Loading...
Permits - Permit# 04-17 - 3916 Northern Avenue - 1/1/2004CITY OF SPRING PARK 4349 WARREN AVENUE SPRING PARK, MN 55384 952-471-9051 FAX 952-471-9160 BUILDING PERMIT APPLICATION Building Permit Application Requirements: 1. Application to be filled out & signed 2. Mechanical Permit Application & Calculation filled out 3. Energy Calculations filled out 4. Furnish a Certificate of Survey - See Attached 5. Furnish 3 sets of Construction Plans a) 1 set for City files b) 1 set for builder to use on site c) 1 set for City Building Inspector Construction Plans should include: 1. First floor plan 2. Footing & foundation plan 3. Elevations of all sides 4. Wall sections & cross sections 5. Details - stairs & any special connections ALL INFORMATION MUST BE SUBMITTED IN FULL BEFORE PLAN REVIEW WILL BE STARTED Date Received Date Approved Permit No. Fees To Be Charged: Permit State Surcharge Plan Review SAC Charge Availability Chrg TOTAL 6Y3.76 ZS'.o 0 4141-44 r THE APPLICANT IS (CIRCLE ONE) q ]�_ OWN//E�� ,-' OR CONTRACTOR JOB SITE ADDRESS 37 I16 UOt-'4I`�►'�/ (= NAME OF OWNER �C�"J / ?Qk WCCk Ave- HOME PHONE `�1 (� ASS WORK PHONE (rsl�' MAILING ADDRESS 3916 16 .No ��-1,yw CITY S p!�t�:j Pcr►g ZIP S S'39LI CONTRACTOR S e— L4' PHONE MOBILE PHONE MAILING ADDRESS CITY ZIP STATE LICENSE NO. ARCHITECT/ENGINEER St° U� PHONE MAILING ADDRESS NAME CITY REGISTRATION NO. ZIP TYPE OF WORK: NEW ADDITION ACCESSORY STRUCTURE MOVE DEMO REMODELIALTERATION RENOVATE LAND ALTERATION I o PROPOSED WORK (Describe in Detail) 'X'e � ,ti C1- pr'4� c"o ���.�a���oU o.rv� �e.i��;��. �-w� ,���y`s ��a; (�er►o�e. �.;,..cr��4- 'y;N�r� 40 �►� �c:�, I`e b �� 1 I- AL��ir,�i � G�y�t' C;h-A,y ZONING DISTRICT c STORIES SQ. FEET OR EACH FLOOR NO. OF BEDROOMS GARAGE STALLS ATTACHED O DETACHED BLDG. SIZE: LENGTH 41/ WIDTH .33i HEIGHT ESTIMATED CONSTRUCTION VALUATION (excluding land) $ -Sni OC- BUILDING PERMIT APPLICATION PAGE 2 HARDCOVER CALCULATION WORKSHEET A. House Z-0 X `A e 'b _ s S.F. Length Width �l X = S.F. B. Garage t X 37 6Y S.F. C. Driveway X = P3 00 S.F. X = S.F. D. Sidewalk 2('`a�X = S.F. X = S.F. E. Patio/Deck 6 X �� = tog S.F. F. ��' X = 1 �2- S.F. pec 1. TOTAL HARDCOVER S.F. 2. TOTAL PROPERTY AREA �4L19s,00 S.F. 1 DIVIDED BY 2 X 100 = ° I hereby apply for a building permit and I acknowledge that the information above Is complete and accurate; that the work will be In conformance with the ordinances and codes of the City and with the State Building Code; that I understand this is not a permit and work is not to start without a permit; and that the work will be in accordance with the proved plan. �- 5- b APPLICANT'S SIGNATURE ✓D-- DATE 7- INSPECTION REQUIRED: WORK REQUIRING SEPARATE PERMITS: t/ Footing before a pour _Plumbing !/ Framing rough -in Mechanical ✓ Insulation Well Wallboard before taping Grading & filling FINAL before occupancy Sewer Water WORK BEYOND OR WITHOUT A REQUIRED INSPECTION WILL BE SUBJECT TO PENALTY " Electrical from State 24 HOUR NOTICE REQUIRED CALL 249-4600 ZONING CERTIFICATE I do hereby certify to the Orono Building Official that the following described work has been reviewed for compliance with the Zoning Requirements of the City of Spring Park and will be approved for construction upon approval of the construction plans by the Building Official. Name Date Date 5'' 21 _ a y Ma8 18 04 08:21a Hennepin Sheriff - ITS 612-317-6136 p.5 REScheck Compliance Certificate 2000 IECC REScheckSoftware Version 3.5 Release I Data filename: C:\Program Files\Check\RESchecklhouse7.rck PROJECT TITLE: Remodel CITY: Spring Park STATE: Minnesota HDD: 8037 CONSTRUCTION TYPE: Single Family DATE: 05/ 17/04 DATE OF PLANS: 5/17/04 PROJECT DESCRIPTION: 3916 Northern Ave. COMPLIANCE: Passes Maximum UA = 317 Your Home UA = 206 35.0% Better Than Code (UA) Permit Number Checked By/Date Gross Glazing Area or Cavity Cont. or Door Perimeter R-Value R-Value U-Factor UA Ceiling 1: Flat Ceiling or Scissor Truss 720 50.0 0.0 19 Wall ground south: Wood Frame, 16" o.c. 144 19.0 0.0 6 Window 1: Wood Frame:Double Pane with Low-E 26 0.340 9 Door 1: Glass 19 0.350 7 Wall ground west: Wood Frame, 16" o.c. 320 19.0 0.0 18 Window 1 stairs: Wood Frame:Double Pane with Low-E 13 0.340 4 Window 2 kitchen: Wood Frame:Double Pane with Low-E 9 0.340 3 Wall ground north: Wood Frame, 16" o.c. 144 19.0 0.0 8 Window I kitchen: Wood Frame:Double Pane with Low-E 9 0.340 3 Window 1 pantery: Wood Frame:Double Pane with Low-E 9 0.340 3 Wall ground east: Wood Frame, 16" o.c. 320 19.0 0.0 19 Window bathroom: Wood Frame:Double Pane with Low-E 9 0.340 3 Wall 2nd south: Wood Frame, 16" o.c. 144 19.0 0.0 6 Window 1: Wood Frame:Double Pane with Low-E 26 0.340 9 Door 1: Glass 19 0.340 6 Wall 2nd west: Wood Frame, 16" o.c. 320 19.0 0.0 18 Window stairs: Wood Frame: Double Pane with Low-E 13 0.340 4 Window bed 2: Wood Frame:Double Pane with Low-E 9 0.340 3 Wall 2nd north: Wood Frame, 16" o.c. 144 19.0 0.0 9 Wall 2nd east: Wood Frame, 16" o.c. 320 19.0 0.0 17 Window bed 2: Wood Frame:Double Pane with Low-E 9 0.340 3 Window bath: Wood Frame: Double Pane with Low-E 9 0.340 3 Door bed 2: Glass 19 0.340 6 May 18 04 08:22a Hennepin Sheriff - ITS 612-317-6136 p.6 Basement Wall 1: Masonry Block with Empty Cells 608 24.8 8.2 20 Wall height: 8.0' Depth below grade: 6.3' Insulation depth: 8.0' Furnace 1: Forced Hot Air, 90 AFUE Air Conditioner 1: Electric Central Air, 20 SEER COMPLIANCE STATEMENT: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2000 [FCC requirements in REScheckVersion 3.5 Release 1 e (formerly ME&hecl and to comply with the mandatory requirements listed in the REScheckInspection Checklist. .._ Builder/Designer ' '� Date May 18 04 08:22a Hennepin Sheriff - ITS 612-317-6136 p.7 REScheck Inspection Checklist 2000 IECC REScheckSoftware Version 3.5 Release I DATE: 05/17/04 PROJECT TITLE: Remodel Bldg, Dept. Use Ceilings: [ J 1. Ceiling 1: Flat Ceiling or Scissor Truss, R-50.0 cavity insulation Comments: Above -Grade Walls: [ ) 1. Wall ground south: Wood Frame, 16" o.c., R-19.0 cavity insulation Comments: [ J 2. Wall ground west: Wood Frame, 16" o.c., R-19.0 cavity insulation Comments: [ ] 3. Wall ground north: Wood Frame, 16" o.c., R-19.0 cavity insulation Comments: [ ] 4. Wall ground east: Wood Frame, 16" o.c., R-19.0 cavity insulation Comments: [ ] 5. Wall 2nd south: Wood Frame, 16" o.c., R-19.0 cavity insulation Comments: [ ] 6. Wall 2nd west: Wood Frame, 16" o.c., R-19.0 cavity insulation Comments: [ ] 7. Wall 2nd north: Wood Frame, 16" o.c., R-19.0 cavity insulation Comments: [ ] 8. Wall 2nd east: Wood Frame, 16" o.c., R-19.0 cavity insulation Comments: Basement Walls: [ ] 1. Basement Wall 1: Masonry Block with Empty Cells, 8.0' ht/6.3' bg/8.0' insul, R-24.8 cavity + R-8.2 continuous insulation Comments: Exterior insulation must have a rigid, opaque, weather -resistant protective covering that covers the exposed (above -grade) insulation and extends at least 6 in. below grade. Windows: [ ) 1. Window 1: Wood Frame:Double Pane with Low-E, U-factor: 0.340 For windows without labeled U-factors, describe features: # Panes Frame Type Thermal Break? [ ] Yes [ ] No Comments: [ ] 2. Window 1 stairs: Wood Frame:Double Pane with Low-E, U-factor: 0.340 For windows without labeled U-factors, describe features: # Panes Frame Type Thermal Break? [ ] Yes [ ] No Comments: [ J 3. Window 2 kitchen. Wood Frame:Double Pane with Low-E, U-factor: 0.340 For windows without labeled U-factors, describe features: # Panes Frame Type Thermal Break? [ ] Yes [ ] No Comments: [ ] 4. Window 1 kitchen: Wood Frame:Double Pane with Low-E, U-factor: 0.340 For windows without labeled U-factors, describe features: # Panes Frame Type Thermal Break? [ ] Yes [ ] No Comments: May 18 04 08:22a Hennepin Sheriff - ITS G12-317-G13G p.8 5. Window 1 pantery: Wood Frame:Double Pane with Low-E, U-factor: 0.340 For windows without labeled U-factors, describe features: # Panes Frame Type Thermal Break? [ ] Yes [ ] No Comments: 6. Window bathroom. Wood Frame:Double Pane with Low-E, U-factor: 0.340 For windows without labeled U-factors, describe features: # Panes Frame Type Thermal Break? [ ] Yes [ ] No Comments: 7. Window 1: Wood Frame:Double Pane with Low-E, U-factor: 0.340 For windows without labeled U-factors, describe features: # Panes Frame Type Thermal Break? [ J Yes [ ] No Comments: 8. Window stairs: Wood Frame:Double Pane with Low-E, U-factor: 0.340 For windows without labeled U-factors, describe features: # Panes Frame Type Thermal Break? [ ] Yes [ ] No Comments: 9. Window bed 2: Wood Frame:Double Pane with Low-E, U-factor: 0.340 For windows without labeled U-factors, describe features: # Panes Frame Type Thermal Break? [ ] Yes [ ] No Comments: 10. Window bed 2: Wood Frame:Double Pane with Low-E, U-factor: 0.340 For windows without labeled U-factors, describe features: # Panes Frame Type Thermal Break? [ ] Yes [ ] No Comments: 11. Window bath: Wood Frame:Double Pane with Low-E, U-factor: 0.340 For windows without labeled U-factors, describe features: # Panes Frame Type Thermal Break? [ ] Yes [ ] No Comments: Doors: 1. Door 1: Glass, U-factor: 0.350 Comments: 2. Door 1: Glass, U-factor: 0.340 Comments: 3. Door bed 2: Glass, U-factor: 0.340 Comments: Heating and Cooling Equipment: 1. Furnace 1: Forced Hot Air, 90 AFUE or higher Make and Model Number 2. Air Conditioner 1: Electric Central Air, 20 SEER or higher Make and Model Number Air Leakage: [ ] Joints, penetrations, and all other such openings in the building envelope that are sources of air leakage must be sealed. [ ] j Recessed lights must be 1) Type IC rated, or 2) installed inside an appropriate air -tight assembly with a 0.5" clearance from combustible materials. If non -IC rated, the fixture must be installed with a 1 3" clearance from insulation. Vapor Retarder: Required on the warm -in -winter side of all non -vented framed ceilings, walls, and floors. Materials Identification: [ ] Materials and equipment must be installed in accordance with the manufacturer's installation instructions. [ ] Materials and equipment must be identified so that compliance can be determined. [ ] Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment must be provided. [ ] Insulation R-values, glazing U-factors, and heating and cooling equipment efficiency must be clearly I m V� 4 — thn h..*IA; n _1on — crwri iirotinnc May 18 04 08:22a Hennepin Sheriff - ITS 612-317-6136 p.9 Duct Insulation: [ ] Ducts in unconditioned spaces must be insulated to R-5. Ducts outside the building must be insulated to R-8.0. Duct Construction: [ J I All joints, seams, and connections must be securely fastened with welds, gaskets, mastics (adhesives), mastic -plus -embedded -fabric, or tapes. Duct tape is not permitted. Exception: Continuously welded and locking -type longitudinal joints and seams on ducts operating at less than 2 in. w.g. (500 Pa). [ ] Ducts shall be supported every 10 feet or in accordance with the manufacturer's instructions. [ ] Cooling ducts with exterior insulation must be covered with a vapor retarder. [ ] Air filters are required in the return air system. [ ] The HVAC system must provide a means for balancing air and water systems. Temperature Controls: [ ] Thermostats are required for each separate HVAC system. A manual or automatic means to partially restrict or shut off the heating and/or cooling input to each zone or floor shall be provided. Service Water Heating: [ ] Water heaters with vertical pipe risers must have a heat trap on both the inlet and outlet unless the water heater has an integral heat trap or is part of a circulating system. [ J Insulate circulating hot water pipes to the levels in Table 1. Circulating Hot Water Systems: Insulate circulating hot water pipes to the levels in Table 1. Swimming Pools: [ J All heated swimming pools must have an on/off heater switch and require a cover unless over 20% of the heating energy is from non-depletable sources. Pool pumps require a time clock. Heating and Cooling Piping Insulation: [ ) HVAC piping conveying fluids above 105 OF or chilled fluids below 55 OF must be insulated to the levels in Table 2. May 18 04 08:22a Hennepin Sheriff - ITS 612-317-6136 Table 1: Minimum Insulation Thickness for Circulating Hot Water Pipes. Insulation Thickness in Inches by Pipe Sizes Heated Water Non -Circulating Runouts Circulating Mains and Runouts Temperature ( F) Up to 1" Up to 1.25" 1.5" to 2.0" Over 2" 170-180 0.5 1.0 1.5 2.0 140-160 0.5 0.5 1.0 1.5 100-130 0.5 0.5 0.5 1.0 Table 2: Minimum Insulation Thickness for HVAC Pipes. Fluid Temp. Insulation Thickness in Inches by Pipe Sizes Piping System Types Range F 2" Runouts 1" and Less 1.25" to 2" 2.5" to 4" Heating Systems Low Pressure/Temperature 201-250 1.0 1.5 1.5 2.0 Low Temperature 120-200 0-5 1.0 1.0 1.5 Steam Condensate (for feed water) Any 1.0 1.0 1.5 2.0 Cooling Systems Chilled Water, Refrigerant, 40-55 0.5 0.5 0.75 1.0 and Brine Below 40 1.0 1.0 1.5 1.5 NOTES TO FIELD (Building Department Use Only)