Correspondence - 4787 Shoreline Drive - SAC Notice - Back Channel - 2/25/2022MCES USE: Letter Reference: 220128A6 Address ID: 753496 Payment ID: 455176
Date of Determination: 01/28/22 Determination Expiration: 01/28/24
Project Name: Back Channel Brewing
Project Address: 4254 Shoreline Drive
City Name: Spring Park
Applicant: Cole Buttenhoft, Cornerstone Investors
Special Notes: This determination is based on a request for an Industrial SAC Baseline review and is a result of new information for
the existing tenant in this building based on previous SAC history. The SAC is due, regardless if a City permit is issued for any new work
as there has been a change in SAC use and increase in SAC capacity demand based on what has been paid on the site previously.
*For the process discharge portion of the determination, the business has the option to purchase additional SAC units than MCES'
established minimum of 3 units that are included in the Initial SAC Calculation below. 4 additional SAC units can be purchased with this
determination when obtaining a building permit with the City. The additional SAC units will increase the baseline value which may
reduce or eliminate future Industrial Capacity Charges (ICC); at each reporting period, discharge flow is compared to the baseline and
any overage is billed ICC. If the full 7 SAC are not paid at the time of the original building permit issuance by the City, the business may
be subject to ICC at the time of the industrial permit reporting period. MCES Industrial Waste will be in contact with the business to
discuss the industrial waste permit and ICC.
Initial SAC Calculation:
Charge Calculation:
Warehouse/Production: 2942 gross square feet @ 3800 square feet / SAC = 0.42
Process Discharge: 2000 gallons per day @ 274 gallons / SAC = 7.30; minimum of 3 SAC charged on initial determination
Total Charge: 3.42
Credit Calculation:
Warehouse (Grandparent 1953): 2942 square feet @ 6950 square feet / SAC = 0.42
Total Credit: 0.42
Net SAC: 3.00
3 SAC Due
Optional Process Discharge Calculation:
Charge Calculation:
Process Discharge: 2000 gallons per day @ 274 gallons / SAC = 7.30 — 3.00 SAC charged above = 4.30
Process Discharge Total: 4.30 = 4 SAC Due
Initial + Optional SAC Due: 3 + 4 = 7 SAC Due*
The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the business
use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be made. If you have
any questions email me at: toni.ianzig@metc.state.mn.us.
Thank you,
Toni lanzig
SAC Technician
Please visit our SAC website by going to:
htti)://www.metrocouncil.org/SACprogram
390 Robert Street North 1 St. Paul. MN 55101-1805
Phone 651.602.1000 1 Fax 651.602.1550 1 TTY 651.291.0904 1 metrocouncil.org ' • •
An Equal OpportunitY Employer
Tank Sizes Below
5 x 15bbl Uni-tank fermentors
1 x 15bb1 Brite tank
1 x 30bb1 ante tank
I COIN ReSA! I�
O �O I Whirlpool Kettle
atexchanger I
15 BBL Brewhouse PRODUCTION AREA
103
IO T� cull -Aitl: I
I
C
0 Drain-1 �
I
I �
I
,
Chemical
Wash
Down Packaging area
Storage
I
Homer
Office
.�
�
,
�
I
WNc nP
-
Water Suppty for
brewing
nd cleaning
NvxaN RA
�
:I
I
I
- __
3
I
WALK -NI COOLER
1m
1
-.0 —
HS-1
$
1
I
I
,
s-1
water
H�
I
I
STORAGE I�
...
Not our a
tW
_rl.Nc A zo =
I
Water-�
Sooner
No
a
I
MF- `-
MOP-1
I RESTRM RNTRM
104
I
STORAGE
106
I
I
=77
I
MOP HOOK
1
I
I
I
FINISHES & EQUIPMENT PLAN
EQUIPMENT PLAN
`F2.O�SCALE: 3/16" = 1'D3/16" = 1'D'
NON -Contact cooling water
We use our water from the CLT to cool down boiling
wort through a heat exchanger. The water is recycled
back to our HLT to be used for other brewing process.
No Chemical greater than
5 gallons in size
EQUIPMENT SCHEDULE
SYMBOL
DESCRIPTION
ANNIFACn1RER
MODEL NUMBER
Siff
®
MOPSINK
EXISTING
EXISTING
21'R24'
<2=
MOP FAUCET
EXISTING
EXISTING
®
HAND SINK
PERLICK
TSDI2HS
12'X2A'
®
TRIPLE SINK
JOHN BOOS
3B/MN-2018
83'x29.S
QCID
WALK4N COOLER
CUSTOM FABRICATED
20k20k17
®
TRENCH DRAIN
1Z. B'. 3'
40EE�
REVERSE OSMOSIS PANEL
®
MASH URM
RETTU
®
FERMENTERS
ROOM FINISH SCHEDULE
ROOM
FLOORIBA9E
WALL
OSUMI
100 STORAGE
SP.LLED CONCRETE FLOOR W/ N' VINYL BASE IGREYI
—L4DR—F1N18H,1N0V8TRSLL
(NRADE EPDXY WALL PLANT
EXPOSED CEILING TRUSSES
101 - WAUc-IN COOLER
SEALED CONCRETE ROOR S URETHANE RESINOUS
BOOR W/ INTEoRAL COVE SASE
MIEAN9IED WASIMME WALL
PANELS
PREFRNISHED WASHABLE CEIUNO
PANELS
Im-HALL
SEAED CONCRETE FLOOR W/ N'VNM SASE(GREY)
IEVELI DRY'VrALL nI1R11. lVOUS1ISAL
r,rtAOE Evoxr wAu vANrt
E%POBED CBUNG TRU83E5
103-vaooucnON AREA
HEW Nsf APMOVED UFIETIIMNF RESINOUS FLO W/
INTEGRAL COVE SASE
ERPPANELSTota AFF.EP Au,
PIN' ABOVE
ExPOSED HUNG TRUSSES
ANDY CAMPBELL
DESIGN COMPANY
J 00
to
(1)LL0Z
C c- C1
_O x
U U °a
L
In 0)
UO�C
m a t l)
Signature
zpeUrr0M1 uul tlr+ryn�.
rtwn a repnx peRva
p ti sc1
U�s<Ptiv Sbted Mray.M
SgDBIIre
AndN CRnIpIN11
lamria_. w/o
RegW.t— Number
Architect
P+KN Cm�pOcll DerM� Congtnr
I M pow E�:S" St. MN
MN KlAI
61a3Sf-MSI
a#/aW.hstuel++4nn
Current Issue
PERMIT DRAWINGS REV
6-3-20
Revision History
emm o.
Pe.mn pwRq PEP
w-a, I F§mn Creuvv, RE'P
Sheet Title
FINISHES 8
EQUIPMENT PLAN
Sheet Number
F2.0
1 z ,"