Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permits - Permit# 24SP-00066 - 4310 Shoreline Drive - 9/6/2024
oar, City of Spring Park 4349 Warren Ave, Spring Park, MN 55384 PARK Date Issued: Expiration Date: Job Site Address: Category: Permit Type: Valuation: Phone:(952) 471-9051 Fax: (952) 471-9160 For Inspections: (952) 442-7520 Re -roof Commercial 24SP-00466 09/06/2024 J Property Owner: Arthur P & Patricia A Meisel 03/05/2025 I Mailing Address: 5501 Bartlett Blvd 4310 Shoreline Drive, Spring Park, MN 55384 Mound, MN 55364 Commercial Miscellaneous phone: (952) 836-5899 Re -roof (Commercial) aulmeisel $78,000.00 Email: a P @gmail.com Description of Work: Replace existing EPDM Subdivision: Parcel ID: Filing: Lot: Block: Total Sq Ft: Contractors: material with new EPDM ballasted roof material. Required Setbacks: Primary Intel Roofing (952) 239-4313 Actual Setbacks: Fee items Amount State Surcharge $ 39.00 Commercial Roof/Siding/Window/door $ 1,077.30 Commercial R/S/W/D Plan Review $ 700.25 Total Fees: $ 1,816.55 NOTICE Signature of Applicant/Date Building Department Signature/Date 09/06/2024 MUST BE POSTED ON JOB SITE INSPECTION CARD City of Spring Park SPRING PARK On fa4 %innetonkp 4349 Warren Ave, Spring Park, NIN 55384 POST TKS CARD Pl A SAFE CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTiLALL REQUIRED WSP£CTtONS ARE MADE AND 5143 ED OFF BYT14E APPROPRIATE AIfT}10RrrYAND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOSSITE. Re -roof APPLICATION NO.: 24SP-00066 TYPE: (Commercial) ISSUED DATE: 09/06/2024 EXPIRATION DATE: 03/05f2025 PROJECTADDRESS: 4310 Shoreline Drive, Spring Park, MN 55384 PARCEL NO.: OWNER: Arthur P & Patricia A Meisel CONTRACTOR: Intel Roofing CONTRACTOR PHONE: (952) 239- 313 DESCRIPTION OF WORK: Replace existing EPDM roofing material with new EPDM ballasted roof material. CONSTRUCTION TYPE: OCCUPANT LOAD: DATE INSPECTION INSP PASSED COMMENTS Underlayment/Insulado n DATE INSPECTION INSP PASSED COMMENTS Building Final Fire Approval: Date: Engineering Approval: PW Approval: Date: Other To request an inspection: (952) 442-7520 Date: Date: Page 1 of 1 Read all attached materials. Everyone performing work to which the code is applicable shall comply with the code. The field copy of these plans must be kept on -site and made available to inspector during all inspections. To schedule inspections call (952) 442-7520 Please have the permit number and street address ready at the time of the call. Plan Revisions All construction shall comply with the approved Ip ans. Plan revisions will not be reviewed in the field without prior approval from the Building Official. Submit all plan revisions to the Department of Building Safety for review, prior to their construction. NOTICE Plan review was done in accordance with the current Minnesota Building Code. Plan review does not waive any additional code compliance issues found on site. REFER TO APPROVAL LETTER FOR ADDITONAL COMMENTS AND REQUIREMENTS Reviewed for Code Compliance This review is limited to the submitted scope of work, is based upon the supposition that the plan accurately depicts the intended construction and end -use, that the necessary legal authority has been obtained to construct the project and work is subject to code compliance and field inspection during construction. BY: 7o?n Kmure Type of Construction: NIA Date: 7IM2024 Occupancy Classification: NIA IPermit 0: 24SP-OWS6 Code Edition: 2020 MN State Bldg. Code 4310 Shoreline Drive, Spring Park REVIEWED FOR CODE COMPLIANCE inteBRoofing I . Roof Preparation Detail. IL Remove ballast rock and store to be roused on new roof system. b. Tear off existing EPDM membrane to insulation and properly dispose of. 2. Insulation Detail. a. Install 2" polyisocyanurate (ISO) insulation board increasing R-Value by 12. b. Any wet or damaged insulation will be replaced with new insulation at a cost of $5.75 per sq. & 3. Membrane Detail. a. Install a 60 Mil. Ballast Ethylene Propylene Diene Monomer (EPDM). b. Unroll the EPDM membrane over the substrate so that it is wrinkle-frce, and the premarked lines are face up at the upper edge. 4. Seaming and Fastening Method. a. Apply existing ballast rock over field of roof. 5. Mechanically Fastened Roof System. 6. Roof Penetrations and Flashing Installation Detail. a. Flash all perimeters of the walls, curbs, cant, and vems with 60-mil uncured and boots where needed. 7. Metal Detail. a. Remove metal coping edge and reinstall metal coping at end of job. b. Install new metal coping edge in fivA of parapet wall. 8. Special details a. Permit is not included in price. b. Installed expansion joint to separate roof systems. Project Investment Obligations and Considerations: www.ints, X)ofing.com REVIEWED FOR CODE 4310 Shoreline Drive, Spring Park COMPLIANCE .i^ Project Name: Date: Jurisdictlon: ID: Applicant Phone: Jobsfte: Reviewed: 07/26/2024 City of Spring Park 24S P-00066 (952) 239-4313 4310 Shoreline Drive Approval Status: Constructlon Type: Applicant Name: Applicant Email: City of Spring Park 4349 Warren Ave Spring Park, MN 55384 Phone (952) 471-9051 Fax (952) 471-9160 Approved with Comments Intel Roofing - Colin Colin@intelroofing.com 2020 1300, Minnesota Building Code Administration; 2020 1305, Minnesota Building Code Building The plans and specifications, for the project named above, have been reviewed for substantial compliance with the current Minnesota State Building Code. This review is limited to the submitted scope of work; is based upon the supposition that the data on which the design is based are correct and that the necessary legal authority has been obtained to construct the project. Although every attempt has been made to identify code issues or concerns for proper and necessary change, the project designer(s), the building contractor(s) and the property owner(s) are ultimately responsible for providing complete code compliance and maintaining minimum construction standards for the safeguarding of life or limb, health, public welfare and property while constructing this project. Approval is based on the correction of all noted deficiencies and compliance with all items listed below. Any changes from these documents andior aaditional information shall be submitted to the Department of Building Safety for code compliance review and approval. Written response of approval must be on site prior to implementation of such changes. The following information is related to the submitted plans/scope or as general information regarding code compliance. Compliance with the stated requirements will be verified during the construction process. All work shall be inspected. It is the responsibility of the contractor/installer to contact the Department of Building Safety, when ready to schedule an inspection, at (952) 442-7520 during regular business hours. If you have any questions or concerns regarding this plan review, please contact me via telephone at (952) 442-7520 or email at codereview@mnspect.com. Tom Krause Plans Examiner tkrause@safebuilt.com 4310 Shoreline Drive Page 1 .♦^ City of Spring Park 4349 Warren Ave Spring Park, MN 55384 Phone (952) 471-9051 Fax (952) 471-9160 Plan S cific Items: Building: Approved with Comments - Tom Krause, tkrause@safebuitt.com PLANS DATED: No date PLAN SHEETS REVIEWED: No plans -Description of work SCOPE OF WORK: Replace existing EPDM ballasted roof membrane with new 60-mil EPDM roof membrane, installing 2" poly-iso insulation board, flash all perimeters of the walls, curbs, cant, and vents with 60-mil uncured and boots where needed. PLAN SPECIFIC ITEMS (to be completed during the construction process): • Access shall be provided to the roof by the contractor during all Inspections. Access shall be by an OSHA approved ladder or other approved means. Minnesota Building Code Items• 1. Roof Coverings shall be installed in accordance with the MN building code and the approved manufacturer's instructions such that the roof coverings shall serve to protect the building. (MBC 1503.1). All roof coverings and roof assemblies must comply with performance requirements (MBC 1504) and fire classification (MBC 1505) 2. Flashing: Flashing shall be installed in such a manner so as to prevent moisture entering the wall and roof. Flashing shall be installed at wall and roof intersections, at gutters, wherever there is a change in roof slope or direction, and around roof openings. Metal flashing shall be corrosion resistant with a thickness of not less than 0.019-inch galvanized steel (MBC 1503.2) 3. Co�lna: Parapet walls shall be properly coped with noncombustible, weatherproof materials of a width no less than the thickness of the parapet wall. (MBC 1503.3) 4. Roof ventilation: Intake and exhaust vents shall be provided in accordance with Section 1203.2 (MBC 1503.3) 5. Crickets and saddles: A cricket or saddles shall be installed on the ridge side of any chimney or penetration greater than 30" (MBC 1503.5) 6. Roof replacement shall include the removal of all existing layers of roof coverings down to the roof deck. (MBC 1511.3) Exception: Where existing roof assembly includes an ice barrier membrane that is adhered to the roof deck, the existing ice barrier membrane shall be permitted to remain in place and covered with an additional layer of ice barrier membrane. 7. R90recover. (MBC 1511.3.1) The installation of anew roof covering over an existing roof covering shall be permitted where any of the following occur: The new roof covering is installed in accordance with the manufacturer's instructions. Complete and separate roofing systems, such as standing -seam metal panel systems that are designed to transmit the roof loads directly to the buildings structural system and do not rely on the existing roof covering for support shall not require the removal of existing coverings. Metal pane!, metal shingle, and concrete and clay the roof coverings shall be permitted to be installed over existing wood shake roofs. The application of a new protective roof coating over and existing protective roof coating, metal roof panel, spray poly foam roof, built-up roof, modified roofing, thermoset and thermoplastic single -ply roofing shall be permitted without tear off of existing coverings. 4310 Shoreline Drive Page 2 .r' PARK 8. A roof recover shall not be permitted where any of the following conditions occur: City of Spring Park 4349 Warren Ave Spring Park, MN 55384 Phone (952) 471-9051 Fax (952) 471-9160 The existing roof or roof covering is water soaked or has deteriorated to the point where the existing roof or roof covering is not adequate as a base for additional roofing. - Where the existing roof covering is wood shake, slate, clay, cement, or asbestos-cementtile. Where the existing roof has two or more applications of any type of roof covering. 9. Reinstallation of materials. Existing vent flashing, metal edging, drain outlets, collars, and metal counterflashing shall not be reinstalled where rusted, damaged, or deteriorated. Flashings shall be reconstructed in accordance with the manufacturer's instructions (MBC 1511.5) 10. Minimum Slo e: (MBC 1511) Reroofing shall not be required to meet the minimum design slope requirement of one -quarter unit vertical in 12 units horizontal (2-percent slope) in Section 1507 for roofs that provide positive roof drainage if all of the following conditions are met: The minimum required roof slope is infeasible due to existing parapet heights, existing unalterable flashing that requires positive drainage, or other obstacle. • Existing structure is demonstrated through structural analysis to be capable of supporting ponding to the level of the secondary emergency drainage system or point of overflow. • A secondary (emergency) drainage system is installed Where the application of a new roof covering over wood shingle or shake roofs creates a combustible space, the entire existing surface shall be covered with gypsum board, or mineral fiber fastened in place. (MBC 1511.4) 11. Undedayment Shall be installed per Table 1507.1.1(1) & 1507.1.1(2) Roof Type: 1. (MBC 1507.12) (EPDM) Thermoset single -ply roof coverings shall comply with ASTM D4637, ASTMD 5019. Unless designed for water accumulation In accordance with section 1611.2. roof shall have a design slope of a minimum of 1/4 vertical unit in 12 units horizontal (2%) slope. (MBC 1507.12.1) Minnesota Enemy Code Items: 1. Insulation: Where the insulation is entirely above the deck} roof shall have a minimum of R-30 continuous insulation. Where two or more layers of continuous insulation board are used, the edge joints between each layer of continuous insulation boards shall be staggered. [BF] 1508.2 Material standards. Above -deck thermal insulation board shall comply with the standards in Table 1508.2.(MN Rule 1305) 4310 Shoreline Drive page 3 A,r.- PARK City of Spring Park 4349 Warren Ave Spring Park, MN 55384 Phone (952) 471-9051 Fax (952) 471-9160 2. Insulation requirements for roof replacement. (MBC) For roof replacement on an existing building where the insulation is entirely above the deck and where the roof slope is less than two units vertical in 12 units horizontal, the insulation shall conform to the energy conservation requirements specified in Table 5.5-6, Opaque Thermal Envelope Requirements. (R-30 ci) (2024 Minnesota Energy Code-ASHRAE 90.1-2019) Exception: Where the required R-value cannot be provided because of the thickness limitations that occur with the existing rooftop conditions, including heating, ventilation and air-conditioning equipment, low door or glazing heights, parapet heights, or proper roof flashing heights, the maximum thickness of insulation compatible with the available space and existing rooftop conditions shall be installed. GENERAL ITEMS: 1. Construction or work shall be inspected in accordance with the requirements of Minnesota Rule 1300.0210. 2. It is the responsibility of the contractor/installer to contact the Department of Building Safety, when ready to schedule an inspection, at (952) 442-7520 between the hours of 8:00 a.m, and 4:30 p.m., Monday through Friday. 3. The approved permit and all related plans and documentation shall be on site and available to the inspector at the time of inspection. 4. Failure to provide the required documentation to the inspector at the time of inspection may result in a cancelation of the inspection and additional inspection fees for the additional inspection(s). 5. The field inspector may identify additional code requirements during inspections. (Example of code requirement items that might be identified are fire sprinkler heads being obstructed by framing, beams, lighting, ceiling configurations, plumbing pipes, and mechanical system ductwork that will require review by the fire suppression plan reviewer. Additional work being completed that is not consistent with the project scope of work or the approved plans.) 6. Applicable Codes: 2020 Minnesota State Building Code, 2024 Minnesota State Energy Code 4310 Shoreline Drive Page 4 CITY OF SPRING PARK PAGE 1 BUILDING PERMIT 4349 Warren Avenue Spring Park, MN 55384 ❑ Handout Given RotdPhone: 952-471-9051 Fax: 952-471-9160 El Lead Handout Given /")~ -V 1 .7 -i -aon � S SITE ADDRESS:_ a V�� _ PID: 1) Was the home constructed before 19787 (YES ❑, continue with line 2, NO ❑ continue without completing EPA Section) 2) Will the work disturb zfi sq ft of interior painted surfaces or >_20 sq ft of exterior painted surfaces? (YES ❑ go to line 4, NO ❑ line 3) 3) Are there any windows being replaced? (YES ❑, go to line 4, NO ❑ continue without completing EPA Section) d) Has this home been Certified Lead Free? (YES ❑, you MUST Attach Certification Information, NO a complete line 5) a) EPA Contractor Certification Number. NAT - (applies to contractor only) PROPERTY OWNER: `-z !z i r tM ore e Sr_ t .--r % Contact Name: tZ it /Ili 6 (*NTRACTOR: f v C r`' n State: Contra r License No: Email: e ARCHITECT: I& State: Ismail: TYPE OF WORK: Commercial o Residential EST. VALUATION OF WORK $ , ©i `-00 Square feef.° 10,01)o Detailed Description of Work: L; U New Construction ❑ Change of Use a Finish Basement Remodel Addition Garage-Attached!Detach Email: � ► t�1��RDM�iSf�I Phone: _ (o1C1- 54,1!3-1%95 3- ame: Contact Name: ` - Deck Pool Retaining Wall n Porch Demolition Plumbing -provide detail an Page 2 Mechanical -provide detail on Page 2 u Re -Side ❑ Fence a Shed r Window'Door Repiacernent # being replaced gnerine of %b application by tin lepai property awns" or a licensed eankector. fitthe ouriar's representative, Is required and atMortns the Zoning Administrator or dsalgr:n e f3 and the Oflkls designee to enter upon the property to psrform needed Inapecttom. Entry may be Without prior notice, i hereby acknowle igs that I have read this applcation and state that ell information is Ma and ern to the oesl of my knowiedga. i further agree tiat all work psAomied wit be In accordance with approved plans, speclikatlons and conditla s and to ablda by as ordinances of the Wunk1pality M the laws of the Stets of Minnesota regardk,p actions taker. pusuanl to ode perm It I agree to pay all plan review fees O'va1 If I choose not to proceed with the work Permit a"b when work not commenced within 160 days hem dais of peenlL or If work Is suspendad• abandoned, or rat trupected for 180 days. Work beyond the scope of this pertnlL a work wlthan a pertnt a htapact)cn, It be subject to a penalty. _ Noise Ordinance In Effect DgLFRIDAY Before 7yrt°and after 10 P.M. WeekendsMotidaya before 7 a.m. and after 8 p.m. 540NATURE OF APPLICANT: ` 'r PRINTED NAME:u ,,,. N' c Al OCCUP. TYPE: CONST_ l VALUATION: $ Permit Fee: $ Dell • 30 Plan Review Fee: $ State Surcharge: $ Site Inspection Fee: $ S.E.C. Fee: $ Investigation Fee / Other Fee: $ Copy Charge ($.25 per8.5 x11 page) $ License Check ($5)/ Lead Check (S5) $ SUB -TOTAL $ I Plumbing Fee (from Page 2) $ Mechanical Fee (from Page 2) $ )ecial Conditions/Required Setbacks: Building Approval By: Printed Building Approval By: City Approval By Paid:Ig1 Date: Receipt No. DATE: - I / t This Is the signature of: Owner or IEi Owners R BLDG SPRINKLED Yes / No WAC Charge: $ Sewer & Water Hook -Up. $ Seiner & Water Disconnect: $ Water Meter. $ Muni SE/WA Fee: $ SAC Escrow. s2 4&5 Other. $ TOTAL DUE: $ Commercial plans win be submitted to the Met Council Environmental Svcs for SAC determination. Escrow payment will be required when permit Is issued. If after Met Council review no SAC is deternined, escrow will be refunded in full. DATE: ❑ License Verification ❑ Lead Verification - Checked By: DATE: est By: innteAoofing i. Roof Preparation Detail. a. Remove ballast rock and store to be reused on new roof system. b. Tear off existing EPDM membrane to insulation and properly dispose of. 2. Insulation Detail. a. Install 2" polyisocyanurate (ISO) insulation board increasing R-Value by 12. b. Any wet or damaged insulation will be replaced with new insulation at a cost of $5.75 per sq. ft. 3. Membrane Detail. a. Install a 60 Mil. Ballast Ethylene Propylene Diene Monomer (EPDM). b. Unroll the EPDM membrane over the substrate so that it is wrinkle -free, and the premarked lines are face up at the upper edge. 4. Seaming and Fastening Method. a. Apply existing ballast rock over field of roof. 5. Mechanically Fastened Roof System. 6. Roof Penetrations and Flashing Installation Detail. a. Flash all perimeters of the walls, curbs, cant, and vents with 60-mil uncured and boots where needed. 7. Metal Detail. a. Remove metal coping edge and reinstall metal coping at end of job. b. Install new metal coping edge in front of parapet wall. 8. Special details a. Permit is not included in price. b. Installed expansion joint to separate roof systems. Project Investment Obligations and Considerations: www.intelroofing.com RECEIPT City of Spring Park 4349 Warren Ave, Spring Park, MN 55384 (952)471-9051 24SP-00066 I Re -roof (Commercial) Payment Amount: Transaction Method Check Comments $1,816.55 Payer Intelligent Roofing SPRING, > O' s On Lake Minnetonka Receipt Number: 338 September 5, 2024 Cashier Reference Number Jamie Hoffman 5207 Assessed Fee Items Fee items being paid by this payment Assessed Fee Item Account Code Assessed Amount Paid Balance Due 07/26/24 State Surcharge $39.00 $39.00 $0.00 07/26/24 Commercial R/S/W/D Plan Review $700.25 $700.25 $0,00 07/26/24 Commercial Roof/Siding/Window/Door $1,077.30 $1,077.30 $0,00 Totals. $1,816.55 $1,816.55 Application Info Property Address 4310 Shoreline Drive Spring Park, MN 55384 Description of Work Previous Payments $0.00 Remaining Balance Due $0.00 Property Owner Property Owner Address Valuation Arthur P 8 Patricia A Meisel 5501 Bartlett Blvd $78,000.00 Mound, MN 55364 Replace existing EPDM roofing material with new EPDM ballasted roof material.