Loading...
Inspections - Permit# SP-2021-00101 - 4469 Lafayette Lane - 2/15/2022❑ TOWNSHIP INSPECTION NOTICE ❑ COUNTY ITY OF - 5 PERMIT # DATE 17— - - 2�- ARRIVAL TIME, ❑ Not Met ❑ W.W.O.P. ❑ Reinspection Z_I-/Z,7/ ADDRESS Y / Zoning ❑ Plumbing UG / AG RI / Final ❑ Rental Inspection Slab ❑ Sewer / Water Hookup ❑ Manufactured Home ❑ Poured Walls / Core Fill ❑ Gas Line Air Test ❑ Fire Inspection ❑ Foundation Pre -Back Fill ❑ Mechanical / FP RI / Final ❑ Demolition ❑ US Moisture/Radon Barrier ❑ Fire Supp. / Alarm RI / Final ❑ Status / Follow-up / Meeting ❑ Framing / Braced Wall ❑ Electrical RI / Final ❑ Complaint ❑ Insulation / Energy Code ❑ Accessibility ❑ Special Investigation ❑ Wallboard / Penetrations ❑ SEC / MS4 ❑ Post Notice W ❑ Lath / Exterior Plaster ❑ Re -Roof / Re -Side ❑ SSTS Q. ❑ Final ❑ Re -Window / Re -Door ❑ Other: H G IxInsp. Record/Plans on Si - es Yes ❑ No All Required -to -date Ins . Com leted❑ No x Project Description: WScope of Inspection: = Corrections: J Q Z 0 co cc W a 0 0 LL W tr Q rn Z W X W tY 5 SEC: ❑OK ❑Correction: W"All work must comply with MN State building code and manufacturer's installation instructions. cc ❑ PARTIAL INSPECTION ❑ STOP WORK ORDER W ❑ CORRECT WORK ❑ PHOTOS TAKEN / VIEWED ROCEED ❑ A PERMIT IS REQUIRED V ❑ CALL FOR REINSPECTION ❑ A FEE OF $ IS DUE ❑ CLOSE FILE - NOT APPROVED ❑ A SPECIAL INVESTIGATION FEE WILL APPLY ❑ CLOSE FILE ❑ EMAIL TO INSPECTIONS@MNSPECT.COM ❑ LETTER TO FOLLOW ❑NOTICE POSTED ❑ CALL 952-442-7520 FOR ASSISTANCE. ❑ This Inspection Notice Serves as the Plumbing Certificate of Compliance Met With (Print Name): Owner/Contractor Phone: MNSPECT, LLC Inspector (Print Name): (952) 442-7520 Toll Free 1-888-446-18� Gold Copy to be kept on job site White Copy / Municipality File PTE PCITYOF SPRING PARK NEW CONSTRUCTION CHECKLIST ADDRESS: 4469 Lafayette Lane PERMIT* SP-2021-00101 THE INSPECTOR MUST BE MET AND ALL ITEMS MUST BE COMPLETED BEFORE CONSTRUCTION/EXCAVATION N/A Pass Fail ❑ ❑ Permit on site ❑ ❑ Address posted on site ❑ ❑ Locate and show property stakes and building pad stakes ❑ ❑ Setback Requirements L R Actual: Front: Rear: Side: Side: Required: Front: 30' Rear: 50' Side: 10, Side: 10' Other (corner/front/Lakeshore) ❑ ❑ Grading/drainage swales established away from neighboring structures ❑ ❑ Erosion control device established, where required/necessary ❑I ❑ Construction entrance ❑ ❑ Verify elevation of sanitary sewer service to low floor elevation z❑ ❑ Condition of water shut-off/service (mark with contractor's stake) ❑ Condition of curb and gutter abutting pro erty to be built 'l�-e�� (: f C � 7- ❑ ❑ s12 Condition of storm sew+err/grate #buftilng the property ❑ ❑ Curbs properly bridged for construction traffic ❑ ❑ Condition of trail way abutting the property (if applicable) ❑ ❑ Condition of light or other utility fixtures abutting the property (if applicable) ❑ Locate and show corrected soil area stakes (if applicable) ❑ ❑ Culvert inspection (if applicable) Signature of Munidipality Official Date Signature of Site Contractor Date LA —Building Inspection Services\Forms\Site Checklists\Spring Park Site Checklist.doc Revised May-2016