Contactor Ucarm No: Contact Name: _Pfttsne",. Email: ARCHITECT: A ss: State: Zlix Phone: Fax: • Emall: Contact Na Phone: TYPE OF WORK: o New Construction ❑ Deck a Pool --- PRO -Roof Commercial ❑ Residential o Change of Use o Retait 9 W+ F4,:,> o Porch wRe-Side EST. VALUATION OF WORK o Finish Basement �l e�rrglihCir# % in Fence a Remodel o Fiii Sprinkler o Shad t Square feet ❑ Addition o f 9iiAlarm `):% SWlndow/Door Replacement o Garage-AttachedgeitaiiIh .Plumbingowtdad.dYon Pop 2 # being replaced Datalled Description of %ilk: o A. re o Mechanic at-prorde d9d on Page 2 o Misc Other Su—J Windows, 1 Door ttbrraara d mlr sWiNtM by er NOW prop" O M ora.laoarwad cadndcr. a tlslnrwrer9 wpnawwv., Is MAW aM r. nhatsss the ZaNg A606b eter or dwlprse and airs thing a desliprse to solar t1M PiapaW b parllaro needed HI�acllora. ttrlby rosy tMMlArwut prior nofke. I hereby selurowldps VW I haw read ft epptteeen and stria the ant irronlntltrl Isbus Mid matt b the bad d e9' krgWla�a I trdhar epee tlld al waerpadbrrod Yr: a n aceadana rder epprwd pYrr, epseMkattars and tordhbrr end to atilt try al oreirnen dthe tiralalp.ay asd the laws sf ew 81ala d Mkreeore upariylp ac4we tarwe ptwar M to ifus paMIL Isom to pay se plan redwifaw ever R iabseso net to pro0ad walh due w aL peme swir" wlrwr we, a not cwmem wdrrin 1e0 drys Troia dab of perwK w t"* 4 ataperdack d wnddrsd, er rot ► "clal for 1e0 days. Waltbeyond fire aoopa alto pu l a wok VAItn t s Perrot a �, fa be a"ad b a perMft. Naha Ordinaeoetn Effeat; tttfONDAY - FRIDAY Before 7 a.m. wed after 10 p.m. WsetendwiHondays before 7 a.m. and after a pat, sxmiruRE OF ApkicAmDATE: Pitl?tTEQ, Thts Is the signature of: fi Owner or o Owner's Re OCCUP. IY#aE: CONST. TYPE: CODE: BLDG SPRINKLED Yes / No VALUATION: $ 23,000.00 Permit Fee: $ 118.81 WAC Charge: $ Plan Review Fee: S Sewer & Water Hook -Up: $ State Surcharge: $ Sewer dr Water Disconnect $ Site Inspection Fee: $ Water Meter $ S.E.C. Fee: $ Muni SE1WA Fee: $ Investigation Fee 1 Other Fee: $ *2016 SAC Escrow: 0 dR�, Copy Charge ($.25 per 8.5 x1 f page) $ Other. S o Llaonse chock (%15)1 toad Chock W) $ TOTAL DUE: S I W SUB TOTAL $ 118.81 Plumbs Fee from Page 2 $ 'NM,, Commensal plena will be submlited to the Met Coumdl Ewirennwrrfal !Ares 7 rig ( 9 ) for SAC delonninatkwL Escrow psymerd will be required when permit Is Issued. B � Mechanical Fee from Page 2 $ after Met Council rvAww no SAC le detarmined sem w wW be refunded in fwL u. Special Conditions/Required Setbacks: U. O Building Approval By: Ty Turnquist (LT) DATE: 07/01/2021 Printed Building Approval By: o License Verification ❑ Lead Verification - Checked By. City Approval By DATE: /07 Paid: I g, $� Date: a Receipt No. �' (� By / CITY OF SPRING PARK PAGE 1 BUILDING PERMIT 4349 Warren Avenue SP-2021-00067 Spring Park, MN 55384 ❑ Handout Gwen Ph e. 952471-9051 Fax! 952-471-9160 Routed to MNSPECT ❑ Lead Handout Given :3ITE ADDRESS: on PID: 'I) Was the home co tructed before 1978? (YES ❑: continue with line 2, NO�oontinue without Completing EPA Section) 2) Will the work disturb aq ft of interior painted surfaces or 220 sq ft of extenor painted aurFaCes? (YES ❑ go to Itne 4, NO ❑fine 3) 0) Are there any windows ing replaced? (YES r;. go to line 4. NO ❑ continue without completing EPA Section) 4) Has this home been Ce ed Lead Free? (YES ❑, you MUST Attach Certification Information, NO o co ate line 5) ti) EPA Contractor Cefificat Number NAT - (applies contractor only) • IMPERTYOViMER: Address' t ..c State,M Zip. Email_ o.rrA . row zv.- tot!%.•• Contact Name Phone: Co tXINTRACTOR: Address: r State: Zi X Phone: Fax -- Contractor License No: Contact Name/ r-mail: ARCHITECT: Address State: 71 : Phon . Fax: Email: Co ct Name: Phone: TYPE OF WORK: ❑ New Construction ck .. r) Pool - - _. -' RRe-Roof 1�Commercial ❑ Residential ❑ Change of Use Retair [Ig Wad;,: ,� Porch rt.R"Ide EST. VALUATION OF WORK o Finish Basement1 ❑Hance a Remodel o Ft Sprink* ❑ Shed 1 _.-\ Square feel fit x�ri.1AJ ❑ Addition n � [arm 's % *Wtndow/Door Replacement a Garage -Attach. imh > 0 Plumbs ravide dotal on Page 2 # being replaced Detailed Description of Work: ❑ Aoce re '• ❑ Mechani I-prwnde detal on Page 2 ❑ Misc Mier Ila 14� 4,3: < 2 I doves, 1 O 6 ■ .,.._... ftnftn of this apnikstlon by the logd propertyotMrer artJeeraed as ths.� Oner's rspnserdrltw. Is ragrryad s the Zx*v Administrator or cisslg m and the BUMN OMcM or dn*m to attar upon the property to Worm needed Inapitllorr may baw i@wut prior notice. t hereby aoltnorr[.dge I here raed this appticatim and state that al information is tors and wrod to the bast of my krmviedlie. I Ndhar egrsa lira! .work will be n accordance with approved pier!, speetlk and conditions and to abide by al ordinances oftha Municipally ' and the taint of the State or Mkarsota rsgarlfrp ao+iors tsim .. to this permit 1 ogrew to pay ail psan raviawfsss even otweas nat 10 proceed wlnr tiro work. Penek a)p3rss When wed, e notcanmencad w4ltrrr 180 day, from deb ofpesart ar Rwad y pen4erl abandoned. tr not I specbd for 180 days. Wane trw reaps ofthla permit or watt wltlrart ■ perroe tr Inepacam, sabesubjDatospenabr- _ . Noise Ordinar,5111n Etieci-, NDAY - DAY Before 7 a.m. and army 10 p.m. Weeks lidayrs before 7 a.m. and after 8 p.m. SIGNATURE OF AP . I DATE: Zi r'tA9r'.'Te ice: + This is the signature cot: er or L, Owner!s Re ntahve OCCUR TYPE: CONST PE CODE: BLDG SP KLED Yes / No VALUATION:$23,000.00 Pe it Fee: $ 475.25 WAC Charge: Pion Re law Fee: $ Sewer &Water Hook Up: $ State urcharge: $ 11.50 SewerB Water Disconnect $ Site In itFee: $ Water Meter_ $ S.E.C. Fee: $ Muni SE/WA Fee: $ Investigation se / Other Fee: $ *2016 SAC Escrow. , 48� Copy Charge ($2 r 8.5 x11 page) 3 Other. $ O Lloonso Chock / Load Chock ($5) 5 TOTAL DUE: $ W SUB -TOTAL ; 486.75 T W Plu in Fee from e 2 $ 9 ( 9 ) 'NOTE; Commercial plans will be submitted to the Met Council Emrir mental Eves 7 Lu Mechanical Fee from Page 2 $ for SAC detemrinadon. Escrow payment will be required when permit Issued. 111 after Met Council review n* SAC Is determined, escrow will be refundei! n ftdl. U. Special Conditions/Required Setbacks: U. 0 Building Approval By: Ty Turnquist (LT) DATE: 07/01/2021 Printed Building Approval By: D License Verification ❑ Lead Verification - Checked By: City Approval By: DATE: Paid: Date: Receipt No. By: Thank you for your Payment! Transaction ID: 14514 Transaction Number. Transaction Type: Payment Recipient: Property Owner Notes: Ci rY OF S�_ [ �1\IC'"��_RK U I City of Spring Park 4349 Warren Avenue SP MN, 55384 Ph: 952-442-7520 $118.81 Date: 12/13/2021 Method: Check: 4240 Address: 4368 WEST ARM ROAD, SP, MN 55384 Reference: Permit Number. SP-2021-00067 Type: BLDG - Misc Repair for ANDREW MORGAN WARD Product: Status: Quantity: Price: Total Amount: —Permit Fee Paid 1.00 $118.81 $118.81 Total Amount: $118.81 Page 1 of 1 Printed on: 12/13/2021 City Clerk From: Tracy Montgomery <tmontgomery@mnspect.com> Sent: Wednesday, December 1, 2021 2:49 PM To: City Clerk Subject: RE: Building Permits for 4364 & 4368 West Arm Road Attachments: SP-2021-00067_APP_Revised.pdf; SP-2021-00068_APP_Revised.pdf I have CityForce and Lisa updated the applications. Hopefully, these will be off of our list of things to do soon@ T�acU Mowtc+owt.er� Office Manager MNSPECT, LLC., A SAFEbuilt Company Helping You Comply with the Code 235 First Street West Waconia, MN 55387 Direct 952-800-8703 Office 952-442-7520 tracvna mnsoect.com www.mnspect.com From: City Clerk <cityclerk@ci.spring-park.mn.us> Sent: Wednesday, December 1, 2021 11:07 AM To: Tracy Montgomery <tmontgomery@mnspect.com> Cc: Scott Qualle <squalle@mnspect.com> Subject: RE: Building Permits for 4364 & 4368 West Arm Road Importance: High Thanks Tracy. That sounds fine and agree. Can you update the fees in Citi Force and send over a revised copy of the permits showing the updated fees? I will then send over to Andrew and his mother and ask that they get paid so we can get these closed out. No, Al didn't request to be copied. We are not quite sure what the appropriate communication path is with the changes so we went ahead and copied him. Many thanks!! SPRING PARK tM "*r :Nrnpanorr r Jamie Hoffman City Clerk City of Spring Park 4349 Warren Ave Spring Park, MN 55384 952.471.9051 cityclerk@ci.spring-park.mn.us www.ci.sprin-park.mn.us City Hall Hours are Monday - Friday 8:00 a.m. - 4:30 p.m. From: Tracy Montgomery <tmontgomery@mnspect.com> Sent: Wednesday, December 1, 2021 10:51 AM To: City Clerk <cityclerk@ci.spring-park.mn.us> Cc: Scott Qualle <squalle@mnspect.com> Subject: FW: Building Permits for 4364 & 4368 West Arm Road Hi Jennifer I apologize for the delay in getting back to you on this. Andrew spoke with Scott. We sent Tracy Reimann to the properties and he confirmed painting and that it doesn't appear that the roofs were reroofed. Per Scott, he suggests that the permit fee be reduced to 25% of the original permit fees (permits SP-2021-00067 and-00068) and no state surcharge. This is following the refund schedule of Permit Fee (if work has not been started) within 6 months of permit issuance by municipality. While the initial fees have not been paid, the administrative work has been completed. I will get Al's email address for you. Did he request to be included on all email correspondence? I am still trying to figure out everyone's roles with this transition to SAFEbuilt0 Thanks, Tack MovLtgovmri Office Manager MNSPECT, LLC., A SAFEbuilt Company Helping You Comply with the Code 235 First Street West Waconia, MN 55387 Direct 952-800-8703 Office 952-442-7520 tracyC�mnspect.com www.mnspect.com From: City Clerk <cityclerk@ci.spring-park.mn.us> Sent: Wednesday, December 1, 20217:50 AM To: Tonia Sikorski <tsikorski@mnspect.com>; Wendy Morrissey <wmorrissev@mnspect.com>; Lisa Thole <Ithole@mnspect.com> Cc: Amber Green <agreen@safebuilt.com> Subject: FW: Building Permits for 4364 & 4368 West Arm Road Importance: High Hi there; These permits remain unpaid. I talked to Andrew and he said they didn't do all of this work, they simply made repairs. I am not sure what the next step is. I think we were going to possibly send out an inspector to take a look at the property to see if this is actually the case. Can you please advise on next steps? Many thanks! 4k=� SPRING PARK On L* xrffnclm>> Jamie Hoffman City Clerk City of Spring Park 4349 Warren Ave Spring Park, MN 55384 952.471.9051 cityclerk@ci.spring-park.mn.us www.ci.spring-park.mn.us City Hall Hours are Monday - Friday 8:00 a.m. - 4:30 p.m. From: Barb Ward <bkward55@gmail.com> Sent: Thursday, November 11, 2021 10:17 PM To: City Clerk <cityclerk@ci.spring-park.mn.us> Cc: Andrew Ward <ward.andrew@live.com> Subject: Re: Building Permits for 4364 & 4368 West Arm Road Importance: High Hi Jamie, I went on line to the link you provided but was unable to find the building permits or the bills. All I saw were the water bills, which were all paid up. The letter that was sent to me says that the building permit was never picked up. Would you please mail both of them to me? Thank you, Barb Ward On Nov 9, 2021, at 1:52 PM, City Clerk <cityclerk@ci.spring-park.mn.us> wrote: Hello Barbara! Were you able to go online to pay for these permits yet? Let me know. You can drop off a check at the city offices as well. Thanks! <image001 Jpg> Jamie Hoffman City Clerk City of Spring Park 4349 Warren Ave 3 Spring Park, MN 55384 952.471.9051 citvclerk@ci.spring-park.mn.us www.ci.spring-park.mn.us City Hall Hours are Monday - Friday 8:00 a.m. - 4:30 p.m. From: City Clerk Sent: Thursday, November 4, 2021 12:42 PM To: bkwardSS@gmail.com Cc: andrew ward <ward.andrew@live.com> Subject: Building Permits for 4364 & 4368 West Arm Road Hi Barbara; The building permits to replace the roof and siding a the above address(s) are ready for payment. You can pay for them online using the link shown below. www.paymentservicenetwork.com. The cost of the permit for 4364 West Arm Drive is $377.25 and the cost for the permit for 4368 West Arm Road is $486.75. Once we receive payment, you can pick up the permits at the address below or I can email them to you. Let me know what you prefer! Thanks! <image001 Jpg> Jamie Hoffman City Clerk City of Spring Park 4349 Warren Ave Spring Park, MN 55384 952.471.9051 citvclerk@ci.spring-park.mn.us www.ci.spring-park.mn.us City Hall Hours are Monday - Friday 8:00 a.m. - 4:30 p.m. M N S P E C T,_,_c FAX:9S2-442-7521520 11 ' ojr EMAIL: INFO@MNSPECT.COM RESIDENTIAL DOOR & WINDOW REPLACEMENT ➢ This handout is intended only as a guide. It shall not be considered a complete set of requirements. ➢ Materials and installation must comply with the current Minnesota State Building Code and the manufacturers' installation specifications for each product. ➢ Residential window and door replacement permits are issued over-the-counter at the municipality office. Permits are not required to replace broken glass in an existing window sash. ➢ This handout is VALID for single-family homes, duplexes, and townhomes. (Does NOT include condominiums, apartment complexes, and commercial properties.) ➢ NOT VALID for repairs, replacement, removal, or installation of any structural members. ➢ Each address requires a separate permit. ➢ Contractor must be EPA Certified if the home was constructed before 1978. ➢ Replacement windows/doors must be the same size. In sleeping rooms, the unobstructed open area of the window, when fully open, may NOT be reduced. ➢ If window size is being changed or if framing is being added or removed, a separate building permit is required. When replacing a window opening with a bay window, a building permit is required. PERMIT 'D (throughout• • be: POSTED prior to start of work - VISIBLE from street or driveway - ACCESSIBLE to the inspector. INSPECTION REQUIREMENTS: Inspections MUST be scheduled during office hours AT LEAST one business day prior to inspection. If a specific date and time is required, additional notice may be needed. Failure to cancel a scheduled inspection may result in a reinspection fee. o Office Hours: Monday - Friday • 800 a.m. - 4:30 p.m. o Phone: (952) 442-7520 or (888) 446-1801 Inspections: o Someone 18 years or older must be present at the time of the inspection. o See Project Checklist in this handout for additional requirements. o This work requires smoke alarms and carbon monoxide detectors to be properly installed. o Final: BEFORE the installation of any interior trim. For window inserts, an inspection is required after the work is complete. Take photographs of original sleeping room windows, and identify each window's original location. NOTICE: Construction or work for which a permit is required shall be subject to inspection by the Building Official, and such construction or work shall remain accessible and exposed for inspection purposes until approved. It is the responsibility of the permit applicant to be in attendance on site and provide access to the Building Official for all required inspections. If work is concealed and/or work is not complete at time of inspection, an additional inspection is required and a reinspection fee may apply. Note: The State of Minnesota requires all residential building contractors, remodelers, roofers, plumbers, and electricians to obtain a state license, unless they qualify for a specific exemption. Any person claiming an exemption must provide a copy of a Certificate of Exemption from the Department of Labor & Industry to the Municipality before a permit will be issued. Note: To determine contractor requirements, or to check the licensing status of a contractor, please call the Minnesota Department of Labor & Industry at 651-284-5065 or toll free 1-800-342-5354. Note: For specific code requirements, contact the Building Inspection Department at 952-442-7520 or 888-446-1801 or e-mail: info(a)mnspect.com. The following is a guideline to assist in compliance with the requirements of the MN State Building Code. ❑ The home address must be visible from the street. Residential window/Door Replacement Handout Page 1 of 2 Copyright © MNSPECT 2020, Rev April 2020 ❑ If replacing a window in a sleeping room, refer to our Emergency Escape & Rescue Openings handout. ❑ Smoke and carbon monoxide detectors are required. Refer to our Requirements for Smoke and Carbon Monoxide Detectors handout (half -sheet) for code requirements. ❑ Flashing shall be installed at the head and sides of exterior window and door openings and shall extend to the surface of the exterior wall finish or to the water -resistive barrier for subsequent drainage. • ASTM certification sheet is required if no drip cap flashing is installed (ASTM E331). • Fenestration installation instructions must be provided for each window/door. ❑ Energy efficiency requirements: • U-Factor for windows must not be greater than 0.32. • U-Factor for skylights must not be greater than 0.55. • Windows must have U-Factor sticker in place at the time of inspection. REQUIRED SAFETY GLAZING LOCATIONS R308.4 Location Exceptions .1 Glazing in fixed or operable panels of 1. Openings that would prevent passage of a 3 in. sphere swinging, sliding, or bi-fold doors 2. Decorative glass .2 Glazing where any part of glass is 1. Decorative glass within 24 in. arc of the operable door in 2. When protected by intervening wall or barrier closed position & <60 in. above floor or 3. Glass perpendicular to door on latch side standing surface 4. When door only serves closet <_3 ft. deep (reach -in closet) 5. Glass adjacent to fixed side of patio doors .3 Walk-through hazard >9 sq. ft. & lowest 1. Decorative glass edge <18 in. from walking surface & upper edge >36 in. above walking surface & <_3 ft. horizontal from walking 2. When protected by min 1'/2 in. high horizontal rail, 34-38 in. above walking surface. Rail must resist 50 lb. force per linear foot w/o contacting glass surface 3. Outboard panes >_25 ft. above grade, roof, or other surface .4 Guards, railings, and guard infill none ` components .5 Walls, enclosures, or fences containing 1. Glazing > 60 in., measured horizontally, in a straight line, or facing hot tubs, spas, whirlpools, from the water's edge of a bathtub, hot tub, spa, saunas, steam rooms, bath tubs, whirlpool, or swimming pool showers, swimming pools where the bottom exposed edge of the glazing is <60" measured vertically above any standing or walking surface .6 Glass adjacent to stairways, landings & 1. When protected by min 1'/2 in. high horizontal rail 34-38 ramps within 36 in. horizontally of in. above walking surface w/rail above to resist 50 lb. walking surface & <60 in. above force w/o contacting lass 2. When >18 in. horizontally from a railing meeting req's of walking surface an open -stair guard 3. When solid vertical surfaces installed 34-36 in. above walking surface & top of solid surface resists same loads as a guard .7 Glass within 60 in. horizontally of Same as exceptions 2 & 3 to item .6 above. bottom tread of stair in any direction when glass <60 in. above nose of tread Residential Window/Door Replacement Handout Page 2 of 2 Copyright © MNSPECT 2020, Rev April 2020 INSPECTION PROCEDURES FOR REROOF PROJECTS APPLIES FOR THE INSTALLATION OF ASPHALT SHINGLES ONLY The building code requires an inspection to close all permits. The appropriate time to verify compliance and discuss the project is while the work is "in progress." As a result, we require the contractor to call us at (952) 442-7520 at least one day prior to starting the work to schedule a half -way inspection (while the work is underway). If, and only if, we are unable to provide an inspector while the project is underway, we will authorize you to take photos and provide them at the final inspection, which will require you to provide the photos at the job site. If the inspector who visits the worksite determines that the supplied pictures are not conclusive, you will be required to meet our inspector on -site and to provide access to the roof. Should this be required, a reinspection fee will apply. At the time of the inspection, you must provide the following photos: ✓ Photos shall identify the roof is of the house being worked on. (i.e. photos may include the yard, driveway, house siding, etc.). ✓ Decking with nothing on it — all sides/planes of the roof. ✓ Ice/Water Guard — photos taken BEFORE underlayment is added to roof ✓ Underlayment - photos taken after installed • All sides/planes of house • Underlayment shall extend to roof edges ✓ Flashing —all required flashing: • step flashing, • dormer flashing, • All other required flashing Benefits of an In -Progress inspection: • If there is an issue with the work "under" the shingles, it can hopefully get caught prior to covering — saving time and money. • Pictures are often inconclusive. • Communication challenges — the owner has to contact the contractor to notify them of required corrections. • Some contractors leave the area when the storm damage repairs are done, making it difficult for the contractor to come back and make the required corrections. • The inspector and the contractor can discuss issues and concerns to ensure that work being done is compliant. The Inspector's job is to verify a code compliant installation. In -progress inspections are the best way to do this! �M~ PHONE: 952-442-7520 M N S P E C T-Lc FAX: 952-442-7521 HELPING YOU Coll.LY WITH 4 EMAIL: INFO@MNSPECT.COM RESIDENTIAL ROOFING REPLACEMENT ➢ This handout is intended only as a guide. It shall not be considered a complete set of requirements. ➢ Materials and installation must comply with the current Minnesota State Building Code and the manufacturers' installation specifications for each product. ➢ Residential roofing replacement permits are issued over the counter at the municipality office. ➢ This handout is VALID for single-family homes, duplexes, and townhomes. (Does NOT include condominiums, apartment complexes, and commercial properties.) ➢ NOT VALID for repairs, replacement, removal, or installation of any structural members. ➢ Each address requires a separate permit. POSTED prior to start of work - VISIBLE from street or driveway - ACCESSIBLE to the inspector INSPECTION• Inspections MUST be scheduled during office hours AT LEAST one business day prior to inspection. If a specific date and time is required, additional notice may be needed. Failure to cancel a scheduled inspection may result in a reinspection fee. o Office Hours: Monday - Friday • 8:00 a.m. - 4:30 p.m. o Phone: (952) 442-7520 or (888) 446-1801 In -Progress Inspection: An inspection must be performed prior to the completion of the project unless otherwise approved (see Page 3 for details). Ideally, the inspection should take place when the tear -off is done and the underlayment and ice barrier are applied and not yet fully covered by roof covering. (The taking of photographs showing decking, ice barrier, underlayment, and flashing is always a good idea, but is NOT a substitute for the required inspection.) See notes on Page 2 regarding installing roofing materials over one existing layer. ✓ Your representative must be on site, able to communicate with the inspector, and provide access to the roof (ladder). ✓ You must have all installation instructions on site. ✓ Asphalt shingles must meet ASTM D7158 or ASTM D 3161 and comply with Table R905.2.4.1 of the current MRC for class and minimum wind resistance. Verification must be provided at time of inspection. ✓ Failure to comply with inspection and installation requirements may result in: 1) the requirement to remove materials, 2) penalty fees, and/or 3) a license investigation under Minnesota Statute 32613.84. NOTICE: Construction or work for which a permit is required shall be subject to inspection by the Building Official, and such construction or work shall remain accessible and exposed for inspection purposes until approved. It is the responsibility of the permit applicant to be in attendance on site and provide access to the Building Official for all required inspections. If work is concealed and/or work is not complete at time of inspection, an additional inspection is required and a reinspection fee may apply. Note: The State of Minnesota requires all residential building contractors, remodelers, roofers, plumbers, and electricians to obtain a state license, unless they qualify for a specific exemption. Any person claiming an exemption must provide a copy of a Certificate of Exemption from the Department of Labor & Industry to the Municipality before a permit will be issued. Note: To determine contractor requirements, or to check the licensing status of a contractor, please call the Minnesota Department of Labor & Industry at 651-284-5065 or toll free 1-800-342-5354. Note: For specific code requirements, contact the Building Inspection Department at 952-442-7520 or 888-446-1801 or e-mail: info(a)-mnspect.com. Residential Roofing Replacement Handout Page 1 of 3 Copyright© MNSPECT 2020, Rev. April 2021 When new roof covering is to be installed over one layer of existing covering, an initial inspection prior to covering will need to be completed to verify that only one layer is being covered and compliance with R908.3.1 is being met: R908.3.1 Re-covering versus replacement. New roof coverings shall not be installed without first removing all existing layers of roof coverings where any of the following conditions exist: 1. Where the existing roof or roof covering is water -soaked or has deteriorated to the point that the existing roof or roof covering is not adequate as a base for additional roofing. 2. Where the existing roof covering is wood shake, slate, clay, cement or asbestos -cement tile. 3. Where the existing roof has two or more applications of any type of roof covering. A re -inspection and re -inspection fee will be required if the original roofing is determined to be inadequate. PROJECT The following is a guideline to assist in compliance with the requirements of the MN State Building Code. ❑ The home address must be visible from the street. ❑ Identify the roof pitch(es) to determine which approved roof covering(s) can be installed. Roof Covering Pitch Requirements Roof Covering Pitch Requirements Asphalt Shingles 2" rise per 12" run or greater Metal Roof Panels '/2" rise per 12" run or greater (-k**) (lapped, with sealant) Clay/Concrete Tile 2'/2' rise per 12" run or greater Metal Roof Panels W rise per 12" run or greater (*) (standing seam) Wood 3" rise per 12" run or greater Modified Bitumen Roofing W rise per 12" run or greater Shingles/Shakes (-k*) Metal Shingles 3" rise per 12" run or greater Thermoset Single; ply Roofing W rise per 12" run or greater (-k*) Metal Roof Panels 3" rise per 12" run or greater Thermoplastic Single -ply W rise per 12" run or greater (lapped, no sealant) Roofing Slate Shingles 4" rise per 12" run or greater Liquid -applied Coatings '/V rise per 12" run or greater Mineral -surfaced Roll 1" rise per 12" run or greater Sprayed Polyurethane Foam '/<" rise per 12" run or greater Roofing " * Roofing ❑ Make sure the roof decking is in good condition and there are no gaps that exceed the manufacturer's installation instructions for the roof covering used. Roof sheathing shall be checked prior to re -roofing and repaired or replaced if rotted or unsound. Replacement sheathing shall conform to the requirements of the Building Code and the manufacturer of the product. ❑ Obtain a Building Permit if any structural members need to repaired, replaced, and/or added. ❑ -k Install the required ice barrier starting at the eaves to a point no less than 24" inside the interior of the exterior wall (measured horizontally). (Exception: detached structures that are not heated.) ❑ Make sure all flashing is constructed of a minimum 26-gauge, corrosion -resistant sheet metal. ❑ Install the front wall, vertical sidewall, soil stack, vent pipe, and/or chimney flashing in accordance with the manufacturer's printed instructions. Apply counter flashing in a shingle -like fashion. ❑ Install valley linings and flashing. ❑ A cricket or saddle is required on all chimneys or penetrations that are more than 30" wide (measured parallel to ridge). See Figure R1003.20 and Table R1003.20 — current MN State Residential Code. ❑ * Install the required underlayment materials, ensuring the underlayment materials extend to the edges of the roof deck. *(For Asphalt Shingles - Roofs with pitches of 2:12 up to, but not including, 4:12 have double underlayment requirements. First, apply a 19" strip along the eave, and then 36" strips lapped a minimum of 19". End laps shall be 4" and offset by 6'. Please call if you need additional information.) ❑ Ensure all roof covering materials are installed in accordance with the manufacturers' installation instructions. ❑ Ensure all venting terminations extend through the roof deck and are properly flashed. ❑ Ensure the minimum attic cross -ventilation is provided. How to calculate the minimum: 1. When soffit/eave venting is provided, 1 sq. ft. minimum of net free ventilation area shall be provided for every 300 sq. ft. of attic area (40%-50% of the net required ventilation opening must be located in the upper portion of the roof, no more than 3' below the ridge). The remaining ventilation must be located in the eave/soffit. 2. When less than 50% of the required ventilation is provided in the eave/soffit, 1 sq. ft. minimum of net free ventilation area shall be provided for every 150 sq. ft. of attic area. ❑ All removed and excess roofing materials must be disposed of at an MPCA-approved landfill. Residential Roofing Replacement Handout Page 2 of 3 Copyright© MNSPECT 2020, Rev. April 2021 INSPECTION PROCEDURES FOR REROOF PROJECTS APPLIES FOR THE INSTALLATION OF ASPHALT SHINGLES ONLY The building code requires an inspection to close all permits. The appropriate time to verify compliance and discuss the project is while the work is "in progress." As a result, we require the contractor to call us at (952) 442-7520 at least one day prior to starting the work to schedule a half -way inspection (while the work is underway). If, and only if, we are unable to provide an inspector while the project is underway, we will authorize you to take photos and provide them at the final inspection, which will require you to provide the photos at the job site. If the inspector who visits the worksite determines that the supplied pictures are not conclusive, you will be required to meet our inspector on -site and to provide access to the roof. Should this be required, a reinspection fee will apply. At the time of the inspection, you must provide the following photos: NOTE: Photos shall identify that the roof is of the house being worked on (i.e. photos should include identifying features such as the yard, driveway, house siding, etc.). ✓ Decking with nothing on it — all sides/planes of the roof ✓ Ice/water guard — photos taken BEFORE underlayment is added to roof ✓ Underlayment — photos taken after installation: • All sides/planes of the roof • Underlayment shall extend to roof edges ✓ Flashing — all required flashing: • step flashing, • dormer flashing, • All other required flashing Benefits of an in -progress inspection: • If there is an issue with the work "under" the shingles, it can hopefully be caught prior to covering — saving time and money. • Pictures are often inconclusive. • The inspector can communicate directly with the contractor while on site, avoiding the possibility that correction requirements will not be passed on to the contractor. • If the contractor has a wide range of service it can be inconvenient to return to the site to make any required corrections. An in -progress inspection allows corrections to be made while the contractor is still on site. • The inspector and the contractor can discuss issues and concerns to ensure that work being done is compliant with the code. The Inspector's job is to verify a code compliant installation. In -progress inspections are the best way to do this! Residential Roofing Replacement Handout Page 3 of 3 Copyright© MNSPECT 2020, Rev. April 2021 Phone: 952-442-7520 M N S P E C T ,c Fax: 952-442-7521 IHELPING YOU COMPLY Wt �t ,:f Email: info@mnspect.com RESIDENTIAL SIDING REPLACEMENT ➢ This handout is intended only as a guide. It shall not be considered a complete set of requirements. ➢ Materials and installation must comply with the current Minnesota State Building Code and the manufacturers' installation specifications for each product. ➢ Residential siding replacement permits are issued over the counter at the municipality office. ➢ This handout is VALID for single-family homes, duplexes, and townhomes. (Does NOT include condominiums, apartment complexes, and commercial properties.) ➢ NOT VALID for repairs, replacement, removal, or installation of any sheathing and/or structural members. ➢ Each address requires a separate permit. ➢ If the home was constructed prior to 1978 and 20 s.f. or more of painted exterior materials will be disturbed, the contractor must be EPA "Lead Safe Certified" or qualify for an exemption. ➢ Brick, stucco, stone, or EIFS siding installation or removal requires a building permit. EIFS also requires special inspections by a third -party testing agency PERMIT CARD (throughout project) - POSTED prior to start of work - VISIBLE from street or driveway - ACCESSIBLE to the inspector Inspections MUST be scheduled during office hours AT LEAST one business day prior to inspection. If a specific date and time is required, additional notice may be needed. Failure to cancel a scheduled inspection may result in a reinspection fee. o Office Hours: Monday - Friday • 8:00 a.m. - 4:30 p.m. o Phone: (952) 442-7520 or (888) 446-1801 In -Progress Inspection: An inspection must be performed prior to the completion of the project unless otherwise approved. Ideally, the inspection should take place after the existing siding is removed, all windows are taped, the house wrap or felt paper installed and new siding started but not fully covering the house wrap. (Taking photographs documenting sheathing, water resistive barrier, sealing of penetrations and openings, and flashing is always a good idea, but is NOT a substitute for the required inspection.) ✓ Your representative must be on site and able to communicate with the inspector. ✓ You must have all installation instructions on site. ✓ Failure to comply with inspection and installation requirements may result in: 1) the requirement to remove materials, 2) penalty fees, and/or 3) a license investigation under Minnesota Statute 32613.84. NOTICE: Construction or work for which a permit is required shall be subject to inspection by the Building Official, and such construction or work shall remain accessible and exposed for inspection purposes until approved. It is the responsibility of the permit applicant to be in attendance on site and provide access to the Building Official for all required inspections. If work is concealed and/or work is not complete at time of inspection, an additional inspection is required and a reinspection fee may apply. Note: The State of Minnesota requires all residential building contractors, remodelers, roofers, plumbers, and electricians to obtain a state license, unless they qualify for a specific exemption. Any person claiming an exemption must provide a copy of a Certificate of Exemption from the Department of Labor & Industry to the Municipality before a permit will be issued. Note: To determine contractor requirements, or to check the licensing status of a contractor, please call the Minnesota Department of Labor & Industry at 651-284-5065 or toll free 1-800-342-5354. Note: For specific code requirements, contact the Building Inspection Department at 952-442-7520 or 888-446-1801 or e-mail: info &mnspect.com. Residential Siding Replacement Handout Page 1 of 6 Copyright @ MNSPECT 2020, Rev. April 2020 PROJECT The following is a guideline to assist in compliance with the requirements of the MN State Building Code. ❑ The home address must be visible from the street. ❑ Make sure the sheathing is in good condition. Any water -saturated or damaged sheathing will need to be replaced. ❑ Obtain a building permit for framing if any sheathing and/or structural members need to be repaired, replaced, and/or added. ❑ Make sure all sheathing materials are approved for such use. ❑ Seal all sheathing penetrations at the sheathing and at the exterior wall covering (i.e. gas lines, wires, vents, etc.). All exterior penetrations in the sheathing and water resistive barrier made by pipes, vents, etc. shall be sealed, and water resistive barrier properly lapped. ❑ Approved corrosion -resistive flashing (not house wrap tape) shall be installed: ✓ At the top and sides of all window and door openings, extended to the face of the WRB. ✓ At the intersection of chimneys or other masonry construction. ✓ Continuously above all projecting wood trim. ✓ Where porches, decks, or stairs attach to a wall or floor assembly. ✓ At wall and roof intersections (kick -out flashing). ✓ At built-in gutters. ❑ Install an approved water resistive barrier (i.e. house wrap, No.15 felt, etc.) starting at the structure's base and working your way up to the underside of the rafters or trusses. When using tar paper the upper layer must lap over the lower layer by at least 2", and the vertical joints must lap at least 6". House wraps shall be installed in accordance with manufacturer's installation instructions. ❑ Ensure the water resistive barrier, regardless of type, overlaps all flashing by a minimum of 2" ❑ Ensure all cuts, tears, penetrations through, and openings in the water resistive barrier are sealed. ❑ Ensure the siding material is of a weather -resistive material. ❑ Install all siding materials in accordance with the manufacturers' instructions and Table R703.3(1). ❑ Nails and staples shall meet ASTM F1667 and all fasteners comply with R703.3.2. ❑ Staples shall have a minimum crown width of 7/16" and a minimum 16ga. size. ❑ Reconnection of electrical fixtures may only be performed by the home owner or a licensed electrician. An electric permit is required for this work. ❑ Re -install the house numbers (if necessary). ❑ All removed and excess siding materials must be disposed of at an MPCA-approved landfill. ❑ When using other materials besides felt paper and house wrap for water resistive barrier (i.e. fan -fold), the manufacturer's installation guide approving use as a water resistive barrier MUST be on site. ❑ When attaching materials over exterior foam sheathing, installation shall comply with R703.15 and Table R703.15.1 ❑ See attached Table R703.3(1) Weather -Resistant Siding Attachment and Minimum Thickness; Table R703.15.1 Cladding Minimum Fastening Requirements for Direct Attachment Over Foam Plastic Sheathing to Support Cladding Weight and Table R703.15.2 Furring Minimum Fastening Requirements for Application Over Foam Plastic Sheathing Residential Siding Replacement Handout Page 2 of 6 Copyright © MNSPECT 2020, Rev. April 2020 As b'the manufadurer P*pnopylane aiditegx NoLAP Seclion 70314.1 Seelnon703.44.1 SeclM 703.14:1 SeCtio t703. U.1 f s, axombletegmport BNNW d or Omer secliom of ars coda Siding rted siding nail Siding am Selling nib (131.` x 423+i ■ (211; x t111� ' Not Samoa $1MIr 28 ga 4.1131) 0.113't 0.113') O.tt3) BBonarid Skid Spacing S*9*-l3t;' Stople-21l2 Stall,,-211. 56sPle-t i 0 120' nail 0120` roil 0.12V nag 1s irxh" on (thank) w4h (shank) With (sh"? with ) 0 l20' +und canes or as vsrA>Win0 a 0.3ir head a 0,31Y head a D MY head tihinklwim Not SPOC46d OA39 LAP ort8sage orl6.gage of16.gap bythe a0-313 head so"" staple With staple we 4laple W411 Sic[iott R703.11.2 tnanutacturer �("*$Ocli,,OR7011111 1h- to nib inch Its -to r7Y }rt- b tip +tehuctioas or clawrr" ; inch crown' etch cram' a teat ireport Wood ru4K 3tn nest. Lop � Fooe MWTNV bax or to y' up8d Bd box or 6d box or Bd box of 6d tx& of woo nail Widths. 1 nail isl ���� stdinp R7D3.5] St**� �ar�a siding nIIti bidetq nail siding nail Siding nail (2+.?� , Per hearing, W (See Section Lopt2. k 0.DW) (T ■ 0.0w) (T x ObW? (2' x ODD) 0.113') widths Bevai �1n4 staple-2. so ow. 2 mils Butt >tA She Lap pin Dearing �Nlnod stnxWral panel , Wood,ANSVAPAPRP-110pa3 2�Ji ■ W p4txd y let- � Nora• 2' K D 089' 0.113' 0.143' ; 0J13' 2' X 0 A99' edgiibn 12' siding (axlerw grade) aiding am ( gang nail biding W airing nail swiing tied inter dap. ("a Section R703.6) 211'i . 21li . 2tF2 Wood sbucturIIl paneY sl: _ r;: Note e 2 4.D90' 0.11 Y O tT 0,113' 2` ■ 0.090 8' ab� lap siding (see section R703 5) Note g siding net++ P*v nad bottom edge "ad � wihD fad� nay a. Aluminum nails shall be used to attach aluminum siding. b. Aluminum (0.019") shall be unbacked only where the maximum panel width is 10" and the maximum flat areas is 8". The tolerance for aluminum siding shall be +0.002" of the nominal dimensions. c. Shall be of approved type d. Where used to resist shear forces, the spacing must be 4" at the panel edges and 8" on interior supports. e. Vertical end joints shall occur at studs and shall be covered with a joint cover or shall be caulked. f. Face nailing: one 6d common nail through the overlapping planks at each stud. Concealed nailing: one 11gague 1 1/2" long galvanized roofing nail through the top edge of each plank at each stud in accordance with the manufacturer's installation instructions. g. Vertical joints, if staggered, shall be permitted to be away from the studs if applied over woods structural panel sheathing. h. Minimum fastener length must be sufficient to penetrate sheathing other nailable substrate and framing a total of minimum 1 1/4" or in accordance with the manufacturer's installation instructions. i. Where specified by the manufacturer's instructions and supported by a test report, fasteners are permited to penetrate into or fully through nailable sheathing or other nailable substrate of minimum thickness specified by the instructions or test report, without penetrating framing. j. Insulated vinyl siding shall comply with ASTM D7793 k. Polypropylene siding shall comply with ASTM D7254 I. Cladding attachment over foam sheathing shall comply with the additional requirement and limitations of sections R703.15, R703.16 and R703.1 Residential Siding Replacement Handout Page 4 of 6 Copyright © MNSPECT 2020, Rev. April 2020 Table R703.15.1 Cladding Minimum Fastening Requirements for Direct Attachment Over Foam Plastic Sheathing to Support Cladding Weight MAXIMUM THICKNESS OF FOAM SHEATHINGc CLADDING CLADDING CLADDING i (inches) FASTENER FASTENER FASTENER(-,6., o.c. Fastener Horizontal 24" o.c. Fastener Horizontal THROUGH TYPE AND VERTICAL 11 Spacing Spacing FOAM MINIMUM SPACING Cladding Weight, Cladding Weight: SHEATHING; SIZEb (inches} 1 3 psf 11 psf 18 psf 25 psf 3 psf 11 psf 18 psf 25 psf --r0113' 6 2.00 1.45 0.75 DR 2,00 0.85 DR DR diameter 8 2.00 1.00 DR DR ZOO 0.55 DR DR nail 12 2.00 0-55 DR DR 1.85 DR OR DR . 0120" 6 3.00 1-70 0.90 0-55 3.00 1,05 0.50 DR Wood diameter 8 3.00 1.20 0.60 DR 3.00 0.70 OR DR framing 1 nail i 12 3.00 0.70 DR DR - 2.15 -T-DR DR --4 I DR (minimum Ile 4-inch . 0A31* 6 4.00 2.15 1.20 0-75 4.00 1.35 0.70 DR penetration) j diameter a 4.00 1-55 0,80 DR 4.00 0,90 OR DR nail 12 4.00 0.90 DR DR 2.70 0.50 OR DR 0.162'---T - 6 ------- T 4.00 3-55 2.05 1-40 4.00 2.25 1.25 i 0.80 diameter 8 4.00 2.55 1,45 0.95 4.00 1,60 0.85 0-50 nail 12 4.00 1 .60 0.85 0.50 4.00 0.95 OR DR For St; I inch 25.4 mm. 1 pound per square foot 0.0479 kPa, I pound per square inch - 6.895 kPa, DR = Design Required, o.c. = On Center. a. Wood framing shall be Spruce -pine -fir or any wood species with a specific gravity of 0.42 or greater in accordance with AWC NDS. b. Nail fasteners shall comply with ASTM Fl %7, except nail length shall be perrnmzed to exceed ASTM F1667 standard lengths. c. Foam sheathing shall have a minimum compressive strength of I S psi in accordance with ASTM C578 or ASTM C1 289. Residential Siding Replacement Handout Page 5 of 6 Copyright (D MNSPECT 2020, Rev. April 2020 Table R703.15.2 Furring Minimum Fastening Requirements for Application Over Foam Plastic Sheathing Furring Material Framing Member Fastener Type and Minimum Size Penetration Into Wall Framing Fastener Spacing in Furring (Inches) 16" O.0 Furring e 24" O.0 Furring e Material Weight Material Weight 3 11 18 25 3 11 18 25 Minimum 1x Wood Furring c Minimum 2X wood Stud 0.131" Diameter Nail 1 1/4 8 4.00 2.45 1.45 0.95 4.00 1.60 0.85 DR 12 4.00 1.60 0.85 DR 4.00 0.95 DR DR 16 4.00 1.10 DR DR 3.05 0.60 DR DR 0.162" Diameter Nail 11/4 8 4.00 4.00 2.45 1.60 4.00 2.75 1.45 0.85 12 4.00 2.75 1.45 0.85 4.00 1.65 0.75 DR 16 4.00 1.90 0.95 DR 4.00 1.05 DR DR No 10 Wood Screw 1 12 4.00 2.30 1.20 0.70 4.00 1.40 0.60 DR 16 4.00 1.65 0.75 DR 4.00 0.90 DR DR 24 4.00 0.90 DR DR 2.85 DR DR DR 1/4" Lag Screw 11/2 12 4.00 2.65 1.50 0.90 4.00 1.65 0.80 DR 16 4.00 1.95 0.95 0.50 4.00 1.10 DR DR 24 4.00 1.10 DR DR 3.25 0.50 DR DR a. Wood framing and furring shall be SPF or any wood species with a specific gravity of 0.42 or greater in accordance with AWC NDS. b. Nail fasteners shall comply with ASTM F1667, except nail length shall be permitted to exceed ASTM F1667 standard lengths c. Where the required cladding fastener penetration into wood material exceeds 3/4" and is not more than 1 1/2", a minimum 2x wood furring or an approved design shall be used. d. Foam sheathing shall have a minimum compressive strength of 15psi in accordance with ASTM C578 or ASTM C1289 e. Furring shall be spaced not more than 24" o.c, in a vertical or horizontal orientation. In a vertical orientation, furring shall be located over wall studs and attached with the required fastener spacing. In a horizontal orientation, the indicated 8" and 12" fastener spacing in furring shall be achieved by use of two fasteners into studs at 16" and 24" o.c, respectively. Residential Siding Replacement Handout Page 6 of 6 Copyright © MNSPECT 2020, Rev. April 2020