Loading...
Permits - Permit# 25SP-00085 - 4601 Shoreline Drive - 11/18/2025I_rl I City of Spring Park I Re -roof (Commerciol) PARK 4349 Warren Ave, Spring Park, MN 55384 Phone:(952) 471-9051 Fax: (952) 471-9160 For Inspections: (952) 442-7520 25SP-00085 Date Issued: 11/18/2025 Property Owner: PHS/LAKE MINNETONKA LLC / ATTN Expiration Date: 05/17/2026 CFO Job Site Address: 4601 SHORELINE DRIVE, SPRING Mailing Address: 2845 HAMLINE AVE N PARK, MN 55384 Category: Commercial Miscellaneous ROSEVILLE, MN 55113 Permit Type: Re -roof (Commercial) Phone: (952) 471-0211 Valuation: $175,000.00 Email: Description of Work: Layover installation of new EPDM roof system by full adhesion method. see scope discription: Subdivision: Required Setbacks: Parcel ID: 1811723330061 Filing: Actual Setbacks: Lot: Block: Total Sq Ft: Contractors: Fee Items Amount Primary PINE CITY ROOFING LLC (612) 876-0173 State Surcharge $ 87.50 Building PINE CITY ROOFING LLC (612) 876-0173 Commercial Roof/Siding/Window/Door $ 1,804.50 Commercial R/S/W/D Plan Review $ 1,172.93 Total Fees: $ 3,064.93 NOTICE Signature of Applicant/Date Building Department Signature/Date 11/18/2025 MUST BE POSTED ON JOB SITE INSPECTION CARD *k=:Z City of Spring Park SPRING PARK OnGakf%innetonka 4349 Warren Ave, Spring Park, MN 55384 POST THIS CARD IN A SAFE CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE MADE AND SIGNED OFF BY THE APPROPRIATE AUTHORITY AND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOBSITE. Re -roof PERMIT NO.: 25SP-00085 PERMIT TYPE: (Commercial) ISSUED DATE: 11/18/2025 EXPIRATION DATE: 05/17/2026 1811723330 PROJECT ADDRESS: 4601 SHORELINE DRIVE, SPRING PARK, MN 55384 PARCEL NO.: 061 PHS/LAKE MINNETONKA LLC / ATTN OWNER: CFO OWNER PHONE: (952) 471-0211 CONTRACTOR: PINE CITY ROOFING LLC CONTRACTOR PHONE: (612) 876-0173 APPLICANT: Pine City Roofing - Sandy APPLICANT PHONE: (612) 876-0173 DESCRIPTION OF WORK: Layover installation of new EPDM roof system by full adhesion method. see scope discription: CONSTRUCTION TYPE: OCCUPANT LOAD: DATE DATE INSPECTION INSP PASSED COMMENTS INSPECTION INSP PASSED UnderlaymenUlnsulatio I I I Building Final n Fire Approval: Date: Engineering Approval: PW Approval: Date: Other To request an inspection: (952) 442-7520 Date: Date: COMMENTS Page 1 of 1 Read all attached materials. Everyone performing work to which the code is applicable shall comply with the code. The field copy of these plans must be kept on -site and made available to inspector during all inspections. To schedule inspections call (952) 442-7520 Please have the permit number and street address ready at the time of the call. Plan Revisions All construction shall comply with the approved plans. Plan revisions will not be reviewed in the field without prior approval from the Building Official. Submit all plan revisions to the Department of Building Safety for review, prior to their construction. NOTICE Plan review was done in accordance with the current Minnesota Building Code. Plan review does not waive any additional code compliance issues found on site. e EFER TO APPROVAL LETTER ADDITONAL COMMENTS AND REQUIREMENTS Reviewed for Code Compliance This review is limited to the submitted scope of work, is based upon the supposition that the plan accurately depicts the intended construction and end -use, that the necessary legal authority has been obtained to construct the project and work is subject to code compliance and field inspection during construction. By: Verrickil) man Type of Construction: V-B Date: 11/3/2025 Occupancy Classification: R-3 Permit #: 25SP-00085 Code Edition: 2020 MN Building Code Reviewed for Building Code Compliance RltL Commercial & Residentiai � Jotl 4op.q�.r ' 61i•SPSJ8�99KS T hWWAgD 61t6854495 ss.or p-necatyroofing@gmall.com Pine City Roofing LLC 3249 Bloomington Ave S. Minneapolis MN 55407 M- 612-685-4495 Bid/Contract Submitted To: Name: Gavin Hart North Lone Star Capital Address: Phone: 651-775-7781 Date: 9/24/2025 Total Roof Measure: ESTIMATE/CONTRACT Work to be performed at: Name: Parkshore Apartments Address: 4601 Shoreline Drive Spring Park, MN Pine City Roofing LLC - PM: Jose Rodriguez Total Cost of project: $175,000.00 Bid/Contract to include material, equipment, and labor to layover the existing roof and install a new fully adhered .60 Mil EPDM Black roofing system. The job will bid as follows: Scope of Work Pine City Roofing (PC) will provide material, equipment, and labor to install a new roofing system which includes the following actions: • PC to carefully remove perimeter coping wall metal for reuse. • Remove loose pebble for disposal. • PC will then mechanically/manually tear -off and remove existing roofing material from walls and properly dispose of debris. • PC to then inspect roof insulation and deck and prepare surface as needed. Shall Pine City find wet or rotting on the insulation or deck, it can be replaced at $60 per man-hour, plus the cost of materials. Permission will be requested, and pictures will be taken prior to work commencing. • PC will then mechanically install a %:" Fiberboard layer by use of metal plates and screws. Reviewed for Building Code Compliance Commercial c> & PFF[STIYIIf elp;ir Residential JJ..6 Ro dgusr OJECTY44GER 6 •'�"nir /2.685A898 ... .... 612-685- 495 .,. ,. .., pinecilyrooling@gmail.com • PC will then apply anew .60 Mil Black Ethylene Propylene Diene Monimer (EPDM) roofing membrane by full -adhesion method; which involves rolling industrial EPDM bonding agent using roof rolling pins and fully adhering the membrane to the insulation. For the detail work, PC will use reinforced 6" Seam Tape where sheets of membrane join (EPDM) to ensure there is a permanent seal. Likewise, all appropriate flashing up to any wall or HVAC surface will be done. All penetrations, vents and HVAC units will be flashed and sealed as well. Shall an HVAC unit need to be raised for flashing, Pine City can assist in lifting and lowering the unit. We only ask that a qualified technician take care of any needed connection/disconnection. • Finally, PC will re -install -the existing perimeter wall coping metal to the parapet walls to finish the job. • Clean-up of Construction Site: Pine City to provide dumpster service and clean-up entire roof area of all debris and clean grounds daily. Dumpster to be removed upon job completion. e Through core cuts, PC has found the average R value of the existing roof to be at about R30 and will bring it up to just under R32 by adding the fiberboard on top of the existing roof. • Upon full completion and payment of job, Pine City to offer a 10-Year Warranty on workmanship. We hope our bid approximates your project's needs and assure we work to the highest quality workmanship. Please give us a call to discuss any items which may not be meeting your project's parameters. We want to earn your trust and become your contracting partner. Price for Above Roofing Project (Re -Roof Project) $175,000.00 Down Payment $87,500.00 Due Upon Completion $Remainder Payment of any remaining balance by Buyer-owner/Client is due on completion of project. Signature OWNER/BUYER: Date Signature Pine City Roofing —Jose E. Rodriguez Reviewed for Date Building Code Compliance Commercial Application/Plan Review Submittal Checklist The following check list has been compiled to assist in expediting the commercial plan review and permit issuance process. Please take a moment to review these submittal requirements and to verify all of the necessary documentation prior to submitting your project. COMMERCIAL ADDITIONS, NEW CONSTRUCTION, REMODELS, ETC. ❑ Provide co pleted permit application including: Date ZSite Address riZ wner Owner Address Tcontractor elephone Number Information F escription of work being performed aluation of work being performed signature of applicant ❑ 2 (two) sets of SIGNED Architectural and Structural drawings are required on all commercial projects unless other arrangements or agreements between the submitting party and the building inspection department have been made. ❑ Submitted Plans will include, a Code Analysis Including: ❑ Which Code and Edition (i.e.: 2006 IBC, 2007 MSBC) ❑ Occupancy Classification ❑ Fire separation requirement (separated/non-separated) ❑ Fire Sprinkler system requirements ❑ Fire alarm system requirements ['Construction Type ❑ Allowable area [Proposed actual area ❑ Allowable height ❑ Proposed height ❑ Proposed area and height increases if applicable ❑ Occupant load ❑ Exiting requirements ❑ Plumbing Fixtures Requirements ❑ Provide project manual or; door hardware and window schedules, wall section and wall construction details ❑ Complete and Sign Special Inspections Worksheet (see attached) ❑ Complete and provide Minnesota Energy Code compliance forms (see attached) ❑ Building Envelope or ComCheck for building envelope; AND ❑ Lighting or ComCheck for lighting; OR ❑ Energy Cost Budget Method; OR ❑ Building Performance Rating Method ❑ Projects must comply with the Minnesota Accessibility Code including: ❑ Parking ❑ Accessible route ❑ Ramps ❑ Door width, swing and hardware ❑ Bathroom requirements ❑ Access between floors ❑ Countertop heights ❑ Provide site plan including parking lots, fire apparatus access roads/lane etc. ❑ Provide Utility and/or Civil plan including fire hydrant locations Reviewed for Building Code Compliance Structural Testing and Special Inspection Statement of Special Inspections Project Name: G t— C ak.4 r c— AeG -- rrsr +nA P-w- r Q G Location: '`i (a O l 5y, nix n c Za �n ry . ��-lcfir-; S'5-- 5S%-i Owner: S ILL. C- This Statement of Special Inspections is submitted as a condition for permit issuance in accordance with the Special Inspection and Structural Testing requirements of the 2006 International Building Code as adopted by the current Minnesota State Building Code. It includes a schedule of Special Inspection services applicable to this project and the identity of agencies to be retained for conducting these inspections and tests. This Statement of Special Inspections encompasses the following disciplines: ❑ Structural ❑ Architectural ❑ Other: The Special Inspector shall keep records of all inspections and shall furnish inspection reports to the Building Official, the Architect and Structural Engineer of Record. Discrepancies shall be brought to the immediate attention of the Contractor for correction. If such discrepancies are not corrected, the discrepancies shall be brought to the attention of the Building Official, the Architect and SER. The Special Inspection program does not relieve the Contractor of his or her responsibilities. Interim reports shall be submitted to the Building Official the Architect and SER. A Final Report of Special Inspections documenting completion of all required Special Inspections, testing and correction of any discrepancies noted in the inspections shall be submitted prior to issuance of a Certificate of Use and Occupancy. ACKNOWLEDGEMENTS Each appropriate representative shall sign below: Owner: Firm: Date: Contract • �• Firm: &4, A':�* �a&R ^c U.G Date: / D Architect Firm: J Date: _ SER: SI S: SIT: TA: F: Firm: Firm: Firm: Finn: Firm: Date: Date: Date: Date: Date: If requested by engineer/architect of record or building official, the individual names of all prospective special inspectors and the work they intend to observe shall be identified. Legend: SER = Structural Engineer of Record SI-S = Special Inspector - Structural Accepted for the Building Department By SI-T = Special Inspector- Technical F = Fabricator _ Date _ TA = Testing Agency Reviewed for Building Code Compliance Commercial Application/Plan Review Submittal Checklist Changes to original Submittal Documents: 1. Any changes or addendums to the original submittal documents must be submitted to the Building Inspections Department for review prior to proceeding with the proposed changes. 2. Changes may be indicated by a single sheet with a clouded area showing the proposed changes to the particular sheet or area. 3. Full plans may be submitted if there are changes or corrections to multiple sheets. Once again, the changes to the original should be indicated by clouded areas. 4. If a full set of plans is resubmitted without indication of the changes to the original, a complete plan review will be performed and another full plan review charge will be assessed. 5. 2 (two) sets of the changes should be submitted. Reviewed for Building Code Compliance Structural Testing and Special Inspection Program Summary Schedule Project Name tom' -V- S�n DMe-A 'k M c f, } �C —�ofr_r Project No. Location t (O n I S h IQ a Jo �1 Permit No. (1) Notes: This schedule shall be filled out and included in the Structural Testing and Special Inspection Program. (1) Permit No. to be provided by the Building Official. (2) Referenced to the specific technical scope section in the program. (3) Use descriptions per IBC Section 1704, as adopted by Minnesota State Building Code. (4) Special Inspector - Technical, Special Inspector — Structural, Testing Agency. (5) Weekly, monthly, per testfinspection, per floor, etc. (6) Firm contracted to perform services. Reviewed for Building Code Compliance A,.. ING PARK Project Name: Date: Jurisdiction: ID: Applicant Phone: Jobsite: Code: Reviewed: 11 /03/2025 City of Spring Park 25SP-00085 (612) 876-0173 4601 SHORELINE DRIVE City of Spring Park 4349 Warren Ave Spring Park, MN 55384 Phone (952) 471-9051 Fax (952) 471-9160 Approval Status: Approved with Comments Construction Type: Applicant Name: Pine City Roofing - Sandy Applicant Email: pinecityroofing@gmail.com 2020 1300, Minnesota Building Code Administration; 2020 1305, Minnesota Building Code Building The plans and specifications, for the project named above, have been reviewed for substantial compliance with the current Minnesota State Building Code. This review is limited to the submitted scope of work; is based upon the supposition that the data on which the design is based are correct and that the necessary legal authority has been obtained to construct the project. Although every attempt has been made to identify code issues or concerns for proper and necessary change, the project designer(s), the building contractor(s) and the property owner(s) are ultimately responsible for providing complete code compliance and maintaining minimum construction standards for the safeguarding of life or limb, health, public welfare and property while constructing this project. Approval is based on the correction of all noted deficiencies and compliance with all items listed below. Any changes from these documents and/or additional information shall be submitted to the Department of Building Safety for code compliance review and approval. Written response of approval must be on site prior to implementation of such changes. The following information is related to the submitted plans/scope or as general information regarding code compliance Compliance with the stated requirements will be verified during the construction process. All work shall be inspected. It is the responsibility of the contractor/installer to contact the Department of Building Safety, when ready to schedule an inspection, at (952) 442-7520 during regular business hours. If you have any questions or concerns regarding this plan review, please contact me via telephone at (952) 442-7520 or email at codereview@mnspect.com. Derrick Wyman Plans Examiner dwyman@safebuilt.com 4601 SHORELINE DRIVE Page 1 A-Y- ING PARK Miruictonfia Plan Specific Items: Building: Approved with Comments - Derrick Wyman, dwyman@safebuilt.com PLANS DATED: PLAN SHEETS REVIEWED: SCOPE OF WORK: As described on the contractor's scope of work. PLAN SPECIFIC ITEMS (to be completed during the construction process): City of Spring Park 4349 Warren Ave Spring Park, MN 55384 Phone (952) 471-9051 Fax (952) 471-9160 • Access shall be provided to the roof by the contractor during all inspections. Access shall be by an OSHA approved ladder or other approved means. Minnesota Building Code Items: 1. Roof Coverings shall be installed in accordance with the MN building code and the approved manufacturer's instructions such that the roof coverings shall serve to protect the building. (MBC 1503.1). All roof coverings and roof assemblies must comply with performance requirements (MBC 1504) and fire classification (MBC 1505) 2. Flashing: Flashing shall be installed in such a manner so as to prevent moisture entering the wall and roof. Flashing shall be installed at wall and roof intersections, at gutters, wherever there is a change in roof slope or direction, and around roof openings. Metal flashing shall be corrosion resistant with a thickness of not less than 0.019-inch galvanized steel (MBC 1503.2) 3. Coping: Parapet walls shall be properly coped with noncombustible, weatherproof materials of a width no less than the thickness of the parapet wall. (MBC 1503.3) 4. Roof ventilation: Intake and exhaust vents shall be provided in accordance with Section 1203.2 (MBC 1503.3) 5. Crickets and saddles: A cricket or saddles shall be installed on the ridge side of any chimney or penetration greater than 30" (MBC 1503.5) 6. Roof replacement shall include the removal of all existing layers of roof coverings down to the roof deck. (MBC 1511.3) Exception: Where existing roof assembly includes an ice barrier membrane that is adhered to the roof deck, the existing ice barrier membrane shall be permitted to remain in place and covered with an additional layer of ice barrier membrane. 7. Roof recover: (MBC 1511.3.1) The installation of a new roof covering over an existing roof covering shall be permitted where any of the following occur: • The new roof covering is installed in accordance with the manufacturer's instructions. • Complete and separate roofing systems, such as standing -seam metal panel systems that are designed to transmit the roof loads directly to the buildings structural system and do not rely on the existing roof covering for support shall not require the removal of existing coverings. • Metal panel, metal shingle, and concrete and clay tile roof coverings shall be permitted to be installed over existing wood shake roofs. • The application of a new protective roof coating over and existing protective roof coating, metal roof panel, spray poly foam roof, built-up roof, modified roofing, thermoset and thermoplastic single -ply roofing shall be permitted without tear off of existing coverings. 8. A roof recover shall not be permitted where any of the following conditions occur: • The existing roof or roof covering is water soaked or has deteriorated to the point where the existing roof or roof covering is not adequate as a base for additional roofing. 4601 SHORELINE DRIVE Page 2 'Y— I City of Spring Park 4349 Warren Ave Spring Park, MN 55384 v� Phone (952) 471-9051 PARK Fax (952) 471-9160 • Where the existing roof covering is wood shake, slate, clay, cement, or asbestos -cement tile. • Where the existing roof has two or more applications of any type of roof covering. 9. Reinstallation of materials. Existing vent flashing, metal edging, drain outlets, collars, and metal counterflashing shall not be reinstalled where rusted, damaged, or deteriorated. Flashings shall be reconstructed in accordance with the manufacturer's instructions (MBC 1511.5) 10. Minimum Slope: (MBC 1511) Reroofing shall not be required to meet the minimum design slope requirement of one - quarter unit vertical in 12 units horizontal (2-percent slope) in Section 1507 for roofs that provide positive roof drainage if all of the following conditions are met: • The minimum required roof slope is infeasible due to existing parapet heights, existing unalterable flashing that requires positive drainage, or other obstacle. • Existing structure is demonstrated through structural analysis to be capable of supporting ponding to the level of the secondary emergency drainage system or point of overflow. • A secondary (emergency) drainage system is installed • Where the application of a new roof covering over wood shingle or shake roofs creates a combustible space, the entire existing surface shall be covered with gypsum board, or mineral fiber fastened in place. (MBC 1511.4) 11. Underlayment: Shall be installed per Table 1507.1.1(1) & 1507.1.1(2) Roof Type: 1. (MBC 1507.12) (EPDM) Thermoset single -ply roof coverings shall comply with ASTM D4637, ASTMD 5019. Unless designed for water accumulation in accordance with section 1611.2, roof shall have a design slope of a minimum of 1/4 vertical unit in 12 units horizontal (2%) slope. (MBC 1507.12.1) 2. (MBC 1507.15) (Liquid -applied roofing) Liquid applied roofing shall comply with ASTM C836, ASTM C957, ASTM D1227 or ASTM D3468, ASTM D6083, ASTM D6694 or ASTM D6947. Unless designed for water accumulation in accordance with Section 1611.2, liquid -applied roofs shall have a design slope of a minimum of one-fourth unit vertical in 12 units horizontal (2-percent slope). Skylights: 1. (MBC 2610.3) Dome -shaped skylights shall rise above the mounting flange a minimum distance equal to 10 percent of the maximum width of the dome but not less than 3". Minnesota Energy Code Items: 1. Insulation: • Where the insulation is entirely above the deck) roof shall have a minimum of R-30 continuous insulation. • Where two or more layers of continuous insulation board are used, the edge joints between each layer of continuous insulation boards shall be staggered. • [BF] 1508.2 Material standards. Above -deck thermal insulation board shall comply with the standards in Table 1508.2. (MN Rule 1305) 2. Insulation requirements for roof replacement. (MBC) For roof replacement on an existing building where the insulation is entirely above the deck and where the roof slope is less than two units vertical in 12 units horizontal, the insulation shall conform to the energy conservation requirements specified in Table 5.5-6, Opaque Thermal Envelope Requirements. (R- 30 ci) (2024 Minnesota Energy Code-ASHRAE 90.1-2019) Exception: Where the required R-value cannot be provided because of the thickness limitations that occur with the existing rooftop conditions, including heating, ventilation and air-conditioning equipment, low door or glazing heights, 4601 SHORELINE DRIVE Page 3 A-rI City of Spring Park 4349 Warren Ave Spring Park, MN 55384 V� Phone (952) 471-9051 PARK Fax (952) 471-9160 parapet heights, or proper roof flashing heights, the maximum thickness of insulation compatible with the available space and existing rooftop conditions shall be installed. GENERAL ITEMS: 1. Construction or work shall be inspected in accordance with the requirements of Minnesota Rule 1300.0210. 2. It is the responsibility of the contractor/installer to contact the Department of Building Safety, when ready to schedule an inspection, at (952) 442-7520 between the hours of 8:00 a.m. and 4:30 p.m., Monday through Friday. 3. The approved permit and all related plans and documentation shall be on site and available to the inspector at the time of inspection. 4. Failure to provide the required documentation to the inspector at the time of inspection may result in a cancelation of the inspection and additional inspection fees for the additional inspection(s). 5. The field inspector may identify additional code requirements during inspections. (Example of code requirement items that might be identified are fire sprinkler heads being obstructed by framing, beams, lighting, ceiling configurations, plumbing pipes, and mechanical system ductwork that will require review by the fire suppression plan reviewer. Additional work being completed that is not consistent with the project scope of work or the approved plans.) 6. Applicable Codes: 2020 Minnesota State Building Code, 2024 Minnesota State Energy Code 4601 SHORELINE DRIVE Page 4 CITY OF SPRING PARK PAGE 1 BUILDING PERMIT 4349 Warren Avenue Spring Park, MN 55384 ❑ Handout Given _ Phone: 952-471//-9051 Fax: 952-471-9160 ❑ Lead Handout Given R ute to M SP �(n �� j �! I ��. tj SITE ADDRESS: C '-D n f !J r'- C �� !? ,/tom^ PID: 1) Was the home constructed before 1978? (YES ❑, continue with line 2, NO o'continue without completing EPA Section) 2) Will the work disturb t6 sq ft of interior painted surfaces or k20 sq ft of exterior painted surfaces? (YES o go to line 4, NO c line 3) • 3) Are there any windows being replaced? (YES o, go to line 4, NO o continue without completing EPA Section) 4) Has this home been Certified Lead Free? (YES c, you MUST Attach Certification Information, NO o complete line 5) 5) EPA Contractor Certification Number NAT - (applies to contractoronly) ! PROPERTY OWNER: k S L- ---G Address. h,,-, ' City 67— P - L State: MIV Zi : Sr' 3 Email- r• Contact Name: Phone: 9 S oZ • CONTRACTOR: Piri C C; L LC Address: 92-CICIa i o �,r, rya so City. State: Zip. 0-4 Phone- D Fax: Contractor License No: - - ntact Name: SGr Phone/2 "o EmaiL t -+ o.' A r �- C i+-�6, 12--3 ^O 1 ARCHITECT: Address: City State. Zip Phone: Fax: • Email: Contact Name. PhcDe. 7OF WORK: ❑ New Construction ❑ Deck )(Re -Roof merclal Residential ❑ Change of Use ❑ Pool In Re -Side o Finish Basement ❑ Retaining Wall ❑ Fence EST. VALUATION OF WORK $ ❑ Remodel ❑ Porch a Shed Square feet: ❑Addition ❑ Demolition a Window/Door Replacement o Garage-Attached/Detach ❑ Plumbing -provide detail on Page 2 # being replaced -.Accessory Structure c Mechanical -proyde detail on Page 2 _ Misc Other • Detailed Description of Work: Lci o �c :�­ Cor '' GSA S coo t Sprsmre of In s apptc situ by IK Iepal property vvmr ora Ik enf¢d cmvalor, as Its tits repro enla; e s Tauired and amnor¢es Ins, Zoning Adminermtor or designee anti Ine auznq elfictai or designee to enter upon the property to perform needed Inspections Entry may be without prior notice- I hereby acknowledge that I have read this application and stale that all information Is true and cones to the best ormy knowledge 1 further agree that alt work performed will be In accordance with approved plans specifications and conditions and to abide by at ordinances of the Municipality sno the laws of the stale or Minnesota regarding actions taken pursuant to this permit I agree to pay all plan review fees even if I choose not to proceed with the work. Penult expires when work • isnot c onmenced within 180 days from dale of permit cr if work Is suspended abandoned. or not Inspected for 18o days Work beyond the scope or this permit or work without a permit or Inspection • .+• be subject to a penalty Noise Ordinance In Effect: SIONpA FRIDAY Before 7 a.m. and after 10 p.m. Weekends)Holidays before 7 a.m. and after 8 p.m. SIGNATURE OF APPLICANT: `mac �� DATE: 10-1 - Zs' PRINTED NAME: OS C_ &T This he signature of: ❑ Owneror zowners Representative ,.-;CC JP. TYPE CONST, TYPE CODE BLDG SPRINKLED Yes / No VALUATION. $ Permit Fee: $ 11wt • So WAC Charge: $ Plan Review Fee: $ a Sewer 8 Water Hook -Up: $ State Surcharge: $ _$�_. Sewer 8 Water Disconnect: $ _ Site Inspection Fee: $ Water Meter: $ S.E-C. Fee: $ _ Muni SE/WA Fee: $ Investigation Fee / Other Fee: $ '2016 SAC Escrow: $2485 >_ -J Copy Charge ($.25 per 8-5 x11 page) $ _ Other. $ zO License Check ($5) / Lead Check ($5) $ A I TOTAL DUE: to SUB -TOTALS y 'NOTE: Commercial plans will be submitted to the Met Council Environmental Svcs Plumbing Fee (from Page 2) $ for SAC determlnallon. Escrow payment will be required when permit Is Issued. If ed Mechanical Fee (from Paae 2) $ after Mot Council rovierw no SAC Is dmormin, escrow will be relunded In full. eWi LL Special Conditions/Required Setbacks: a 0 Building Approval By: DATE: Printed Building Approval By: ❑ License Verification ❑ Lead Verification - Checked By: City Approval By: DATE: �s Paid: 0& • Date: Receipt No V 'F By: Jamie Hoffman From: payment@thepaymentgroup.com Sent: Friday, November 14, 2025 9:00 AM To: Jamie Hoffman Cc: payment@thepaymentgroup.com Subject: JOSE RODRIGUEZ Permit Payment to Spring Park, MN - Permits & Licenses from TPG ATTENTION: if you need assistance with this payment, please FORWARD this email to tpgclientsuRport@nuvei.com and include your request. Your client manager will respond. Dear Spring Park, MN - Permits & Licenses, JOSE RODRIGUEZ has made a web Payment through The Payment Group for: Payment Information Date Paid: Friday, 14 November 2025 08:59:38 CT Confirmation: YV7BQE Credit Card Number (last 4 1255 digits): Credit Card Type: Visa First Name Last Name JOSE RODRIGUEZ ull Address ermit or Business Name ity, State & icense ip umber 11706 80TH PINE CITY 4601 AVE, MILACA, ROOFING SHORELINE 56353MN Payment Amount $3,064.93 JOSE RODRIGUEZ can be reached at: 612-685-4495 or PineCityRoofing@Gmail.com if there are any questions regarding this payment. Click here to login to your The Payment Group admin account Thank you once again for choosing The Payment Group! 1 RECEIPT City of Spring Park 4349 Warren Ave, Spring Park, MN 55384 (952) 471-9051 25SP-00085 i Re -roof (Commercial) Payment Amount: $3,064.93 wi=zz SPRING PARK On Lake 911innetonkg Receipt Number: 503 November 18, 2025 Transaction Method Payer Cashier Reference Number Credit Card per City Marcy Miller Comments Confirmed received payment per Petria at City Assessed Fee Items Fee items being paid by this payment Assessed Fee Item On Account Code Assessed Amount Paid Balance Due 11/04/25 State Surcharge $87.50 $87.50 $0.00 11/04/25 Commercial R/S/W/D Plan Review $1,172.93 $1,172.93 $0.00 11/04/25 Commercial Roof/Siding/Window/Door $1,804.50 $1,804.50 $0.00 Totals. $3,064.93 $3,064.93 Previous Payments $0.00 Remaining Balance Due $0.00 Application Info Property Address Property Owner Property Owner Address Valuation 4601 SHORELINE DRIVE PHS/LAKE MINNETONKA LLC 2845 HAMLINE AVE N $175,000.00 SPRING PARK, MN 55384 / ATTN CFO ROSEVILLE, MN 55113 Description of Work Layover installation of new EPDM roof system by full adhesion method. see scope discription: