Permits - Permit# SP-2021-00040 - 4527 Shoreline Drive - 5/13/2021City of Spring Park Permit
�UIYM
R C?F71A R
To Schedule an Inspection Call: 952-442-7520
Details
Permit Number: SP-2021-00040
Issue Date: 5/13/2021
Zoning Type: COMMERCIAL
Use Type:
24 HOUR NOTICE REQUIRED FOR ALL INSPECTIONS • MON-FRI: 8AM-4:30PM ♦ NO HOLIDAYS
Site Address: 4499 SHORELINE DR, SP, MN 55384
Description:
Replace water heater - like for like
Permit Granted To: Yale Mechanical
Permit Type: PLG Water Heater (Comm)
Homeowner's Name: PHS/LAKE MINNETONKA
LLC
Permit Exp: 11/8/2021
Phone Number:
Valuation: $6,000.00
Parcel #: 1811723340245
Fees
Receipt # Product
Date-----
Quantity
Date Paid
Status Pmt Info
Amount
12348 --Permit Fee
—Sale
5/12/2021
1.00
5/13/2021
Paid Check: 105019
$173.50
12348 State Surcharge
5/12/2021
1.00
5/13/2021
Paid Check: 105019
$3.00
12348 Plan Review Fee
5/12/2021
1.00
5/13/2021
Paid Check: 105019
$112.78
Total: $289.28
Notes
• This permit is issued in accordance with and subject to all provisions of Ordinances and policies governing building and zoning in City of
Spring Park.
• Permit Holder/Contractor/Owners Agent is responsible to call for the inspections!
• Permit Packet, including approved plan, and this inspection record must be posted in an accessible location before calling for inspection.
Maintain this inspection record until work is complete.
• No deviations from the approved plans are allowed without prior consent from the building inspections department.
• To Owner, Occupant, or Contractor: It is ILLEGAL TO OCCUPY this area/building until all required final inspections have been made,
approved, signed, and certificate of occupancy issued!
M
Scott Qualle, Building Official
City of Spring Park *4349 Warren Avenue ♦ 55384 Copyright 02021
INSPECTION RECORD
City of Spring Park Permit Number: SP-2021-00040 Issue Date: 5/13/2021
SITE ADDRESS: 4499 SHORELINE DR, SP, MN SS384 Description:
PERMIT TYPE: PLG Water Heater (Comm) Replace water heater - like for like
ZONE/USE TYPE: COMMERCIAL
APPLICANT: Yale Mechanical
OWNER: PHS/LAKE MINNETONKA LLC
No inspection will be performed, and a re -inspection fee will be charged, if this "Inspection Record", the "City of Spring Park Permit", and, when applicable, the
approved plans are not available to the inspector. This permit expires if construction activity does not commence within 180 days from obtaining this permit; when
construction activity has been suspended or abandoned for at least 180 days; or the work has not been inspected within 180 days from the last documented activity.
IF SEPARATE PERMITS ARE REQUIRED, REFER TO THE "SEPARATE PERMITS REQUIRED FOR:" STAMP ON YOUR APPROVED
PLANS/CONSTRUCTION DOCUMENTS TO IDENTIFY WHAT SEPARATE PERMITS ARE REQUIRED.
ALL REQUIRED ROUGH -IN INSPECTIONS, NOTED ON SEPARATE PERMITS, MUST BE COMPLETED PRIOR TO SCHEDULING A FRAMING
INSPECTION.
ALL REQUIRED FINAL INSPECTIONS, NOTED ON SEPARATE PERMITS, MUST BE COMPLETED PRIOR TO SCHEDULING A BUILDING FINAL
INSPECTION.
DO NOT COVER ITEMS TO BE INSPECTED.
Permit Card
Inspection Inspector's Response Approval Date Comments or Corrections Required
Plumbing.
MUST CALL TO SCHEDULE NO LATER THAN THE BUSINESS DAY PRIOR TO THE INSPECTION DAY: 8:00 A.M. TO 4:30 P.M. MONDAY THRU
FRIDAY. PHONE NUMBER TO CALL: 952-442-7520
When a Certificate of Occupancy is needed, return this card and the approved final inspection notice to
the City of Spring Park office.
JEB 21-0690
(::::X
N_
City of Spring Park
4349 Warren Ave.
Spring Park, MN 55384
City: 952-471-9051 MNSPECT: 952-442-7520
COMMERCIAL PLUMBING PERMIT
AND PLAN REVIEW APPLICATION
Permit Number: SP-2021-00040
Project (site) Address 4499 Shoreline Drive Owner's Phone 651-468-5645
Business Name Park Shore Apartment Owner's Name Presbyterian Homes
City/State/Zip Spring Park, MN 55364
Owner's Address 4527 Shoreline Drive
Plumbing Contractor/Designer Yale Mechanical Phone 952-884-,1661
Address 220 West 81st Street
Bond Number: MB004822
City/State/Zip Minneapolis, MN 55420
Plumbing License Number:
TYPE(S) OF WORK: ❑ New Construction ❑ Addition ❑ Remodel EIReplacement
❑ Food service/bar/lodging ❑ Hospital/Nursing Home
EST VALUATION OF WORK: $ 6,000 PROJECT DESCRIPTION: Replace like for like water heater.
BUILDING SERVICE INFORMATION:
Sewer: ❑ New Municipal ❑ Existing Municipal ❑ New- On -Site Septic ❑ Existing On -Site Septic
Water: ❑ New Municipal ❑ Existing Municipal ❑ New Private We'll ❑ Existing Private Well
PLEASE INDICATE ALL FIXTURES INCLUDED IN THIS PERMIT:
Water Closet (toilet)
Lavatory (wash basin)
Kitchen Sink & Disp.
Laundry Tray
1 Water Heater
Urinal
Rough -in Future Fix.
Misc. Fixtures
Bathtub
Shower
Dishwasher
Clothes Washer
Water Softener
Drinking Fountain
Sump
Floor Drain
Floor Sink
Piping/Treating Equipment
Catch Basin
Vacuum Breakers
Lawn Sprinkler System
Roof Leader -Rainwater
Septic Tank & Drain Field
Water Piping System
Total Number
Of Fixtures
1
Signature of this application by the legal property owner or a licensed contractor, as the owner's representative is required and authorizes the Municipality Zoning Administrator or designee
and the Municipality Building Official or designee to enter upon the property to perform needed inspections. Entry maybe without prior notice. I hereby acknowledge that I have read this
application and state that all information is true and correct to the best of my knowledge. I further agree that all work performed will be in accordance with approved plans, specifications
and conditions, and to abide by all of the ordinances of the Municipality and the Laws of the State of Minnesota regarding actions taken pursuant to this permit, I agree to pay all plan review
fees even if I choose not to proceed with the work. I certify that this plumbing system was designed in accordance with the Minnesota Plumbing Code (as amended) to the best of my
abilities, and I agree to forward the report and plans to the installer of the system.
�/ft _X John Black 04/28/21
Signature Print Signature Name Date n
ADr)roved valuation: (D, I W
Permit Fee ............................
173.50
Code Review .......................
112.78
State Surcharge ..................
3.00
License Look Up .................
Other..................................
Total Permit Charge
$ 289.28
Permit issued by:
Dale Engelmann (AK)
Date: 5-10-2021
Page113
THIS PAGE MUST ACCOMPANY ALL COMMERCIAL PLUMBING PERMIT APPLICATIONS
The following checklist has been compiled to assist in expediting the commercial plan review and permit
issuance process. Please take a moment to review these submittal requirements and to verify all of the
necessary documentation prior to submitting your project.
PLUMBING PERMIT and PLAN REVIEW - THE FOLLOWING ITEMS ARE REQUIRED:
❑ Completed permit application including:
❑ Site Address (including Suite #) and Business Name
❑ Owner
❑ Owner Address
❑ Telephone Number
❑ Contractor Information (if applicable)
❑ Valuation of work being performed
❑ Description of work being performed
❑ Signature of applicant
❑ Date
❑ 2 sets of Signed Plumbing Plans
❑ Utility Site Plan / Floor Plan / Roof Plan
❑ Water Riser / Soil, Waste, Vent Riser Diagrams
❑ Plumbing Specifications
❑ Copy of Plumbers License/Bond
❑ Complete and provide Service Water Heating Compliance Forms for compliance with the Minnesota State Energy
Code (https://www.ashrae.org/standards-research—technology/standards-forms—procedures)
PLUMBING PLAN REVIEW - Please provide the following information:
Choose one of the following:
❑ Building Sewer and/or Water Service Only (this fee applies when no interior plumbing is to be installed)
$150 flat fee
❑ Plumbing System (Water distribution and drain/waste/vent systems within the building, and water and/or sewer
service connections, if applicable).
This portion of the fee is based on total number of drainage fixture units (DFU)
Total DFU
a. 25 or fewer DFU $ 150
b. 26 to 50 DFU $ 250
c. 51 to 150 DFU $ 350
d. 151 to 249 DFU $ 500
e. 250 or more DFU: $3 x _ DFU $ Maximum $4,000
❑ Interceptors/Separators (grease interceptors, flammable water interceptors, etc...)
x $70 = $ or ❑ None
❑ Storm Drainage System $150 minimum OR
Each internal roof drain opening ($500 max.) x $50 = $ or ❑ None AND/OR
Each storm water interceptor, separator, or catch basin design x $70 = $ or ❑ None
❑ Manufactured Home Park or Campground
a. 25 or fewer sites $ 300 c. 51 to 125 sites $ 400
b. 26 to 50 sites $ 350 d. 125 or more sites $ 500
TOTAL PLUMBING PLAN REVIEW $
Page213
PLUMBING PLAN REVIEW REQUIREMENTS
Below is a list of requirements necessary to complete a review of plumbing systems in commercial buildings.
Please read the following carefully to ensure you provide all required information to minimize delays in the plan
review process.
1. Utility Site Plan (if new services are to be installed): The utility plan must show the locations, sizes and
slopes of all sanitary sewer, all storm sewer, and water service piping within the property lines. If wells or
sewage treatment systems will be located on the property, they must be shown on the plan so that proper
isolation distances can be verified. The utility plan must indicate the pipe materials to be used for each service
unless otherwise listed in the specifications. The plan must include a directional reference.
2. Floor plan: The floor plan must show the locations of all plumbing fixtures. The sizes and locations of all
horizontal sanitary and storm piping must be shown on the plan.
3. Water Riser Diagram: The drawing must show an isometric view of the water distribution piping from the
water service entrance to the connection to all plumbing fixtures and equipment. The plumbing fixtures,
equipment connected to the water distribution system, and all pipe sizes must be clearly labeled on the
drawing.
4. Soil, Waste and Vent Riser Diagram: The drawing must show an isometric view of the waste and vent
piping within the building. All pipe sizes and fixtures must be clearly labeled on the drawing.
5. Material Specifications: A list of fixtures, materials, and procedures must be provided which includes the
following:
a. A list of the fixtures and appurtenances that are connected to the potable water distribution system or that
discharge to the sanitary waste system. The list must include manufacturer and model number of each
plumbing fixture or appurtenance.
b. The type and quality standard (e.g. ASTM, ANSI, etc.) of the pipe materials to be used in the plumbing
system, including the type of joints.
c. The pressure testing and disinfection procedures.
6. Roof plan: A roof plan must be provided if roof drains will be installed that are piped inside the building. If no
internally piped roof drains will be installed, a roof plan is not necessary for plan review. A statement should
be included that the roof is pitched and the building is served by scuppers.
7. Signature: All plumbing plans that are submitted to MNSPECT must be signed by a master plumber or a
professional engineer who is registered in the State of Minnesota. Signature and license number must be
on each plan sheet.
Page313
SAMPLE DIAGRAMS
Water Heater
P6
P1
Tank Water Closet
4'
P2
Lavatory
P3
Urinal
2'
P4
Dishwasher
P8 P7
P5
Hand Sink
P6
Mop Sink
P7
3-Compartment Sink
P8 P4
P8
Floor Drain (without
P8
backwater valve)
O
3• 2`
4'
„Clean Out
Figure 1
Floor Plan
X4"
1'
Water Meter V4' .
P7
P6
Water Heater 3/4+, 3/4'
112 P4
Maximum Developed Length: 40 Feet
Pressure Range: 46 - 60 psi
Individual Branches 1/2" Unless
Otherwise Noted
— -- Cold Water
--- --- Hot Water
P
3/4` P2 • 5 2" VTR
P1 P2
131 '3/4•�' P3 Figure 2 I
P1 Water Riser Diagram
3" VTR
i
r 11 c.o.�l
P2 I
1 !I
Pi ! 1•1/2' Rd
131 I P3
L t 4'
• •i,
ram,,,- I
j P7
I I I
I I I
I 1 P4 I
I P6 P8 1
2' P5 P8 I 2
3" C.O.
x
4'
� Figure 3
C.O. a" P1 Waste and Vent Riser Diagram
SAMPLE DIAGRAMS
This Plan Must Be Maintained And
Accessible On The Construction Site
Read All Attached Materials!
Manufacturers' Installation
instructions shall be available on the
job site at the time of inspection
The approved plans and a copy of
the plan review letter from the MN
Dept. of Labor and Industry must be
on site at the time of all inspections.
An inspection will NOT be conducted
if the required documents are not on
site at the time of the. scheduled
inspection.
Must Post Address on
Construction
Site, Visible from the Road
IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO CALL GOPHER STATE
ONE CALL 651-454-0002, OR 811 BEFORE
BEGINNING EXCAVATION
NO OCCUPANCY OR USE ALLOWED
UNTIL FINAL INSPECTION AND APPROVAL
CALL BUILDING INSPECTOR 952-442-7520
PENALTY -MAXIMUM $750.00 FINE
EVERY PERSON PERFORMING WORK FOR
WHICH THE CODE IS APPLICABLE, SHALL
COMPLY WITH THE CODE.
SUBJECT TO CODE COMPLIANCE
DURING CONSTRUCTION
ADVANCE
REVIEWED FOR CODE COMPLIANCE
Commercial Plumbing
SUMP COVERS MUST BE SOLID MATERIAL
AND SECURED.
4715.0340 SUBPART 4
ALL WATER SUPPLY PIPING IN EXTERIOR WALLS
SHALL BE ADEQUATELY PROTECTED AGAINST
FREEZING BY INSULATION, HEAT, OR BOTH
ALL WATER FROM FOUNDATION DRAINS
OR SUMPS MUST BE PUMPED OR DRAINED
DIRECTLY TO THE EXTERIOR THROUGH
RIGID PLASTIC OR STEEL PIPING. NO
SUMP WATER IS ALLOWED TO BE PUMPED
INTO FLOOR DRAINS, SINKS OR ANY
OTHER ACCESS TO SANITARY SEWER.
CONTRACTOR SHALL VERIFY SANITARY
SEWER ELEVATION IN RELATION TO
THE LOWEST FLOOR ELEVATION PRIOR
TO CONSTRUCTION.
MN Rule 4715.0200 N
Plumbing shall be installed with due
regard to preservation of the strength
of structural members and prevention of
damage to the walls and other surfaces
through fixture usage.
MN Rule 4715.0300 Subp. 4
All pipes passing under or through
walls shall be protected from breakage.
All pipes passing through or in contact
with cinder, concrete, or other corrosive
material shall be protected against
external corrosion by protective coating,
wrapping, or other means that will
resist such corrosion.
FOR ALL INSPECTIONS:
Po- CALL 24 HOURS IN
►GIVE PERMIT NUMBER
(952) 442-7520
May 10, 2021
Plans and Specifications: Park Shore Apartments
4499 Shoreline Drive
Spring- Park, MN
Submitter/Plumber: Yale Mechanical
220 West 81 st Street
Minneapolis, MN 55420
Scope: The installation consisted of a replacement of a commercial gas water heater.
Inspection: All plumbing installations must be inspected and tested in accordance with the
requirements of the 2015 Minnesota State Plumbing Code. It is the responsibility of
the contractor/installer to notify the inspection department when ready to schedule
an inspection as required by Minnesota Rule 4714.103.5 thtu 4714.103.8. Call the
building inspection department at (952) 442-7520 between the hours of 8:30 a.m.
and 4:30 p.m., Monday through Friday.
The plans for the project named above have been reviewed for substantial compliance with the
Minnesota Plumbing Code, as amended, and does not cover the water supply or sewage system
to which this plumbing system is connected. The review is limited to the submitted scope of work,
and is based upon the supposition that the data on which the design is based are correct, and
that necessary legal authority has been obtained to construct the project. The responsibility for
the design of structural features and the efficiency of equipment must be taken by the project
designer. Approval is contingent upon satisfactory disposition of any requirements included in
this report.
General Requirements:
1. Governing Codes: 2009 Minnesota Mechanical Code (MMC); 2009 Minnesota Fuel Code
(MFGC); 2009 Minnesota Commercial Code (MCEC)
2. Appliances, equipment, and materials. shall be installed as required by the terms of their
approval, in accordance with the conditions of the listing, the manufacturer's installation
instructions and the governing codes. Manufacturer's installations instructions shall be
available on the job site at the time of the inspectioh.(MMC section 304.1)
Appliance and Equipment Placement and Access:
3. Clearances around appliances shall be sufficient to allow inspection, service, and repair or
replacement. ( MMC section306.1) and ( MN Rules, part4715.2240
Appliance Venting:
4. Appliance venting shall comply with the manufacturer's installation requirements, MMC
chapter 8, and MFGC chapter 5.
Gas Piping
5. A final gas piping system, appliance and equipment leakage test shall be conducted in
the presence of the Inspector at the final Inspection. (MFGS section 406.6)
6. Gas piping exposed to corrosive action such, such as moisture, shall be protected. (MFGC
section 404.8)
7. A minimum 3 inch sediment trap shall be installed as close to the inlet of the equipment,
before any regulator or automatic gas valve. (MFGC section 408.4)
8. Each appliance shall be provided with an accessible shutoff valve in the gas line within 6 feet
of the appliance; upstream of the union, connecter or quick disconnect; and separate from
the appliance.
Plumbing
9. The water heater must be equipped with a full -way valve located on the cold water line near
the equipment as per MN Rules, part 4714.606.2.
10. Equipment used for heating water or storing hot water shall be protected by an approved
safety device as per MN Rules, part 4714.504.6.
11. The relief valve discharge pipe shall be full size and discharge with in 18 inches of the floor or
a safe place of disposal as per MN Rules, part 4714.507.5.
If you have any questions or concerns regarding this plan review, you may contact me via
telephone at 952-442-7520 / 888-446-1801, or e-mail at codereview@mnspect.com. Refer to the
above stated file number.
Sincerely,
in OA eVOQ�
Dale Engelmann
Code Compliance Examiner
Plumbing Plans and Inspections
MNSPECT
cc: Municipal File
Thank you for your Payment!
Transaction ID: 12348
Transaction Number -
Transaction Type: Payment
Recipient: Contractor
Notes:
Fees
Cl 1 Y OU
1' k R
City of Spring Park
4349 Warren Avenue
SP MN,55384
Ph:952-442-7520
$289.28
Date: 5/13/2021
Method: Check: 105019
Address: 4499 SHORELINE DR, SP, MN 55384
Reference: Permit Number: SP-2021-00040 Type: PLG Water Heater
(Comm) for Yale Mechanical
t,rouicx:
—Permit Fee Paid 1.00 $173.50 $173.50
State Surcharge Paid 1.00 $3.00 $3.00
Plan Review Fee Paid 1.00 $112.78 $112.78
Total Amount: $289.28
Page 1 of 1 Printed on: 5/13/2021