Loading...
Permits - Permit# 24SP-00003 - 4000 Shoreline Drive - 1/25/2024IJL� or - City of Spring Park Repa i r/Remode VAlteration 4349 Warren Ave, Spring Park, MN 553$4 (Commercial) PRING #%RK 24SP-00003 n L -Vliam on a Phone: (952) 471-9051 Fax: (952} 471-9160 For Inspections: (952) 442-7520 Date Issued: 01/25/2024 Property Owner: SHORELINE PLACE OWNERS ASSOC Expiration Date: 07/23/2024 Mailing Address: 5 Shoreline Place Job Site Addnm: 4000 SHORELINE DR, SPRING PARK, MN 55384 Spring Park, MN 55384 Category: Commercial Alteration Phone: (952) 201-0212 PermR Type: Repair/Remodel/Alteration Email: butterfat0l@aol.com (Commercial) Valuation: $31,246.00 Description of Work: remodel from water damage Subdivision: Required Setbacks: Parcel ID: Filing: Lot: Actual Setbacks: Block: Total Sq Ft: Contractors: Fee Items Amount Primary PILLAR CONSTRUCTION (612) 280-8355 State Surcharge $15.62 Commercial Building Permit $ 600.00 Commercial Plan Review $ 390.00 Total Fees: $1,005.62 NOTICE Signature of Applicant/Date Building Department Signature/Date 01/25/2024 MUST BE POSTED ON JOB SITE iij- INSPECTION CARD City of Spring Park SPRING PARK OnGakeWinnetonka 4349 Warren Ave, Spring Park, MN 55384 POST THIS CARD IN A SAFE CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE WADE AND SIGNED OFF BY THE APPROPRIATE AUTHORr YAND THE BUILDING ISAPPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE.IDBOTE. APPLICATION NO.: 24SP-00003 TYPE: RepalNRemodeVAlte radon (Commerciao ISSUED DATE: 01/25/2024 EXPIRATION DATE: 07/23/2024 PROJECT ADDRESS: 4000 SHORELINE DR, SPRING PARK, MN 55384 PARCEL NO.: SHORELINE PLACE OWNERS OWNER: ASSOC CONTRACTOR: PILLAR CONSTRUCTION CONTRACTOR PHONE: (612) 280-8355 DESCRIPTION OF WORK: remodel from water damage CONSTRUCTION TYPE: OCCUPANT LOAD: DATE DATE INSPECTION INSP PASSED COMMENTS INSPECTION INSP PASSED COMMENTS Energy Code/Insulation Fire/Draft Stopping Buildina Final Fire Approval: Date: Engineering Date: Approval: PW Approval: Date: Other ( j: Date: To request an inspection: (952) 442-75M Page 1 of 1 CITY OF SPRING PARK PAGE 1 BUILDING PERMIT 4349 Warren Avenue Spring Park, MN 55384 ❑ Handout Given Routet�to S CT Phone: 952-471-9051 Fax: 952-471-9160 El Handout Given �„ 9Ar �F/sah .'UTE ADDRESS: Mu 5kdfell f! Ue1va PID• -1) Was the home constructed before 1978? (YES ❑, continue with line 2, NOXcontinue without completing EPA Section) :t) Will the work disturb afi sq ft of interior painted surfaces or alp sq ft of exterior painted surfaoes? (YES)%go to line 4. NO a line 3) :1) Are there any windows being replaced? (YES a, go to line 4, NO bl�pontinue without completing EPA Section) +l) Has this home been Certified Lead Free? (YES you MUST Attach C ification Information, NOXcompiete line 5) ,I) EPA Contractor Certification Number._ NAT - '� a - (apptles to contractor only} PROPERTY OWNER: SwingkA,t O�'ie,. ray. �I,a��• Crew.■ r,dr !s? Contractor License No: Emal: ;a 10 kMHITECT: State: ._nail: 'TYPE OF WORK: Coemlereial esidenW EST. VALUA'11�N OF V ORK $ Squam feet OetaNed Dawlptlon of Work: Phone: 9rat—OV I -• QZ1-k Address: J) -7 ' ^� - - -. / 1'# 7vt� _E�f.`. `,rlillrs,f+rty\- t„OYVN Contact Name- ` '.done: a New Constrwhon .: L Dec :, k o _ Pool , _ :.+. , r3 Re -Roof a Change of Use r- Re 4 n Re -Side a Finish Basement :;ei;. '� n Fence �2etrtodel , nFir.�+,r�ile�r -a Shed o AdcGtion - ?� �:Tn � � a WindowlDoar Replacement i arege-Attache - rlumbingilravide d tar on Page 2 being replaced o cress', ai i}� �, re a MechanicaLLmvide dMill on Page 2 o Miso Other Y a rgnati■.ofliliSlrPPk= blt� 4■IpfOp■[tyowlN�Oi'i en 'Jd��h[Wr ul11LQ dMfiipfglNR�1N■.ISM41 adaromuthOht■slheaonW9AAnfnl r%IarM desipwe end the auidYrg tatith r tls�ru+te errhr the pmpeny to psrbrm naaded ii qc W r e . Erm, n ny Re gfout prior rise. I trerabyat:krrvandge drat r hers read this application and stale Me of plarmefan Is vm and ee■et to the beat of any knowledge I father spree that ■i vA ft jm rormadaatilF �cCOW" with approved ptu10, apeelrfesiorrs and conditions and to abide by of wdh■rc■e of pw MunkpemAy nd the hen of the Shin I a AAl a—f t r- k*i i;-~A4 w r pannlL l egrss to p■y ere phn mvWm tees @M if l choose rot to proceed with ens work. Pesnit aspbaa when work not commenced y11ThYf 1 BQ trem��u rrendad. ib■ndmrod. Or not IMpeCIed for 180 of this permit days. pk d ba subiectio s penafy. rrr aY W�Yod +cope . of wok * am ■ perms or inspocem, Noise Crdlna Eftsa 9nNDAY - FRIDAY Before 7 am. and after 10 p.ta. WeekendelHolidays before 7 a.m. and 8 p.m. SWMTURE OF A DATE. 1 F PRINTS % N . Th� is t#le sigrsaiure ef: o Owner or �Owneft R OCCUP..:.: GOhIST. TYPE: CODE: BLDG SPRINKLED Yes 1 No VALUATION_ Permit Fee: $ 11/CO+&O Plan Review Fee: $]M,90 State Surcharge: $ Site Inspection Fee: $ S.E.C. Fee. $ Investigation Fee 1 Other Fee: $ Copy Charge ($.25 per 8.5 x11 page) S Liccnm Ctwrk (ti.5) f Load Chock ($5) S SUB TOTAL S Plumbing Fee (from Page 2) S Mechanical Fee [from Paae 21 S Setbacks: Budding Approval By. Printed Building Approval By: City Approval By: j Paid: I Vb6 a ate: Receipt WAC Charge. $ Sewer & Water Hook -Up: $ Sewer & Water Disconnect: $ Water Meter Muni SENVA Fee: *2016 SAC Escrow, 22.485 Other. S TOTAL DUE: SISM. room* 'NOTE: Commercial plans will be subrOMW to the Met Council Environmental Svcs for SAC cidermirmdan. Escrow psymsnt will be raqulred when parmit Is issued, If after Met Council review no SAC is determined, escrow will be refunded in full. DATE: ❑ License Verification ❑ Lead Verification - Checked By. DATE: 7,1111C I -Idt j By. CITY OF SPRING PARK PAGE 2 Cwrtr: of 0 MECHANICAL PERMIT ❑ PLUMBING PERMIT FOR PERMIT ISSUANCE PAGE 1 and PAGE 2 should be complete Indicate type of project, fixtures, and Gas Lines you wig be installing or replacing (include count for e . ty fixture): anlKv AIECHAAWAL FWMRES GAC.. Furnace aw�Kitchen Fan l F mace Air Conditioning System Bach Fan Fireplace Air Exchanger Grill Unit Hester �"� Water, Unit Heater Grill _ In Floor Heat , ❑ Replacement (one fixture only, no piping or Vent changes) a AdditioWRemodei ❑ New Construction ❑ Other ! of ruccal'Pennit Fee: $ Gas Line Permit Fee: $ Stab Surcharge: $ Other: S 101af Mbchanlical Pemft S Indicate type of project and fixturesPLUM��u wi�stalling or replacing (include count for each type of fixture): Y4ntity Quantity Qmnm Water Heater Shower Laundry Tub Gas ❑ Electric Dishwasher Dough -In Frame Facture Water Softener Clothes Washer sump Leven Sprinkler System Ice Maker Line Water Piping System Water Closet (Toilet) Hose alb Floor Drain ❑ Replacement (one frxture only, no piping or Vent changes) ❑ Addition/Remodel ❑ New Construction ❑ Other us. only: Plumbing Permit Fee: $ State Surcharge $ Other: $ Total Plumbing Permit: S .r" PARK Project Name: City of Spring Park 4349 Warren Ave Spring Park, MN 55384 Phone (952) 471-9051 Fax (952) 471-9160 Date: 01/17/2024 Approval Status: Approved with Comments Jurlsdk%on: City of Spring Park Construction Type: ID: 24SP-00003 Applicant Name: Pillar Construction - Joe Applicant Phone: (612) 280-8355 Applicant Email: joe@pillarconstructiommn.com Jobsite: 4000 SHORELINE DR Code: 20201300, Minnesota Building Code Administration; 20201305, Minnesota Building Code Reviewed: Building The plans and specifications, for the project named above, have been reviewed for substantial compliance with the current Minnesota State Building Code. This review is limited to the submitted scope of work; is based upon the supposition that the data on which the design is based are correct and that the necessary legal authority has been obtained to construct the project. Although every attempt has been made to identify code issues or concerns for proper and necessary change, the project designer(s), the building contractor(s) and the property owner(s) are ultimately responsible for providing complete code compliance and maintaining minimum construction standards for the safeguarding of life or limb, health, public welfare and property while constructing this project. Approval is based on the correction of all noted deficiencies and compliance with all items listed below. Any changes from these documents and/or additional information shall be submitted to the Department of Building Safety for code compliance review and approval. Written response of approval must be on site prior to implementation of such changes. The following information is related to the submitted plans/scope or as general information regarding code compliance. Compliance with the stated requirements will be verified during the construction process. All work shall be inspected. It is the responsibility of the contractorrinstaller to contact the Department of Building Safety, when ready to schedule an inspection, at (952) 442-7520 during regular business hours. If you have any questions or concerns regarding this plan review, please contact me via telephone at (952) 442-7520 or email at codereview@mnspect.com. Kevin Kamerud Plans Examiner (952) 442-7520 kkamerud@mnspect.com 4000 SHORELINE DR Page 1 2-1 Plan S ' c Items: Building: Approved with Comments - Kevin Kamentd, kkamerud@mnspect.com January 17, 2024 Permit Number: 24SP-00003 Project Name: 4000 Shoreline Dr Spring Park, MN 55384 Architect: N/A Contractor: Pillar Construction 8401 73rd Ave N #41 Brooklyn Park, MN 55428 Scope: Repair water damage in townhome garages City of Spring Park 4349 Warren Ave Spring Park, MN 55384 Phone (952) 471-9051 Fax (952) 471-9160 The plans and specifications for the project named above have been reviewed for substantial compliance with the current Minnesota State Building Code. This review is limited to the submitted scope of work; it is based upon the supposition that the data on which the design is based is correct; and that the necessary legal authority has been obtained to construct the project. Although every attempt has been made to identify code issues or concerns for proper and necessary change, the project designer(s), the building contractor(s) and the property owner(s) are responsible for providing complete code compliance and maintaining minimum construction standards for the safeguarding of life or limb, health, public welfare, and property while constructing this project. Items to be Addressed and/or Corrected: 1. Building Code Items: General Information: 1. Inspections: a. Construction or work shall be inspected in accordance with the requirements of Minnesota Rule 1300.0210. B. It is the contractor/installer's responsibility to contact the Department of Building Safety, when ready to schedule an inspection, at (952) 442-7520 between 8:00 a.m. and 4:30 p.m., Monday through Friday. c. The approved permit and all related plans and documentation shall be on site and available to the inspector at the time of inspection. d. Failure to provide the required documentation to the inspector at the time of inspection may result in a 4000 SHORELINE DR Page 2 ri01, PARK City of Spring Park 4349 Warren Ave Spring Park, MN 55384 Phone (952) 471-9051 Fax (952) 471-9160 cancelation of the inspection and additional inspections fees for the additional inspection(s). e. The field inspector may identify additional code compliance requirements. Any additional identified code compliance requirements shall be completed. Required Inspections: • Insulation • Fire/draft stopping Final Required Documentation: 0 Special Inspections Summary Report 2. Applicable Codes: a. 2020 MN Building Code (MBC) (2018 IBC as amended) b. 2020 MN State Fire Code (MFC) (2018 IFC as amended) C. 2020 MN Energy Code (MCEC) (2018 IECC as amended) d. 2020 MN Accessibility Code (MAC) e. 2020 MN Plumbing Code (MPC) (2018 UPC as amended) f. 2020 MN Mechanical Code (MMC) (2018 IBC as amended) g. 2020 Electrical Code (NEC) Additional Permits Required Electrical Kevin R Kamerud Plans Examiner MN CBO Lic #130805364 MNSPECT, LLC., A SAFEbuilt Company Helping You Comply with the Code 235 First Street West Waconia, MN 55387 Direct 952-800-8713 Office 952-442-7520 kkamerud mns ect.com www.mnspect.com 4000 SHORELINE DR Page 3 Read all attached materials. Everyone performing work to which the code is applicable shall comply with the code. The field copy of these plans must be kept on -site and made available to inspector during all inspections. To schedule inspections call (952) 442-7520 Please have the permit number and street address ready at the time of the call. Plan Revisions All construction shall comply with the approved_ lens. Plan revisions will not be reviewed in the field without prior approval from the Building Official. Submit all Plan revisions to the Department of Building Safety for review, prior to their construction. REFER TO APPROVAL LETTER FOR ADDITONAL COMMENTS AND REQUIREMENTS Enclosed space under stairs that is accessed by a door or access panel shall have walls, under -stair surface and any soffits protected by minimum 1/2-inch gypsum board. Install draft stopping consisting of minimum 1/2-inch drywall or 3/8-inch wood structural panel parallel to floor framing so concealed space does not exceed 1000 ft sq. Draft -stopping shall divide concealed spaces into approximately equal areas. The integrity of draft -stopping shall be maintained. Manufacturer's Installation Instructions Shall Be Followed And Available To The Field Inspector At Time Of Inspection. Electrical All electrical must be approved by local Electrical Inspector. For electrical permit inquiries please contact the City of Spring Park Electrical Inspector. Dave Hucky (952) 442-7520 Garage and it's attic is required to be separated from the dwelling and its attic by not less than 1/2-inch gypsum fastened per Table R702.3.5 If dwelling extends above garage, then garage ceiling to be protected with not less than 5/8-inch Type X gypsum attached perpendicular to the framing using minimum 1 718" 6d nails or equivalent screws 6" o.c. All structure that supports required separation is to be protected with 112" Gypsum fastened per Table R702.3.5 NOTICE Plan review was done in accordance with the current Minnesota Building Code. Plan review does not waive any additional code compliance issues found on site. Reviewed for Code Compliance This review is limited io the submitted scope of work, is based upon the supposition that the plan accurately depicts the intended construction and end -use, that the necessary legal authority has been obtained to construct the project and work is subject to code compliance and field inspection during construction. By: Xwnl(amansd Type of Construction: VB Date: ill7J2024 Occupancy Classification: IRC-1 'Permit #: Zi SP-40O03 Code Edition: 2020 MN Building Code Separate Permits Required For: ii Electrical Mechanical Plumbing Fireplace Demolflion Fire Suppression System Septic R314.2.2 Alterations, repairs and additions. An individ- ual dwelling unit shall be equipped with smoke alarms located as required for new dwellings when: 1. Alterations, repairs (including installation or replacement of windows or doors), or additions requiring a building permit occur; or 2. One or more sleeping rooms are added or created in existing dwellings. Buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. Addresses shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of 112 inch. Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other sign or means of identification shall be used and maintained. Openings around vents, pipes, ducts, cables and wires shall be protected with an approved material, meeting ASTM E136 to resist the free passage of flame and products of combustion. Existing Ceiling, Wall or Floor Cavities separating conditioned from non -conditioned spaces exposed during construction shall be filled with insulation. Basements built before June 1st 2009 are exempt 5T`FtUCTtON 1/16/2024 City of Spring Park Responding to the attached documentation for, please see the responses below. 1. There are 4 areas being worked on • Unit 6 Stairwell • Unit 5 Garage • Unit 7 Garage • Unit 10 Garage 2. The Firewalls are only in the 3 garages, The garages measure 20'3"L x 1VrW x S'6"H. The firewalls are one of the short walls In each garage, or 11'7"*816" 3. These are residential garage so I am unclear as to the third question. Please email or call me back with any additional requirements to Issue the permit. Thanks, Leon. leon ftillarconstructiommn.com 612-280-8355 Pillar Construction, LLC 84017314 Avenue North, Suite 46, Brooklyn Paris, MN 55428 Minnesota License #BC713625 https:/Iwww.p'illarconstructionmn.com 763-238-2256 PILLAR Pillar Construction �PN21MUCt10N 840173rd Ave #46 Brooklyn Park, MN 55428 MN LIC# BC713625 SIN# - 81-2922256 Client: Shoreline Place Property: 4000 Shoreline Drive Spring Park, MN 55384-9644 Operator: LEON Estimator: Leon Olmscheak Reference: Company: Auto Owners Type of Estimate: water Damage Date Entered: 10/18/2023 Price List: MNMN8X OCT23 Labor Efficiency: Restosation/ServiceAb modal Estimate: SHORELiN&PLACE File Number: 300-0399374-2023 Date Assigned: Cellular: (952) 201-0212 Business: (612) 280-8355 E-mail: leonftillareonst actiommIL oom PILLAR PMr Construction CONBTMCTJOiI 840173rd Ave 046 Brooklyn Park, MN 55428 MN LTC# BC713625 BIN# - 81 2822256 SHORELINE -PLACE SHORELINE -PLACE CAT SEL ACT DESCRIPTION CALC QTY RESET REMOVE REPLACE TAX O&P TOTAL L ELE MISC + ELECTRICAL I I.00 EA OPEN ITEM Anything more than resetting lights is not included in this bid 2. FEE TIPF + Taxes, insnzance, permits & fees (Bid It=) 1 1.00 EA SUPPLEMENT 3. DMO D'TKUCK - Single axle dump crock - per load - including dump flees l LO0EA 355.86+ 0.00= 0.00 71.18 427.04 Totab SHORELEM&PI.ACE 0.00 71.19 427.04 i Unit 6 Stairwell Formula 20' a 4' a 8' I 352.00 SF Walls 90.00 SF Ceiling 432.00 SF Walls & Ceiling 80.00 SF Floor r 8.89 SY Flooring 44.00 LF Floor Perimeter 160.00 SF Long Wall 32.00 SF Short Wall 44.00 LF Ceil. Perimeter Missing Wall - Goes to Floor/Ceiling 4' X 8' Opens Into Exterior CAT SEL ACT]DESCRIPTION CALC QTY RESET REMOVE REPLACE TAX O&P TOTAL Celling 4. INS BT4+ + Batt insulation - 4" - R13 - unfaced Matt C 80.00 SF 0.00+ 0.95 = 3.61 15.92 95.53 5. INS VIS + Polyethylene vapor harrier C 80 00 SF 0.001- 0.39 = 0.68 6.38 38.26 6. DRY 5/8 + 518- drywalt - hung, taped, floated, ready for Paint 16 16.00 SF 0.00+ 3.56 = 1.06 11.62 69.64 Walls 7. PNf SP + SeaUprime (l coat) then paint (I coat) the ceiling C 80.00 SF 0.00+ 1.32 - I.50 2142 129.52 wails 8. INS BI6 + Blown -in insulation - 6- depth - R13 I&LW*2+SW 192.00 SF 0.00+ 0.82 = 6.55 32.80 196.79 9. INS VIS + Polyethylene vapor barrier 192 192.00 SF 0.00+ 0.39 - 1.64 15.30 91.82 SHORELINE -PLACE 1/16/2024 Page:2 PILLAR Pillar Construction eg04i7mu4T10k 9401 73rd Ave #46 Brooklyn Park, MN 55428 MN LIC# BC713625 BIN# - 81-2822256 CONTE4UED - Unit 6 Stairwell CAT SEL ACT DESCRIPTION CALL QTY RESET REMOVE REPLACE TAX O&P TOTAL 10. DRY 5/8 + 5/8" drywall - bung, taped, floated, ready for paint 192 192.00 SF 0.00+ 3,56 = 12.77 139.26 935.55 11. PNT SP + Seanprime (l coat) then paint (1 coat) the walls W 352.00 SP 0.00+ 1.32 = 6.60 94.24 565.48 12. FNC HR R Detach & Reset Handrail - round / oval - softwood - waK mounted 16 16.001LF 8.45 0.00+ 0.00= 0.00 27.04 162.24 13. FNC C + Casing -21/4" 17+I6 33.00 LF 0.00+ 2.84 = 4.05 19.56 117.33 doer and window 14. PNT C 1 SP M Seal (1 cost) & paint (1 coat) casing 33 33.00 LF 0,00+ 0.15 = 0,42 1.08 6.45 Flno" 15. CLN FCCSTP + Clean carpet - cleaning charge per step 13 13.00 EA 0.00+ 7.08 = 0.07 19.42 110.53 Totals: Unit 6 Stairwell 3&95 41&04 2,418.14 Unit 5 Garage i LaW=H 20' 3" a 11' 7" Y 8' 699 ft 478.17 SF Walls 234.56 SF Ceiling 712.73 SIB Walls & Ceiling 234.56 SF Floor 26.06 SY Flooring 54.67 LF Floor Perimeter 172.13 SP Long Wall 98.46 SF Short Wan 63.67 LF Coil. Perimeter Missing Wall - Goes to Floor 9' X 7' Opens into ExWor CAT SEL ACT DESCRIPTION CALC QTY RESET REMOVE REPLACE TAX O&P TOTAL Contents 16. CON LAB + Content Manipulation charge - per hour 2*362 12.00 HA O.OG+ 59.73 = 0.00 14OS6 $45.72 Estimated. This is 2 guys far 3 hours to move from the garage to an onsite storage pod They to move tbem back in after the completion of the repairs. 17. CON STOPC + Job -site c argo/sUnage container - 20' long (per month) 2 2.00 MO 0.00+ 119.00 - 0.00 47.60 29560 SHOAELDR!,PLACE 1/16/2024 Page:3 PILLAR Pillar Construction CONSTRUCTION 840173rd Ave #46 Brooklyn Park, MN 55428 MN LIC# BC713625 EIN# - 81-2822256 CONTINUED - Unit 5 Garage CAT 'SEL ACT DE SCRIMON CALC QTY RESET REMOVE REPLACE TAX O&P TOTAL is. CON STOPMD + Job -site moving container - pick up/del. (ea, way)17-20' 2.00 EA 0.00+ 90.00 = 0.00 32.00 192.00 Calling2 19. INS BT12 + Batt insulation -12" - R38 - u nfacxd batt C*.75 175.92 SF • 0.00+ 2.20 - 22.35 81.88 491.25 There is an area of blown in that needs to be redone. The ceiling assemblies are a bit odd, so this amount may need to be supplemented after done by an insulation coanpany as we will have a permit on this. 20, INS VIS + Palyethylene vapor barrier C*.75 175.92 SF 0.00+ 0.39 = I.50 14.02 84.13 21. INS BI20 + Blown -in insulation - 20" depth - R50 CO.25 58.64 SF 0.00+ 2.45 = 9.30 30.60 193.57 22_ INS VIS + Polyethylene vapor barrier C*.25 58.64 SF 0.001- 0.39 - 0.50 4.68 28M 23. DOR OH10 R Detach & Rasa Overhead door & hardware - UP x 7' l 1.00EA 464.50 0.00+ 0.00= 0.00 92.90 557AO 24. DOR OHORS + Overhead (garage) door opener - Detach & reset I I.00 EA 0.00+ 278.70 = 0.00 55.74 334A4 25. DRY A + 5/8" drywall - hung, taped, floated, ready fur paint C 234.56 SF 0.00+ 3.56 = 15.60 170.12 1,020.75 26. DRY 5AWT + 5/8" drywall - hung & f"me taped only C 234.56 SF 0.00+ 2.77 - 14.00 132.74 796.47 The city may require double drywall on the fire assemblies. The second layer is an open itean pending walk through with the city inspector, 27. PNT SP + Seal0ime (I coat) then paint (1 coat) the ceiling C 234.56 SF 0. F 1.32 - 4.40 62.80 376.92 Garages were painted walls and ceilings fim the photos i seen wars 28. FNC SH12 R. Detach & Reset Shelving -12" - in place 24 24.00 LF 11.30 0.00+ 0.00 = 0.06 54.26 325.52 29. INS BT6+ + Batt insulation - 6" - R21- unfaced batt SW 99.46 SF 0.00+ 1.55 = 8.65 32.26 193.52 30. INS VIS + Polyethylene vapor barrier SW 98.46 SF 0.00+ 0.39 - 0.94 7.94 47.08 31. DRY 5/9 + 5M" drywall - hung, taped, floated, ready for paint W 478.17 SF 0.00+ 3.56 = 31.80 346.32 2,080.91 32. DRY 5AWF + 5/8" drywall - hung & fine taped only SW 98 A6 SF 0.00+ 2.77 = 5.89 55.72 334.33 33. AM CLKF + Caulking -latex fire sealant PC 63.67 LF 0.00+ 4.99 = 7.92 65.12 390.75 r e iuired fire caulking. to include short fnewall numbly SHORELINE -PLACE 1/16/2024 Page:4 PILLAR Phi ar Constniction coHainu6s10e 840173rd Ave #46 Brooklyn Park, MN 55428 M 4 LIC# BC713625 EIN# - 81-2822256 CONTINUED - Unit 5 Garage CAT sm ACT DESCRIPTION CALC QTY RESET REMOVE REPLACE 34. PNT SP + Seal/prime (1 coat) then paint (1 mat) the walls W 478.17 SF 0.00+ 1.32 - Floor TAX O&P TOTAL 8.97 128.04 769.19 35. CLN FINALR + Final cleaning - construction - Residential F 234.56 SF 0.00+ 0.38 = 0.00 17.62 106.95 36. LIT AV R Detach bt Reset Light Fixture 1 1.00 EA 76.50 0.00+ 0.00 = 0.00 15.30 91.80 Totals: Unit 5 Garage 131.77 1,5W.22 915mis Missing Wall - Goes to Floor CAT SEL CALL Contents Unit 7 Garage 472.50 SF Walls 702.50 SF Walls & Ceiling 25.56 SY Flooring 170.00 SF Long Wall 63.00 LF Ceil. Perimeter 9' X 7' LxWxH 20' x 11' 6" x 8' 6" 230.00 SF Ceiling 230.00 SF Floor 54.00 LF Floor Perimeter 97.75 SF Short Wall Opens into Exterior ACT DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 37. CON LAB + Content Manipulation cba:ge - per ]tour 2*3*2 12.00 HR 0.00+ 58.73 = 0.00 140.96 845.72 Estimated. This is 2 guys for 3 hours to move from the garage to an onsk storage pod They to move them back in afL-r the completion of the repairs. 39. CON STOPC + Join -sum rargo/slorage container - 20' long (per month) 2 2.00 MO 0.00+ 119.00 = 0.00 47.60 285.60 39. CON STOPMD + Jab -site moving container -pick npldel. (es. way)12'-20' Ceiling 2 2.00 EA 0.00+ 80.00 - 0.00 32.00 192.00 40.1NS 1ST12 + Batt insulation -12" - R38 - umfaced batt C*.75 172.50 SF 0.00+ 2.20= 21.91 80.28 481.69 There is an area of blown in that needs to be redone. The ceiling assemblies one a bit odd, so this amount may need to be mWlementcd after done by an insulation eompny as we will have a permit on this. SHORELINE -PLACE 1/16/2024 Page:5 PILLAR Filler Construction CONS7AYCTlO" 9401 73rd Ave #46 Brooklyn Park, MN 55428 MN LIC# BC713625 EIN# - 81-2822256 CONTEWED - Unit 7 Garage CAT SEL ACT DESCRIPTION CALL QTY RESET REMOVE REPLACE TAX O&P TOTAL 41. INS VIS + Polyethylene vapor barrier C*.75 172.50 SF 0.00+ 0.39 = 1.47 13.76 82.51 42. INS B120 + Blown -in insulation - 20" depth - R50 C*.25 57.50 SF 0.00+ 2A5= 9.12 30.00 180.00 43. INS VIS + Polyethylene vapor harrier C*.25 57.50 SF 0.00+ 0.39 - OA9 4.58 27.50 44. DOR OHIO R. Detach & Reset Overhead door & hardware - IW x 7' 1 l .QO F.A 464.50 0.00+ 0.00 = 0.00 92.90 557. i0 45. DOR OHORS + Overhead (garage) door opener - Detach & reset 1 1.00 EA 0.00+ 278.70 = 0.00 55.74 334.44 46. DRY 518 + 519" drywall - bung, taped, floated, ready for paint C 230.00 SF 0.00+ 3.56 = 15.29 166.82 11000.91 47. DRY 51M + 518- drywall - hung & fire taped only C 230.00 SF 0.00+ 2.77 - 13.73 130.16 780.99 The city may require double drywall on the fire assemblies. The second layer is an open item pending walk through with the city inspector. 48. PNT SP + Seal/prime Q coat) then paint (1 coat) the ceiling C 230.00 SF 0.00+ 1.32 - 4.3E 61M 369A9 Garages were painted walls and ceilings from the photos i seen Walls 49. FNC SH12 R Detach & Reset Shelving -12- - in place 24 24.00LF 11.30 0.00+ 0.00= 0.06 5416 325.52 54 INS BT6+ + Batt insulation - 6" - R21- unftced Batt SW 97.75 SF 0,00+ 1.55 - 8.58 32.02 192.11 51.INS VIS + Polyethylene vaporbanier SW 97.75 SF 0.00+ 0.39- 0.83 7.78 46.73 52. DRY 5/8 + 518" drywall - hnn& taped, floated, ready for paint W 472.50 SF 0.00+ 3.56 = 31.42 342.70 2,056.22 53. DRY 51UT + 518" drywall - hung & fine taped only SW 97.75 SF OAO+ 2.77 - 5.83 55.32 331.92 54.11+IPR CLK F + Caulldng - latex fire sealant PC 63.00LF 0.00+ 4.99= 7.84 64.44 386.65 required fin caulking to include short fimwall assembly 55. PNT SP + SmVprime (1 coat) then paint (I -coat) the walls W 472.50 SP 0.00+ 1.32 = 8.86 12652 759.08 Floor 56. CLN FINALR + Final, cleaning - construction - Residential F 230.00 SF 0.00+ 0.38 = 0.00 17.48 104.98 57. LTT AV R. Detach & Reset Light fmmm I LOO EA 76.50 0.00+ 0.00 = 0.00 15.30 91.80 SHORII,INE-PLACE 1/16/2024 Page:6 15 PILLAR Pillar Construction CONSTAUCTIOM 8401 73rd Ave #46 Brooklyn Park, MN 55428 MN LIC# BC713625 EIN# - 81-2822256 CONTINUED - Unit 7 Garage CAT SEL ACT DESCRIPTION CALC QTY RESET REMOVE REPLACE Total= Unit 7 Garage Missing Wall - Goes to Floor CAT $EL CALC Contents Unit 10 Garage 472.50 SF Walls 702.50 SF Walls & Ceiling 25.56 SY Flooring 170.00 SF Long WWI 63.00 LF Ceil. Perimeter 9'X71 TAX OBkP TOTAL 129.74 IM2.20 9".16 LaWaH 201 I 111 611 X 81 611 230.00 SF Ceiling 230.00 SF Floor 54.00 LF Floor Perimeter 97.75 SF Short Wall Opens into Exterior ACT DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 58. CON LAB + Content Manipulation charge - per hour 2*3*2 120OHR O.OD+ 58.73 = 0.00 140.96 845.72 Estimated. This is 2 guys for 3 hours to move :from the garage to an onsite storage pod. They to move them back in after the Completion of the repairs. 59. CON STOPC + Job -site cargo/stmage container - 20' long (per month) 2 2.00 MO 0.00+ 119.00 = 0.00 47.60 285.60 60. CON STOPMD + Job -site moving cortakm - pick np/del. (ea. way) 121-20' Cang 2 2.0013A 0.00+ 80.00 = 0.00 32.00 19100 61. INS BT12 + Batt insulation -12" - R38 - unfaced ban C*.75 172.50 SF 0.00+ 2.20 - 21.91 80.28 481.69 There is an a = of blown in that needs to be redone. The ceiling assemblies are a bit odd, so this amount may need to be supplemented after done by an insulation company as we will have a permit on this. 61 INS V1S + Polyethylene vapor barrier C*.75 172.50 SF 0.00+ 039 - 1.47 13.76 82.51 63. INS 13120 + Blown -in insnlado`t - 2o" dcp& - R50 C*.25 57.50 SF 0.00+ 2.45 = 9.12 30.00 180.00 64. INS VIS + Polyethylene vapor barrier C*.7.5 57.50 SF 0.00+ 0.39= OA9 4.58 27.50 65. DOR OHIO R Detach & Reset Overhead door & hardware - IV x 71 1 LOD EA 464-30 0.00+ O.OD - 0.00 92.90 551AO SHORELINE -PLACE 1/16/2024 Page:7 PILLAR Pillar Construction ooWsieve:au 840173rd Ave #46 Brooklyn Park, MN 55429 MN LIC# BC713625 EM - 81-2822256 CONTEwED - Unit IO Garage CAT SEL ACT DIESCRIMON CALC QTY RESET REMOVE REPLACE TAX O&P TOTAL 66. DOR OHORS + Overhead (garage) door opener -'Detach & rest I 1.001'sA OAO+ 278.70 = 0.00 55.74 334,44 67. DRY 518 + 5/8" drywall - hung, taped, float4 ready for paint C 230.00 SF 0.00+ 3.56 = 15.29 166.82 1,000.9I 68. DRY 5/8FT + 518" drywall - hung & fire taped only C 230.00 SF 0.00+ 2.77 = 13.73 130.16 780.99 The city may require double drywall on the fire assemblies. The second layer is an open item pending walk through with the city inspector, 69. PNT SP + Seallprime (I coat) then paint (1 coat) the ceiling C 230.00 SF 0 O0+ 132 - 4.31 61.58 369A9 Garages were painted wails and ceilings froar the photos i seen walls 70. FNC SH12 R Detach & Reset Shelving -12" - yin place 24 24.00 LF 11.30 0.00+ 0,00 = 0.06 54.26 325.52 71. INS BT6+ + Batt insulation - 6" - R21- unfaced haft SW 97.75 SF 0.003- 1.55 - 8.58 32.02 192.11 72. INS VIS + Polyethylene vapor barrier SW 97.75SF 0"1- 0.39 = 0.33 7.78 46.73 73. DRY 5/8 + 518" drywall - hung. taped, floated, ready for paint W 472.50 SF 0.00+ 3.56 = 31.42 342.70 2,056.22 74. DRY 5/8FT + 5/8" drywall - hung & fue taped only SW 97.75 SF 0.00t- 2.77= 5.93 55.32 331.92 75. WM CLKF -F Caullong - latex fire sealant PC 63.00LF 0.00+ 4.99= 7.94 64.44 396.65 required fire mWkb%. to include short fimwall assembly 76. PNl' SP + Sealolme (I coat) then paint (1 coat) the walls W 472.50 SF 0.00+ 1.32 - 9.86 126.52 759.08 Floor 77. CLN FINALR + Final cleaning - construction - Residential F 230.00 SF 0.004- 0.38 = 0.00 17.48 104.88 78. LIT AV R Detach & Reset Light fixture 1 1 .00 EA 76.50 0,004- 0.00 - 0.00 1,5.30 91.80 Totals: Unit 10 Garage 129.74 1,57 ae 9,433.16 Videolfnk SHORELINE -PLACE 1/16/2024 Page: a PILLAR Pillar Construction CONi4NUC910N 8401 73rd Ave #46 Brooklyn Parr, MN 55428 MN LICI# BC713625 MN# - 81-2822256 CAT SEL ACT DESCRIMON CALC QTY RESET REMOVE REPLACE TAX O&P TOTAL_ fi"://app.co-gMcamcomlgallcri=79mKoCbP Totals. VkleOUak DA0 0.00 0.00 Line Item Totals: SHORE 71ytr. DL.sCE 430.20 5,207.84 31,246.75 Grand Total Areas: 1,775.17 SF Walls 774.56 SF Ceiling 2,549.73 SF Walls and Ceiling 774.56 SF Floor 86.06 SY Flooring 206.67 ILF Floor Perimeter 672.13 SF Long Wall 325.96 SP Short Wall 233.67 LF Ceil. perimeter 0.00 Floor Area 0.00 Total Area 0.00 Interior Walt Area 0.00 Exterior Wall Area 0.00 Exterior Perimeter of Walls 0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length 0.00 Total Ridge Length 0.00 Total Hip Length SHORELM-PLACE 1/16/2024 Page; 9 PILLAR Pillar Conatructlon COSISTRYCiJavi 8401 73rd Ave #46 Brooklyn Park, MN 55428 MN LIC# BC713625 EJ N# - 81-2822256 Summary Line Item Total 25,608.71 Mad Sales Tax Reimb 430.20 Subtotal 26,039,91 Overhead 2,603.92 Profit 2,603.92 Replacement Cast Value $31,246.75 Net Claim $31,246.75 Leon Olmschenk SHORELINE -PLACE 1/I6/2024 Page:10 PILLAR Pillar Construction ;eHnzeuCTION 840173rd Ave #46 Brooklyn Park, MN 55428 MN LIC# BC713625 FIAT# - 81-2822256 Recap by Category O&P Items Total CLEANING 355.97 CONTENT MANIPULATION 3,348.29 GENERAL DEMOLITION 355.86 DOORS 2,229.60 DRYWALL 11,017.80 FINISH CARPENTRY / TRIMWORK 1,04252 INSULATION 2,75234 LIGHT FIXTURES 22950 MOISTURE PROTECTION 946AS PAINTING 3,37059 O&P Items Subtotal 25,608.71 Matt Sales Tax Reimb 430.20 -Overhead 2,60392 Profit 2,603.92 Tom 31,24&75 1.14°% 10.59% 1.14°% 7.14% 35.26% 3.34% 8.81% 0.73% 3.03°% 10.79% 91.96% 1.38°% &33°% 8.33% 110.00°% SHORLLINB PLACE 1/16/2024 Page: 11 Payment Confirmation Payer Information: Payment Made By: Payment Made For: Email: Permit Address: Address: Payment Description: Payment Date: Leon Olmschenk Joe Graves Joe@pillarr,onstructionmn.com 4000 Shoreline Drive 8401 73rd Ave N #46 Brooklyn Park, MN 55443 Permits 1 /24/2024 9:23:23 AM Business Name Payment Payment Confirmation Convenience Method Account Number Amount Fee Total City of Spring VISA ****9644 61528660 $1,005.62 $29.67 $1,035.29 Park (Permits) This notice confirms that the above payment was successfully submitted to our payment processor, PSN, and is currently being processed. Thank you for using PSN. NOTE: While credit and debit cards generally are immediately approved, the transaction is not considered "paid" until the credit or debit card company has "settled" the payment which occurs most often within 24 hours. If there are any issues with your payment, PSN will send an email to the address you provided. If you would like to check the progress of this payment, Jog into your profs a and select the Payment History option. Contact Us PSN Customer Support Submit your question and get a response within one business day. Payment Processing Powered by Payment Service Network (PSN) THIS COMMUNICATION IS INTENDED ONLY FOR THE ADDRESSEE(S) AND MAY CONTAIN INFORMATION THAT IS PRIVILEGED AND CONFIDENTIAL. YOU ARE HEREBY NOTIFIED THAT, IF YOU ARE NOT AN INTENDED RECIPIENT LISTED ABOVE, OR AN AUTHORIZED EMPLOYEE, OR AGENT OF AN ADDRESSEE OF THIS COMMUNICATION RESPONSIBLE FOR DELIVERING E-MAIL MESSAGES TO AN INTENDED RECIPIENT, ANY DISSEMINATION, DISTRIBUTION, OR REPRODUCTION OF THIS COMMUNICATION (INCLUDING ANYATTACHMENTS HERETO) IS STRICTLY PROHIBITED. IF YOU HAVE RECEIVED THIS COMMUNICATION IN ERROR, PLEASE NOTIFY US IMMEDIATELY BYA REPLY E-MAILADDRESSED TO THE SENDER AND PERMANENTLY DELETE THE ORIGINAL E-MAIL COMMUNICATION AND ANY ATTACHMENTS FROM ALL STORAGE DEVICES WITHOUT MAKING OR OTHERWISE RETAINING A COPY. RECEIPT City of Spiring Park 4349 Warren Ave, Spring Park, MN 55384 (952) 471-9051 24SP-00003 a Repair/Remodel/Altemdon (Commerdal) Payment Amount: $1,005.62 Transaction Method Payer Credit Card Joe Graves Comments Assessed Fee Items SPRING PARK On Gobs 91finnetonfg Receipt Number. 261 January 24, 2024 Cashier Reference Number Jamie Hoffman 61528660 Fee items being paid by this payment Assessed Fee Item On Account Code Assessed Amount Paid Balance Due 01/17/24 State Surcharge $15.62 $15.62 $0.00 01/17/24 Commercial Building Permit $600.00 $600.00 $0.00 01/17/24 Commercial Plan Review Application Info Property Address 4000 SHORELINE DR SPRING PARK, MN 55394 Description of Work remodel from water damage Property Owner SHORELINE PLACE OWNERS ASSOC $390.00 $390.00 $0.00 Took- $1,005.62 $1,005.62 Previous Paymerrts $0.00 Remaining Balance Due $0.00 Property Owner Addme Valuation 5 Shoreline Place $31,246.00 Spring Park, MN 55384