Loading...
Inspections - Permit# SP-2021-00100 - 4467 Lafayette Lane - 2/15/2022El TOWNSHIP INSPECTION NOTICE o WwoP ❑ COUNTY ❑ Reinspection _'CITY OF PERMIT # " I Z2 DATE — - / IZ—ARRIVAL TIME ADDRESS 911"7 fib Z_ Zoning ❑ Plumbing UG / AG RI / Final ❑ Rental Inspection Slab ❑ Sewer / Water Hookup ❑ Manufactured Home ❑ Poured Walls / Core Fill ❑ Gas Line Air Test ❑ Fire Inspection ❑ Foundation Pre -Back Fill ❑ Mechanical / FP RI / Final ❑ Demolition ❑ US Moisture/Radon Barrier ❑ Fire Supp. / Alarm RI / Final ❑ Status / Follow-up / Meeting ❑ Framing / Braced Wall ❑ Electrical RI / Final ❑ Complaint ❑ Insulation / Energy Code ❑ Accessibility ❑ Special Investigation ❑ Wallboard / Penetrations ❑ SEC / MS4 ❑ Post Notice W ❑ Lath / Exterior Plaster ❑ Re -Roof / Re -Side ❑ SSTS Q ❑ Final ❑ Re -Window / Re -Door ❑ Other: y G QInsp. Record/Plans on Si s ❑ No All Required -to -date Insp. Complete es ❑ No Project Description: WScope of Inspection: = Corrections: J Q Z 0 co Ct W Ix cc z 0 Ix 0 U. W cc Q y Z W X W cc S SEC: ❑OK ❑Correction: W*All work must comply with MN State building code and manufacturer's installation instructions. Qt ❑ PARTIAL INSPECTION ❑ STOP WORK ORDER W ❑ CORRECT WORK ❑ PHOTOS TAKEN / VIEWED ,PROCEED ❑ A PERMIT IS REQUIRED U ❑ CALL FOR REINSPECTION ❑ A FEE OF $ IS DUE ❑ CLOSE FILE - NOT APPROVED ❑ A SPECIAL INVESTIGATION FEE WILL APPLY ❑ CLOSE FILE ❑ EMAIL TO INSPECTIONS@MNSPECT.COM ❑ LETTER TO FOLLOW ❑NOTICE POSTED ❑ CALL 952-442-7520 FOR ASSISTANCE. ❑ This Inspection Notice Serves as the Plumbing Certificate of Compliance Met With (Print Name): Owner / Contractor Phone: M NSPECT, LLC Inspector (Print Name): �— (952) 442-7520 Toll Free 1-888-446-180f Gold Copy to be kept on job site White Copy / Municipality File F CITY OF SPRING PARK NEW CONSTRUCTION CHECKLIST V & 4467Lafayette Lane PERMIT#: SP-2021-00100 P R MUST BE MET AND ALL ITEMS MUST BE COMPLETED BEFORE CONSTRUCTION/EXCAVATION Pass Fail ❑ -R�- ❑ Permit on site ❑ -P�- Address posted on site ❑ ❑ Locate and show property stakes and building pad stakes ❑ '--T- ❑ Setback Requirements L R Actual: Front: Rear: Side: Side: Required: Front: 30' Rear: 50' Side: 10, Side: 10, Other (come r/front/Lakesh ore) ❑ ❑ Grading/drainage swales established away from neighboring structures ❑ ❑ Erosion control de�vii e established, where required/necessary ❑ ❑ Construction entrance ❑ ❑ Verify elevation of sanitary sewer service to low floor elevation ❑ ❑ Condition of water shut-off/service (mark with contractor's stake) ❑ ❑ Condition of curb and gutter abutting property to be built ❑ ❑ Condition of storm sewer rat abutting the property �J ❑ ❑ Curbs properly bridged for construction traffic ❑ ❑ Condition of trail way abutting the property (if applicable) ❑ ❑ Condition of light or other utility fixtures abutting the property (if applicable) ❑ ❑ Locate and show corrected soil area stakes (if applicable) -Ell, El ElCulvert inspection (if applicable) - -/�-�Z. Signature of Municipality Official Date Signature of Site Contractor Date LA —Building Inspection Services\Forms\Site Checklists\Spring Park Site Checklist.doc Revised May-2016