Loading...
5/20/2024 - City Council - Work Session - Agendas CITY OF SPRING PARK WORK SESSION AGENDA MAY 20, 2024 – 5:30 PM SPRING PARK CITY HALL (Work Session discussion times are approximate) 1. 5:30: Warren Ave Project Plans 2. 6:10: Discuss Vacant Planning Commission Appointment Process 3. 6:15: Fire Commission Update 4. 6:20 Miscellaneous 5. 6:30: Adjourn VICINITY MAPFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Cover.dwg CITY OF SPRING PARK, MNMILL AND OVERLAY & DRAINAGE IMPROVEMENTS2024 STREET IMPROVEMENTSPRELIMINARYmooreConsulting Engineering ● Land Surveyingwww.mooreengineeringinc.comengineering, inc.Table of contentsRev #Rev DateSheet NumberSheet TitleGENERALG-001COVERCIVILC-001CIVIL LEGENDC-002GENERAL NOTESPROJECT LAYOUTSC-101PROJECT LAYOUTC-102PROJECT LAYOUTC-103PROJECT LAYOUTDETAILSC-201ROADWAY DETAILSC-202EROSION CONTROL DETAILSREMOVALSC-301KINGS ROAD REMOVALSC-302WARREN AVE REMOVALS 0+00-6+00C-303CITY HALL REMOVALSC-304WARREN AVE REMOVALS 6+00-12+00ROADWAYC-501KINGS ROADC-502WARREN AVE 0+00- 3+50C-503WARREN AVE 3+50-7+00C-504WARREN AVE 7+00-10+50C-505WARREN AVE 10+50-12+00C-506CITY HALL 23671CEBHJWMJCRBGRPRELIMINARYPROJECT No.DATE:RECORD:REV DATE:REV NUM:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreC-001FILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Cover.dwg 05.16.2024----CIVIL 2024 STREET IMPROVEMENTS MILL AND OVERLAY & DRAINAGE IMPROVEMENTS CITY OF SPRING PARK, MN CIVIL LEGEND------------S.C.E.CIVIL LEGEND 23671CEBHJWMJCRBGRPRELIMINARYPROJECT No.DATE:RECORD:REV DATE:REV NUM:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreC-002FILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Cover.dwg 05.16.2024----CIVIL 2024 STREET IMPROVEMENTS MILL AND OVERLAY & DRAINAGE IMPROVEMENTS CITY OF SPRING PARK, MN GENERAL NOTES------------ PROJECT No.DATE:RECORD:REV DATE:REV NUM:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.moorePRELIMINARYFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Details.dwg 23671CEBHJWMJCRBGRC-20105.16.2024DETAILS 2024 STREET IMPROVEMENTS MILL AND OVERLAY & DRAINAGE IMPROVEMENTS CITY OF SPRING PARK, MN ROADWAY DETAILS------------ TYPICAL CURB REPLACEMENTNO SCALEXXTH AVE. ST: 0+00-0+00INLET PROTECTION-CURB BAGNO SCALE MUNI-312500-2 06.21.18CONCRETE TRUCKWASHOUT AREACONCRETE WASHOUT AREANO SCALEMUNI-312500-3 06.21.18CONCRETE VALLEY GUTTERNO SCALEMUNI-321313-9 02.25.20SEDIMENTATION CONTROL WATTLE - BARRIER/PERIMETERNO SCALE EPSC-IN-4.2 10.30.19PROJECT No.DATE:RECORD:REV DATE:REV NUM:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.moorePRELIMINARYFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Details.dwg C-20205.16.2024----DETAILS 2024 STREET IMPROVEMENTS MILL AND OVERLAY & DRAINAGE IMPROVEMENTS CITY OF SPRING PARK, MN EROSION CONTROL DETAILS------------23671CEBHJWMJCRBGR PROJECT No.DATE:RECORD:REV DATE:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Removals.dwg REV NUM:PRELIMINARYNWESScale in Feet03023671CEBHJWMJCRBGRC-30105.16.2024----REMOVALS 2024 STREET IMPROVEMENTS MILL AND OVERLAY & DRAINAGE IMPROVEMENTS CITY OF SPRING PARK, MN KINGS ROAD REMOVALS 0+00-4+00------------ PROJECT No.DATE:RECORD:REV DATE:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Removals.dwg REV NUM:PRELIMINARYNWESScale in Feet030NWESScale in Feet03023671CEBHJWMJCRBGRC-30205.16.2024----REMOVALS 2024 STREET IMPROVEMENTS MILL AND OVERLAY & DRAINAGE IMPROVEMENTS CITY OF SPRING PARK, MN WARREN AVE REMOVALS 0+00-6+00------------ PROJECT No.DATE:RECORD:REV DATE:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Removals.dwg REV NUM:PRELIMINARYNWESScale in Feet030N W E SScale in Feet03023671CEBHJWMJCRBGRC-30305.16.2024----REMOVALS 2024 STREET IMPROVEMENTS MILL AND OVERLAY & DRAINAGE IMPROVEMENTS CITY OF SPRING PARK, MN WARREN AVE REMOVALS 6+00-12+00------------ 23671CEBHJWMJCRBGRPRELIMINARYPROJECT No.DATE:RECORD:REV DATE:REV NUM:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreC-304FILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Removals.dwg NWESScale in Feet03005.16.2024----REMOVALS 2024 STREET IMPROVEMENTS MILL AND OVERLAY & DRAINAGE IMPROVEMENTS CITY OF SPRING PARK, MN CITY HALL REMOVALS------------ PROJECT No.DATE:RECORD:REV DATE:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Roadway.dwg REV NUM:PRELIMINARYNWESScale in Feet03023671CEBHJWMJCRBGRC-50105.16.2024----ROADWAY 2024 STREET IMPROVEMENTS MILL AND OVERLAY & DRAINAGE IMPROVEMENTS CITY OF SPRING PARK, MN KINGS ROAD------------ PROJECT No.DATE:RECORD:REV DATE:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Roadway.dwg REV NUM:PRELIMINARYNWESScale in Feet03023671CEBHJWMJCRBGRC-50205.16.2024----ROADWAY 2024 STREET IMPROVEMENTS MILL AND OVERLAY & DRAINAGE IMPROVEMENTS CITY OF SPRING PARK, MN WARREN AVE 0+00- 3+50------------ PROJECT No.DATE:RECORD:REV DATE:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Roadway.dwg REV NUM:PRELIMINARYNWESScale in Feet03023671CEBHJWMJCRBGRC-50305.16.2024----ROADWAY 2024 STREET IMPROVEMENTS MILL AND OVERLAY & DRAINAGE IMPROVEMENTS CITY OF SPRING PARK, MN WARREN AVE 3+50-7+00------------ PROJECT No.DATE:RECORD:REV DATE:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Roadway.dwg REV NUM:PRELIMINARYN W E SScale in Feet03023671CEBHJWMJCRBGRC-50405.16.2024----ROADWAY 2024 STREET IMPROVEMENTS MILL AND OVERLAY & DRAINAGE IMPROVEMENTS CITY OF SPRING PARK, MN WARREN AVE 7+00-10+50------------ PROJECT No.DATE:RECORD:REV DATE:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Roadway.dwg REV NUM:PRELIMINARYN W E SScale in Feet03023671CEBHJWMJCRBGRC-50505.16.2024----ROADWAY 2024 STREET IMPROVEMENTS MILL AND OVERLAY & DRAINAGE IMPROVEMENTS CITY OF SPRING PARK, MN WARREN AVE 10+50-12+00------------ 23671CEBHJWMJCRBGRPRELIMINARYPROJECT No.DATE:RECORD:REV DATE:REV NUM:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreC-506FILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Roadway.dwg NWESScale in Feet03005.16.2024----ROADWAY 2024 STREET IMPROVEMENTS MILL AND OVERLAY & DRAINAGE IMPROVEMENTS CITY OF SPRING PARK, MN CITY HALL------------ Project #: 23671C Date Created: 05/16/2024 Engineer's Preliminary Opinion of Probable Cost UNIT QUANTITY UNIT PRICE TOTAL Base Bid 1.2021.501 Mobilization LS 1 $8,000.00 $8,000.00 2.2108.504 Geotextile Fabric SY 830 $2.00 $1,660.00 3.2211.507 Aggregate Base (CV) Class 5 CY 125 $60.00 $7,500.00 4.2501.503 12" RC Pipe Culvert Class III LF 58 $100.00 $5,800.00 5.2503.602 Connect To Existing Manholes EA 1 $500.00 $500.00 6.2506.502 Const Drainage Structure Design G EA 1 $5,000.00 $5,000.00 7.2531.503 Concrete Curb & Gutter Design B618 LF 1,047 $40.00 $41,880.00 8.2531.503 Concrete Curb & Gutter Design D412 LF 53 $40.00 $2,120.00 9.2531.504 6" Concrete Driveway Pavement SY 256 $160.00 $40,960.00 10.2531.604 7" Concrete Valley Gutter SY 130 $170.00 $22,100.00 11.2360.509 4" Type SP 9.5 Wearing Course Mixture (2B)TON 66 $100.00 $6,600.00 12.2573.601 Temporary Erosion Control LS 1 $2,500.00 $2,500.00 Construction Subtotal $144,620.00 Contingencies (8%)$11,569.60 TOTAL PROJECT COST $156,189.60 Spring Park Mill & Overlay Project Interlachen, Warren, & Kings Spring Park, MN BID ITEM NO. & DESCRIPTION Page 1 of 1