Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit and Inspection Requirements - Permit# 24SP-00018 - 3990 Sunset Drive - 8/21/2025
Jamie, Attached is the letter Derrick emailed Donald and Mike A. this morning. Thought you should see it. In our meeting last week with Donald and new potential contractor. We discussed the requirements and emailed attached to Donald. Let me know if you have questions. Tracy Reimann Safebuilt ________________________________ From: Derrick Wyman <dwyman@safebuilt.com> Sent: Thursday, August 21, 2025 7:04 AM To: canoeisland1940@gmail.com <canoeisland1940@gmail.com> Cc: mikelandon92@gmail.com <mikelandon92@gmail.com>; Tracy Reimann <treimann@safebuilt.com>; Mike Anderson <manderson@ci.spring-park.mn.us> Subject: 3990 Sunset Dr - 24SP-00018 August 21, 2025 Donald D Driggs 3990 Sunset Drive Spring Park, MN 55384 RE: 3990 Sunset Dr; Framing/Progress Inspection Dear Mr. Driggs: On August 14th, 2025, I conducted an inspection of the dwelling at 3990 Sunset Drive, Spring Park. The purpose of my inspection was to determine: (1) the amount of progress that has been made on your fire-restoration permit as you have not scheduled any of the required inspections since the permit was issued; (2) the extent of unpermitted additional remodeling, alterations and changes to the fire-restoration permit’s plan; (3) the extent of un-permitted plumbing work that has been performed; (4) the extent of un-permitted mechanical work that has been performed; (5) the extent of un-permitted electrical work that has been performed. Inspection Findings: 1. The framing repairs outlined by the engineer for the fire restoration are mostly if not entirely complete. 2. Many additional alterations occurred that were not outlined or approved with the fire restoration permit. Those items include but are not limited to: 1. Entire main level floor joists were replaced; not just the 6 joists outlined by the EOR. i. EOR calls out the use of joist hangers. No joist hangers were observed during inspection. 1. Steel header installed in main-level west-facing exterior wall. i. Size and span of steel I-beam has not been evaluated. ii. Point loads were created under each end of this new header where previously there were no point loads. 1. Those footing will have to be excavated to ensure a code-compliant depth and size. 2. Main-level west -facing wall was rebuilt. i. No wall bracing was proposed, reviewed, approved or inspected. 4. The floor plan has been modified from the Approved Plan. i. Modifications to the plan should start with the submittal of revised plans for review. 1. Upper level was extended over porch; not just 6 joists replaced as outlined by the EOR. i. Floor was extended over porch. 1. Additional floor load and roof load are now being transferred to the exterior footings for the porch and those footing will have to be excavated to ensure a code-compliant depth and size. 2. Joist size was not evaluated for spacing and span. ii. New walls were added 1. No wall bracing was provided, reviewed, or approved. 2. No wall bracing was inspected 3. Siding will need to be removed to inspect fasteners at wall bracing panels. iii. New roof framing 1. No upper-level roof framing is addressed by the EOR. 2. Collar ties are not installed to code. 3. Code-required rafter- ties have not been installed. 4. Rafters bear on inadequate (1) 1-3/4”x4” LVL header spanning 16’ or more. 2. Plumbing work has commenced without a permit or a licensed plumber. 3. Mechanical work has commenced without a permit or a bonded mechanical contractor. 4. Electrical work has commenced without a permit or a licensed electrician. MN Rules 1300.0120 Permits Subpart 1. Required. An owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert, or replace any gas, mechanical, electrical, plumbing system, or other equipment, the installation of which is regulated by the code; or cause any such work to be done, shall first make application to the building official and obtain the required permit. Moving Forward 1. Your project requires the following five permits: 1. Building Permit for Fire Restoration i. This permit is expired and will be un-expired when remaining required permits are issued. 1. Building Permit for Remodel/Alterations i. This permit will be for the additional work that is not part of the fire restoration. 1. Plumbing Permit 2. Mechanical Permit 3. Electrical Permit 1. You have only obtained the initial Fire Restoration Building Permit. To obtain the remaining four required permits: 1. Building Permit for Remodel/Alterations i. An Engineer, currently licensed in Minnesota, needs to conduct an on-site visit to view current conditions and construction methods. ii. A detailed plan needs to be submitted that addresses each section of floor, wall, and roof, each newly created point load, the load path, and footing condition, and should address wall bracing for all walls where new exterior sheathing was applied. iii. This Engineer should be available to, and conduct, inspections of the proposed work to ensure it aligns with the engineer’s plan. 1. Plumbing Permit i. A licensed plumber needs to apply for a plumbing permit. ii. Requested documentation needs to be provided. This may include a plumbing plan. 1. Mechanical Permit i. A bonded mechanical contractor needs to apply for a mechanical permit. 1. Electrical Permit i. A licensed electrician needs to apply for an electrical permit through the Minnesota Department of Labor and Industry. 3. All permits will be issued at the same time 1. The MN Department of Labor will process the Electrical Permit separately. 2. After applications for the three remaining permits have been received and all requested documentation for each permit has been submitted, reviewed and approved, all three permits will be issued. 4. ALL required inspections MUST take place prior to covering work. 1. Any work requiring inspection that has been covered, must be uncovered until applicable inspections have been completed and passed. 2. Read through all paperwork that comes with issued permits to familiarize yourself with the required inspections. Feel free to inquire about the requirements and expectations for any of your inspections prior to scheduling to become comfortable with when to call and schedule your inspections. Please note, building permits must be obtained prior to any work commencing, including demolition. Please feel free to contact me should you have any questions about the above requirements. We look forward to working with you. Regards, Derrick Wyman Regional Building Official office: 952.442.7520 | direct: 952.800.8714 235 First St. W. | Waconia, MN 55387 safebuilt.com <http://www.safebuilt.com/> Connect with Us on LinkedIn <http://www.linkedin.com/company/safebuilt> INTEGRITY | IMPROVEMENT | SERVICE | TEAMWORK | RESPECT 咚砼⃰尼髓⢌솲㪏숲硫�삏䲷틩ኳ�殭ŗ禁ȵӾ掄䉆ꑒ袀←䚍槵榸걙컰�댹拽ꧣ❗覊ځ㈦�鐯ᶎ麁ꏎ뇱討㬣쁸끊棳뭌ඳ꼁咂욠퍩閲�遏䕐ܪ漖謄蜣碏᪽㹟�뎹婸݃ᱥ뽏尅绘퓅伧珴ײַ枣ኃἌ퐺㣝ꨵ䭖㊛텕蕂ૅᨑ⍤歵盗䄖皰룸₼ﳿ拪뫙ﭽᚬ䓣쓲둉頷ℰ孼⳰廌둉肅刋㮡�Ճ〮昨胐⨁寧ྷ烬�칚�ʜ婝鼗社ₒ屎䚦ᐅᑇ閃嘪鷌蜣骅很ᑋ娭沱焹р먉㲃餞⡴ꑑ퉨襄ﺨ⏑蜟ﯪ滷豘䞆┒⪃튟쏡薇ś廿帪 쟫ﮒʉāꤣ⑀帯⢤㑷쉩鿏鱗全꧔ꤺ储鲶⯹㮮汉涶龎識륟�햇粽당峢묮䤡ֈ韠ᓅ掠푟枧牏馴쨑엛컔ꕾ�驥↊뼝㎬侧惣뚆橁홹煷꡵뮔腽톚粴峞⫗�㊷쾧昰棴鶱ꥴ룓㷓Ђﱔ霫�玵䮧ᘻ뿛윮ﹽ㧜�ꏑ�煡耥ᄘ䜡Ἆᰶ猥록腰⋛納䏧㡌߭ឤ尯䥰順斨덢먽卵ᮼ캜段쓗ೲ�舰�럛䍭柩瞰廯杷攽擒낱ⷖ닃꽗쭠췦冀셱捴煶熍⍔ᯪַ濵黭жЄꒌ앢鶂ꇹռ鱵恻绿鞒ꆅ咘鶩쮁귗贇쌊쳯㌙忴㼟豾㧽鉅骤鶠莡驞秄鈴 ၦ墦缸征階鸔䚣₌ꅀ旒镋ㆂ쮇ퟮ꾷灹㾔㩝ት芿婊漵괁缕鿏켧택睐⊫쌷熄鳣䂣쯘㔥ᱯᏬ쾌㼆솂疶隋ㅢ䝣熏졉靋䄨雋梵䳚곴뵕쮆셡摖ᄫ魺넸浢뫟탕重넭ቕ믙⯾欈뫃藵៳✐ⱅ�ȐⓉ䨛풺엃纸髭㧾ᙾ쯤䙣≾詵ႅીơᆲԍᶎⓍ娍硅掃惚黊籃쭂㺔䄽⺩萿䁈엂컝⦖圳꤆匫钲䋵层�冤ㄣ쳅폩蝅䝣㪏ꞻ꽗啚蠍沶Ӛ↜�ᩡ痻黸웘�谝ࠐ⩇䭥ᚕ瑷䓲㈏ኡꯐ䙣㺐슡Ṣ碐躗鲝懓৪惎ୣḠ梌蛃糮視傂㦡톁滶ﴐ簫�檶⊅彋⠏䤨챸 䖀將䖇ῴ⠱℀�充ۮ㏴摺熉뵠喫ኮﯷ䇯桀跾⠛喅ႋ캭㨝�萲㆟껗䵞뗜纀妝掱۩艺췛㦞瘹棴佳婘䋝먮�嶾웯�熸謹椴클�ꟓ�ၷ鿞恽쫠鳏茹쯺쎹ܓ綆㎙௵݆策跁믈쭥䗢ࢊ昏翑ꛋ拍沝ᨋ郌瀎ꥼ鱩禣�삄�㨊﹠鷑郄䣪斁뿨刞섛ᔈᩒ薌坐욊磓੩퇴⨣쇠粃活哪鯔鸐ꥴ∴瘪碴⋑駎뷂ᬑ㎫並뢌塾䌋㸾ײַꣳ脊ꑰ儂ཝ㷱ﱾ視䆞ꥹꞓ휐㮑భ⡱毐곕⪙媐억㲰ꮒ깗Ᏸన≃瑿쪾᭞ع᠍꘨尮肠ẏျ㲰猹✓偈传᳞뉙瓪밎쳣ਛ䃠똣ﱶ뇘팙 莧蒇庠ࠀ鯍ᔶꬋꕞᦊ삘抧㗌푺뀨༃檸쫥羢೦吙ྀꜹ虳�ⵈ䗄鶂鷏㇓쟑ꀧ궒ണ䬠᧩�볫ꉋ瘔킇躃걑�캈矁띨鶡䘺ᄓ라�砒뇖꙳᧴䶜퀬登걝Ԣ訊燁戁⁒뇓筝ꐾ韩䆓낀䐙馬ㄥሲ琪⼋ᴃ໎诅贖僃⭎㑡៱囑弬ᡡ�ⲓ鯍ㄶꬬ띚嵶磂쥡툋䲤蝱ᇊ�鏋䓬Ѭ謙儁晑Ȁሻ탤Ό뷊ຄ蕎光�縫뢜좨ㇰꃡ猑냅㭝煷䥹槴㣓ꏂँフ莫뺽圝☾萈ᔣ⮺ꉷ訽ʫꚇ샽࣯셒ꍎ䆷芗坖鎰뎹䃧䴍ۥ柾굈ꁚူ騤ާ㰍�ँૣ枭跞븠鵢【� 卩袦懁췿莃蕛ت裤傿䘉鎩ӗꭶ뵕�ᠳ龄䎜ᘱ堭ൢᬪ猁ﺉ믨ʙ䏚螣意䕋呏칪歘꽖�謅웊㝅猘쎃褱�蠩봆퓇』澁ﰕ猲❁㤠豄㿳쁅ണ禼뉙⎰宴啀灗欹ෞպ븛箪꺗�ײַ״鶮椢ꉒ롃謹耮�ྒ薆샘㯸祻⻩�᙭퇆靨婝四얭끄㒏ᆃ죥⎑焄⋣掠ຜ듭⟄䶢㪟ﱍ⊄趋ꠐ堁ﭴ儐邐ꡡ䐠홽馌脀覭뤏䎃ᛲ⊿䍶䠧뗃�뵲ป≗巪㨞⚲Ƅ锍ꊳꘉ籄ลﻈ䍧叀ﰈ⩂ﶸ믺앂凬ຖ鶘ὔતﲜ᱀묽⽷롞䂈瀷횚冮㨃뼁焳磜ퟡ嗪䕁뿸捨崽ﴽ壡⚓댊 愒Ƈ갖䢊졡힎䦬넓燸읣鞚粷勩⯱ሄ䄜㹢ͧ긏苺莛־쏋Ꜧ陌䒜昩耬䀱ᐅ剠稁퓦␚챌↜ਣ专Ꝗ搁睄礞諥蠕ꁍ煣鷜琺�圡遆選䋘흪㿦괘荑ꈆ些供㢞锉윅⯱蒴ᰫ픽〻郃ᬱ⥜㔰۶ⷱ϶銱྇ꀞ믓㠷栗舒奕섭⡱ѡ䗵☧䖾㏠蟀㛕ꡩ�꼹콜땒簣Әぽ裏ꛑ꾸Ժች왾孭㚷䥐ꋽ琰懤㋤뎹퍧砓됧蕶ᐋ㒄⛪㴨ꤔ赖⚃룍ᡘ鞤敋䨨夁⟢䚦ㆲ譿ᝏ蝠㬞㉛첐킄㷏䢱ꣾ㻬ᛑ뼂ઐⶸ眤䝱鉉溪ۓ꡶႕엏꒷ꀯ㴆鈛翎찕⾛瀤㪗跟崚蕼ྜྷ뱁⡘簐瞥줇윥ᎏ䃧譸蘟᳁㕙ȵ 걬䩋�䀀賆꠱タ驭䚔ﶟ쿧ঞ䬵蛣䨭ﹰ히䆯揹⦱☪㚱楘讒먘㲝鉹ڟퟶ靼�츂៸ۨ툌醎㺀띠蕢싃隷ᡭ⎍긖ぜ뫅꤄䛧寤돝䎡ﲂ熓䌄ᢅ흍燗⡤퀩觝ㅕ₎㐳玹Ӥ僝裠璟ȏꟽ宭ષ፝䜞Ὼ쌡╢攌ᥰ専斨ゴꈛ⳹皠碻ꋡ ∈諸䢴苁쫼ꈉዸ職앟ဈ렎멝요⫋ꡚ�ᤈ찄ꮇ⇫퇙诅尘䶘䜎斅逩꼷⟡⠶ꣴꓼ忮�뉓調Ⴊ藸ꁔ횳躭㔆璅룳舿앧쟭耂塶쓼䋓瘺ꟆἈ⟢蒒杋�豜釧ꄇᨾ㻇硽郘쌴蠔ᣢꋄ퍷꿠覝暫巠麿৷弒犹憥瑘Ȉ겏፝ 梖頄黌䬹Ạꑶ䓏寨鉜愱졁諤釗꺅ᱚᘰᦚꇾ흌耯ꇅ蝃쀄홑옃ⴄ퀺垈�Ḿ䉙蜣젩�蛨剎雿㊼း�⛂좣埢蝀鵏䠳霁읰闀轀䁂╃⪰⯺鞨࣡◜∦襹漻䵦癖ⷐ㤮�舐樰弘춧蹼익혹켇ㄋ났оோLJ茮╁㛋浑矱檌྆쌡루痸ۣ湣ৣ㓣߷䟚㱉�뚻િ࠶䋼瀪휕⥟벲େ뗕貫䦀留䑛�녭쵶캚䓱䟠訽鷘ꇓ㋵㱸쬕⦇�傲帄葢黅괹휱ᅫⲖﱚ౽跭꧕�ぬ䆇턓ꁪ᰿老㺐䚐玜䫰욂覠썆㖐췧릥拶ᖀ⚜桨ﳁჹ�☹罜岅幡彦えŌቊ䵸禧누钠р揔엇�彷滕냄�ᕄ雊襵畀 娸⯈㿺齰ʘ⓷➗纑ᜉ尯�똨닀줍ᄫӂ◩䒂ɼ蟶璏냞荡ⳝ큧㧈᳷爵墤뮌♐쇑⩌坴뢋쟟믞鰧肃ܮ쫧�詣혗쓦၊螔൮轺쿁ᢥ玄弄⦕퉙ᩐ쾏쥱ང퇩뚻�퀐ꤋ۠䵻⠪⎛薾蓓瑳⾆壏Ӽ┾굕俳溨ޅᠤ킍⼪Վ⯫뛀豞눀�⺮䜹뜐뱘䍋갅邺砃ᷛ뗛⭃蚂鼄癗ᅧ剅ᥱ䅎铼고韋茩־蚤Ỗ䕢곑伮潘甖堢贒ₖ联롚ꄶ䅵숷婟欶☎덝땪栞덢셰퓮ຏ䠅湘鐢耵烔ᆹ惣ヹ䦐젌ﴁ㺍抻�艘쑩ⵠᤣ䊶쏎뙪望뙡焓逇킱너갻䣂呫⪭ᭆ�讵눶ᘗ焻൯䥪흽ⱄ䆊⸐ ꀍ鐠ﱁ熄Û캄㔝⒵悍㌗�턕&뼡홽饌↸ᨖ樳뎔Ꚕ蹿鋔䔺빊ず砊ꈣሾꠣ�䒟ࠇ䋼꠪‽⣮讍普�莁↞欵ྉ煉硪鏡樦⋩桨൬쉣ੂၦꯅ멷밣쑓賠泣嘟㤿杔앂沴ዉ埃뵠廬诲己༚䲦֩쏋⋰耫ꤽ訡쓚်︠豖甉䵉ډⱁ懕�툠㠌低琢ﻠ酽ࡓ之殂㇜鎡朄牻嚛�꾍楓縪⑨䂅�葠책ᦁ䋃褔ᜀ儿�ⷼቤ뺝봜䎡ྵ쒞䜣炌觾ᠸ뗼蓸쀣퉶垧瘯ຊ툇⻢য়盻䮻薊凮乜갰窓մ흴䥹퉈㋙ᙧ틗ⓙὃ고岇둠̳呁ꊔ눡搀欔ஈ龸⭡炲⑊褦롏晈湿穴⍢䁸摸钀㇞䎻芴⿀ ʤ坮ᔧ鹤⊀ࢆ㹿ⷱ从ﱃᯄﹶ㞉ꋓ塙՚擅톃➽젱睻쉬賲Ẏ䤯ࣃ囸ᰑ逧쮅壈㧝澪�☠褂們䮬脛璼ᣇ虜׀쬕⎕藋�뀰�ᆨ㇊�䔅킇펏艀�嚀垘㋟딎ຈ飦봲軛懭崾ጄ�쌰찜ثꛁ롭硂ૄⰡ虋⺌䖿ገ�ᆄ챀ޜ觇읖ۋೃᕦ⌱ꞃ酎洂뽧缟쉃䍲魐㈻厀ᢩ뮖狡련�ඬ�䊳왗۸ୗᔌ豺褑ೋ䌣礬扺汞듛癥桌꧖ꇠ奼鐝䑉ᢢⓆ寞�믊捗ᕿℍ௰䂩갗[绡䴪ꀛଃധŁ꾆쒸넸很㸍�컽�驯⣋镨샃⸘⁆莑罊ὃ⃖惜柍뿶潁⡞繟邎䵚Ł囐墭娉謔쒚䌖飠じ ﵟꅐ蠂뿕䉄诌ঊ嫄蟥鰟↗稸냚䎡囁騭甶◿饝㋦䶺㔌菰쪒렰ᄾ흶쐰ᄥ䓞眴恑ꆄຈै넆撌泐掸捄꾈㚰엜䢚疈⛪쩥掺璉塕瓆巩⚞鶙툄묐�㍇㥱蒖沸囸㒯ច禯䡪溂䜪ꙵ搥偳劎諅偛�앶ʓ�궂ᨋꉏЕⅾ박崱駚䚝쉜琅赃屮泳㇌ᡴ䕻ᰚỴ蜆푮쏱ꯓᄃ䡸䉺䔞蕃딈⟕럚찧芎ꝃᶁ➣ۑ琖顁生畟씌♄펻ᓴڡ�쬮ꍀ㳨넸戈挫シ㌳瞽䐞벏靱ᳶ′Ⅶ鎕蟳돀ꕊ륲䐛萝薂㴆鰶Ẕ䄹Ꝑڢᝏ줇︎ဃ綗棴膍탏ꡝ껍猪Ӕ顏햇䭝趐 䪄퍶趆B�궶㬻愖˛⒔�迨샚֫揙慆ﰈ⩂袸쉺긆쮝磔䁦㪜䩹Ꚙᙋ渫迆䮉丌堷䠣說쿝嶯ᕕ졿턟⒁‘詅ꀴ턖椸ጀ䱂䆩␅兆䄨녩䃾氅䓣ꪄ⌕趉씉퍠鶙㌸過貑丨뷷矞�珚䍳緊쾳篚龯뗟﹖ꇤ榫䋖꤂쓔舆�酶塩뢊悤츰睡ᢻ䀆晧돸⍣᭭鰥杘鞘뜿쯌싪獀괁ᑿө瑺醉ṭ〕ꔧ㪜栌萕㵯췱ꮎ綖輼嚒䂰ꌄ縮鐗ḣ둚㯼哯෦璘⏨韰鱂ộꈥ粪赞Ԡ眺蜌髵핝묓봴蟖ҁ뼜맠ᙵ㫨쎣༦⦑ⰶ࠵鰢섩弍葀㇓庌�᰻ꗶ㘗僫鮟胡ఉᄉ랆糌魖ベ Ꮞ᮱釈潅鑻䎮尊�츃嬵韜뾥⽭�ٔ讯űㅕ⼃棉⁰忝뾥俦뚇Ꮺ࣠ꔗ坨珥憖劯쎩旽먲朖崎ᝊ带슜痵섂ꪊ⧖㽣횷熫쓣Ⴐ᤻ᯍ瘀巊Ր㰖鴇쒺᷏氾ᵁǁᶃؒ맥懗뤼臆䶸藢䠨뮁踘곡谂堖僮⠆홉쇒쨹腊裘滷牓鶱삼跆氷菈ᄶᩁ頁ꆯ垂᷶ઊ죫痫䷋딷㑐⎒ؚꯦ䬮䠽﹀ﻀ溇嬩쀛썥녘̰銄塁鶐褟袧雝⚝눋ᅽ쪴ꃶ铜匀뚃橜檅譭订섅蚺藪毛룭�뗇㱅㘪鐥᪲펏ᜫ⸅ᔐ徎㭭姓⥌렶깘ģ㓦ﭪ翟뷯︯藤⡶붜⨲�묆⢑ﭴ띭弭鋶㾯瞃颐獹捾 쌪휹ೈࣈ帄�韉蠘잕ᡣᲖΎ㟻⡫봥荫赊섧凷浼쁹ꭱ眶䄁斸ꀶἻ솹幉荹⎂垳訶ຶ穼䓪扥ꖚ绋ꪨ䎈듍⸮�箝쓶咂䒞Ʞ뙲戼껷㭛嚦ǡꗎᚈ碾羫㕸ᖠ鸎銚ㇵ䒽搅撢ほ겘钾쉲创�블羸뮿堤悮♾乔傉砹㸮鹮ﵡ皅붵鳭抎ㄩ吽㗒铄퍕ȫ胊觴䎸㆝㉪㈭㠷窺ۢ檞픖셣鴌쑈끏빭국ꉙ섊ႜ㷔໎딖鮖뱮⡎«겲嶔첛᪖ƕ呾퍮甩븪⣈Ჱҹ簪ػ廄讑븛ᚠ⮂䃕瑵υ꒗⌻鍦뱽⎯굗䩝桔妷끢㒈솖逕嚪뵜㢢칧农좧ℷ驫 ≊塣䌌日恕詀⇮辣具췜ὐ뷟勻蓤ꧣ踿鴤ㄥ爞鿩ꃨሊ怐娋쁫▕頥䒶ᬜ侀钿䉢ᜨ屴씛鶪檭ﺻ䉗ᒙ砟鲠閁蚘鷈肺景ꉘ뷅ᅬᣲ艜랅啡ᄅ輌橕聵퉒괊齠䈓鑄⟚൪耀绚呠Ꮿ⦅筆쀊솚泉⻝鐚땻줏끝鵭宱紹ԁ髰䙂쎀櫆ᬑ渏踛婙筨䀐㋬Ԧ㎥婢䅑⌌螝涒ꏨ涴磅鰞뽥䦒旈嘉ꈫ鳙묮⤦诐맬ཧ땕뱧ὀ단뽤圕粒༷扃➻走盳闪᷽앏ꮆ엤ẗꌑ罱ጭ炴侈扽匓跀쫰鏉൜銊⢊半㻢㗆�Ήꠉ盚⯷筅䏆갿⸎怖舦Ӥ핀凰ࡁ锏儶魾罳䳝䙾⺟쉌冏쒁祡⪌ 袲䠟ꍘ筍츖兲㛍홨ℾ騾䈠已몌ãﱠ払ム往㜭휖鈈ᇼ▆➩ᒟ釋�ꐶ꼓쐌듮啠폹잗厏ꕬ똇鶎뙧쳄成鹐ꩢꡟ芹洊⡗ꩾ鏭胓隞䟬郡눧䬩᠆謰�閘쓎놚鯢쁶潛쾥겕ꇵ螗낾ꕉ条銽銗翤똉ኂ㲼᥈ꯙ扥⨲Ꮊ腇됨靕ᕤ�锹볖儻䫡⬧牣쇓ဵቯ倲ⓗ弫䯷ꋵὰ㍝랫厏ﭷᾭዓ禇킫ᒴ⒡�㲋ଏ✰꩕ᔛ湡囑郪啷䘜魟쫶⇅崄䷌꒘븰˅쏼邩잵期삩菑騶⮹幛曙驞䅻䬰汃⣣部租蘒怭謫ᕊ軕㍫튡귇鋽簙쬩鎣囃饤䋉タ树襑帶쾈矟㳿闰瓊擄낢灟䷌ 뀙靫淼ᕎ⣸墼辩བ㕈糃ꡬ噝⿳➠伤芷纏덹麹굻沂长✭㍹圣ꩍ字뀝셳ꮺ떍어毀䉺⤎㭳䣜ꞅ었ﺘߓฏ澉勡㸥푟槦禴⥈Ǻ媨ࠗ瞸祿ロ鄻贲㆑룹᭚뚮棜懋ꬸ헜掽㡅뙪蘮꘧ﵛ䧈ꗀ를웊鮬䴱뿣⣗∰ꈪ䪥ㄘ䓵ⵊ䆶㠅縖�頡權ꑈ윁ᨱ@〲ꁇđ浃ゼ扨茠㑯먠۞弹罭隱挗븇㡎찧晿硪踾Ἅ깮⽴廎ᄩ鱱鵑推ꏩퟵ鐸録䐙鋭䁣䈸溥¹ᗿ帮燛淶흕ᥨ脁ꂱ㞏龏繿ᄌ繸荌ꮆፇ홽톿ﳊ笳껯ኖ丳�쫥골珉컧蓐粋ܘ觲毜녇㨒齥裋星퉆㈽뫵퉉 掎媃셁嚞룆薒륚ḻ縡檫貈秂货麆蛰�츆斳�絟뇴ꈄ䷳㰗趁ៅۊ⋵炊揼⻐仗谧깁땫油堪⧤Ⅺ骠嶉⅔ꐳ톁㋪䦲ὦ仒㊜៩묗��驪嗏삤ꢸ蓈ⱬ彛膘䴒⏗琞酷瀽᱙钝�촘鞖蜷㫹崼錤堎ẛ◳Ҵ砿ꂥ夕萙䍃强ľ㌞ퟸ匡ᨰ釄띺䣲뙚Ꝉ༦ᶘⷌ㍘텏㣇靇갷ኻﻵ塚嵵鐍媼묆簵뒖犆ꘒᓤ河뫱⡠栢䥏挧冐�咔掣㈯�훖胦糬빇鵭◔껷↹攦䅼ꆼ㖬ꎱ䝇큗ꉝ⨙쩎᳥ύ䝯�㞙拾ᑝ�羶햗㎡ᜩ쩈ᅳ驴ꯥఘ읟沽坝煅ᨙ뺒早륫菕滩ꏓ逨閲燵퐖넅 ヤ旝㊞㍝恑Ԟ褖覊⭪뿷╻ꀺ㳎햣ʞ⑽璌㢿ꗬ꿰黕�倩㥉䕚諾侧뱏⧎褰떊l姵ﭣʏ夓㐞婷翰ⵧ꙽䓏涁ꀩ䁀刢墼酝�ⳋ雖㑱槃쇛ਦⓀ혪䎵菢ࡒᡨ鑋珀眥卩髫㓍컮§駗⑊哙Ἇꂸ氯乞唯Ⲷ窄㧧隆㺯솽ꟕⓀ혪ڵ�刺惤፫㷝몦趤첶흜ꚜ睱Ըﻞ�漩琎ﺐେ憷挰뾇㓷腏呉熬ꐍꗵλ渌줗纔㠑棲휚ഴ쎽䀩죉◲何䔦겖맵⧃䴱諿恒ᔒ◫鿷鵎퀊⍓ﴳ▸苁৷缆�䴉ੰ䋘夐䴁躨⩓�ꈥ巻끪ᶺ顎響ꗫⓀ혪彋毴耴韐枝궾ꪄꓸ㟄온㻵 嫽¤葌塈嘌べꏪ縜郶眬諭酕Ś箉ር穩쮧腌呉晜躂꿸ဴ⽵謅扔ঐ꼼颕鶌ŏ縩宒ꋥ伲Ꭵ䯊墳莩瞌믾潎谿魾㐜©