5/20/2024 - City Council - Work Session - Agendas
CITY OF SPRING PARK
WORK SESSION AGENDA
MAY 20, 2024 – 5:30 PM
SPRING PARK CITY HALL
(Work Session discussion times are approximate)
1. 5:30: Warren Ave Project Plans
2. 6:10: Discuss Vacant Planning Commission Appointment Process
3. 6:15: Fire Commission Update
4. 6:20 Miscellaneous
5. 6:30: Adjourn
VICINITY MAPFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Cover.dwg
CITY OF SPRING PARK, MNMILL AND OVERLAY & DRAINAGE IMPROVEMENTS2024 STREET IMPROVEMENTSPRELIMINARYmooreConsulting Engineering ● Land Surveyingwww.mooreengineeringinc.comengineering, inc.Table of contentsRev #Rev DateSheet NumberSheet TitleGENERALG-001COVERCIVILC-001CIVIL LEGENDC-002GENERAL NOTESPROJECT LAYOUTSC-101PROJECT LAYOUTC-102PROJECT LAYOUTC-103PROJECT LAYOUTDETAILSC-201ROADWAY DETAILSC-202EROSION CONTROL DETAILSREMOVALSC-301KINGS ROAD REMOVALSC-302WARREN AVE REMOVALS 0+00-6+00C-303CITY HALL REMOVALSC-304WARREN AVE REMOVALS 6+00-12+00ROADWAYC-501KINGS ROADC-502WARREN AVE 0+00- 3+50C-503WARREN AVE 3+50-7+00C-504WARREN AVE 7+00-10+50C-505WARREN AVE 10+50-12+00C-506CITY HALL
23671CEBHJWMJCRBGRPRELIMINARYPROJECT No.DATE:RECORD:REV DATE:REV NUM:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreC-001FILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Cover.dwg
05.16.2024----CIVIL
2024 STREET IMPROVEMENTS
MILL AND OVERLAY & DRAINAGE IMPROVEMENTS
CITY OF SPRING PARK, MN
CIVIL LEGEND------------S.C.E.CIVIL LEGEND
23671CEBHJWMJCRBGRPRELIMINARYPROJECT No.DATE:RECORD:REV DATE:REV NUM:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreC-002FILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Cover.dwg
05.16.2024----CIVIL
2024 STREET IMPROVEMENTS
MILL AND OVERLAY & DRAINAGE IMPROVEMENTS
CITY OF SPRING PARK, MN
GENERAL NOTES------------
PROJECT No.DATE:RECORD:REV DATE:REV NUM:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.moorePRELIMINARYFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Details.dwg
23671CEBHJWMJCRBGRC-20105.16.2024DETAILS
2024 STREET IMPROVEMENTS
MILL AND OVERLAY & DRAINAGE IMPROVEMENTS
CITY OF SPRING PARK, MN
ROADWAY DETAILS------------
TYPICAL CURB REPLACEMENTNO SCALEXXTH AVE. ST: 0+00-0+00INLET PROTECTION-CURB BAGNO SCALE MUNI-312500-2 06.21.18CONCRETE TRUCKWASHOUT AREACONCRETE WASHOUT AREANO SCALEMUNI-312500-3 06.21.18CONCRETE VALLEY GUTTERNO SCALEMUNI-321313-9 02.25.20SEDIMENTATION CONTROL WATTLE - BARRIER/PERIMETERNO SCALE EPSC-IN-4.2 10.30.19PROJECT No.DATE:RECORD:REV DATE:REV NUM:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.moorePRELIMINARYFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Details.dwg
C-20205.16.2024----DETAILS
2024 STREET IMPROVEMENTS
MILL AND OVERLAY & DRAINAGE IMPROVEMENTS
CITY OF SPRING PARK, MN
EROSION CONTROL DETAILS------------23671CEBHJWMJCRBGR
PROJECT No.DATE:RECORD:REV DATE:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Removals.dwg
REV NUM:PRELIMINARYNWESScale in Feet03023671CEBHJWMJCRBGRC-30105.16.2024----REMOVALS
2024 STREET IMPROVEMENTS
MILL AND OVERLAY & DRAINAGE IMPROVEMENTS
CITY OF SPRING PARK, MN
KINGS ROAD REMOVALS 0+00-4+00------------
PROJECT No.DATE:RECORD:REV DATE:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Removals.dwg
REV NUM:PRELIMINARYNWESScale in Feet030NWESScale in Feet03023671CEBHJWMJCRBGRC-30205.16.2024----REMOVALS
2024 STREET IMPROVEMENTS
MILL AND OVERLAY & DRAINAGE IMPROVEMENTS
CITY OF SPRING PARK, MN
WARREN AVE REMOVALS 0+00-6+00------------
PROJECT No.DATE:RECORD:REV DATE:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Removals.dwg
REV NUM:PRELIMINARYNWESScale in Feet030N
W E
SScale in Feet03023671CEBHJWMJCRBGRC-30305.16.2024----REMOVALS
2024 STREET IMPROVEMENTS
MILL AND OVERLAY & DRAINAGE IMPROVEMENTS
CITY OF SPRING PARK, MN
WARREN AVE REMOVALS 6+00-12+00------------
23671CEBHJWMJCRBGRPRELIMINARYPROJECT No.DATE:RECORD:REV DATE:REV NUM:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreC-304FILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Removals.dwg
NWESScale in Feet03005.16.2024----REMOVALS
2024 STREET IMPROVEMENTS
MILL AND OVERLAY & DRAINAGE IMPROVEMENTS
CITY OF SPRING PARK, MN
CITY HALL REMOVALS------------
PROJECT No.DATE:RECORD:REV DATE:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Roadway.dwg
REV NUM:PRELIMINARYNWESScale in Feet03023671CEBHJWMJCRBGRC-50105.16.2024----ROADWAY
2024 STREET IMPROVEMENTS
MILL AND OVERLAY & DRAINAGE IMPROVEMENTS
CITY OF SPRING PARK, MN
KINGS ROAD------------
PROJECT No.DATE:RECORD:REV DATE:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Roadway.dwg
REV NUM:PRELIMINARYNWESScale in Feet03023671CEBHJWMJCRBGRC-50205.16.2024----ROADWAY
2024 STREET IMPROVEMENTS
MILL AND OVERLAY & DRAINAGE IMPROVEMENTS
CITY OF SPRING PARK, MN
WARREN AVE 0+00- 3+50------------
PROJECT No.DATE:RECORD:REV DATE:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Roadway.dwg
REV NUM:PRELIMINARYNWESScale in Feet03023671CEBHJWMJCRBGRC-50305.16.2024----ROADWAY
2024 STREET IMPROVEMENTS
MILL AND OVERLAY & DRAINAGE IMPROVEMENTS
CITY OF SPRING PARK, MN
WARREN AVE 3+50-7+00------------
PROJECT No.DATE:RECORD:REV DATE:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Roadway.dwg
REV NUM:PRELIMINARYN
W
E
SScale in Feet03023671CEBHJWMJCRBGRC-50405.16.2024----ROADWAY
2024 STREET IMPROVEMENTS
MILL AND OVERLAY & DRAINAGE IMPROVEMENTS
CITY OF SPRING PARK, MN
WARREN AVE 7+00-10+50------------
PROJECT No.DATE:RECORD:REV DATE:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreFILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Roadway.dwg
REV NUM:PRELIMINARYN
W E
SScale in Feet03023671CEBHJWMJCRBGRC-50505.16.2024----ROADWAY
2024 STREET IMPROVEMENTS
MILL AND OVERLAY & DRAINAGE IMPROVEMENTS
CITY OF SPRING PARK, MN
WARREN AVE 10+50-12+00------------
23671CEBHJWMJCRBGRPRELIMINARYPROJECT No.DATE:RECORD:REV DATE:REV NUM:DRAFTER:REVIEWER:MANAGER:DESIGNER:engineering, inc.mooreC-506FILE LOCATION: R:\Projects\23000\23600\23671C\CIVIL\PRODUCTION\23671C_Roadway.dwg
NWESScale in Feet03005.16.2024----ROADWAY
2024 STREET IMPROVEMENTS
MILL AND OVERLAY & DRAINAGE IMPROVEMENTS
CITY OF SPRING PARK, MN
CITY HALL------------
Project #: 23671C
Date Created: 05/16/2024
Engineer's Preliminary Opinion of Probable Cost
UNIT QUANTITY UNIT PRICE TOTAL
Base Bid
1.2021.501 Mobilization LS 1 $8,000.00 $8,000.00
2.2108.504 Geotextile Fabric SY 830 $2.00 $1,660.00
3.2211.507 Aggregate Base (CV) Class 5 CY 125 $60.00 $7,500.00
4.2501.503 12" RC Pipe Culvert Class III LF 58 $100.00 $5,800.00
5.2503.602 Connect To Existing Manholes EA 1 $500.00 $500.00
6.2506.502 Const Drainage Structure Design G EA 1 $5,000.00 $5,000.00
7.2531.503 Concrete Curb & Gutter Design B618 LF 1,047 $40.00 $41,880.00
8.2531.503 Concrete Curb & Gutter Design D412 LF 53 $40.00 $2,120.00
9.2531.504 6" Concrete Driveway Pavement SY 256 $160.00 $40,960.00
10.2531.604 7" Concrete Valley Gutter SY 130 $170.00 $22,100.00
11.2360.509 4" Type SP 9.5 Wearing Course Mixture (2B)TON 66 $100.00 $6,600.00
12.2573.601 Temporary Erosion Control LS 1 $2,500.00 $2,500.00
Construction Subtotal $144,620.00
Contingencies (8%)$11,569.60
TOTAL PROJECT COST $156,189.60
Spring Park Mill & Overlay Project
Interlachen, Warren, & Kings
Spring Park, MN
BID ITEM NO. & DESCRIPTION
Page 1 of 1