Permits - Permit# 06-22 - 2425 Black Lake Road - 1/1/2006$ Permit: $125.25 Valuatton $6,000.00 Ro. 06 -22
Plan Review: 0
State: 3.00
Total: $128.25
atatie of Ainttegota City of Spring Park
County of Hennepin } Office of Building Inspector
jOutUtug 3perntit
IN CONSIDERATION OF The statements and representations made by W. F. Smith Roofing
in application therefore duly filed in this office, which application is hereby made a part hereof, PERMISSION IS HEREBY
GRANTED To said W.F. Smith Roofing as owner
to tear off roof and re -shingle a building described as follows: kind of construction
(build, erect, install, add to, alter, repair, move, wreck, as the case may be)
Roof tear off and re -shingle
Front of width in feet ; side or length in feet ; height in feet ;
number of stories ; contents cubic feet; square feet, upon that
tract of land described as follows: Lot Block ; plat or addition
2425 Black Lake Road
which tract is of the size and area specified in said application.
This permit is granted upon the express conditions that said owner and h _ contractors, agents, workers and
employees, shall comply in all respects with the ordinances of the City of Spring Park ;
that it does not cover the use of public property, such as streets, sidewalks, alleys, etc., for which special permits must
be secured; and that it does not cover the following: none of the following
(Electrical work, plumbing, heating, plastering, etc., if such there be.)
for which special permits must be secured.
Given under the hand of the Building Inspector of said City and its corporate seal and
attested by its Clerk this . 12 day of June Year 2006
Lyle Oman
Building Inspector
CITY OF SPRING PARK
4349 WARREN AVENUE
SPRING PARK, MN 55384
952-471-9051 FAX 952-471-9160
BUILDING PERMIT APPLICATION
Building Permit Application Requirements:
1. Application to be filled out & signed
2. Mechanical Permit Application & Calculation filled out
3. Energy Calculations filled out
4. Furnish a Certificate of Survey - See Attached
5. Furnish 3 sets of Construction Plans
a)1 set for City files
b)1 set for builder to use on site
c) 1 set for City Building Inspector
Construction Plans should include:
1. First floor plan
2. Footing & foundation plan
3. Elevations of all sides
4. Wall sections & cross sections
5. Details - stairs & any special connections
ALL INFORMATION MUST BE SUBMITTED IN FULL BEFORE PLAN REVIEW WILL BE STARTED
THE APPLICANT IS (CIRCLE ONE)
JOB SITE ADDRESS
OR CONTRACTOR
Date Received ° %.z
Date Approved / O
Permit No.
Fees To Be Charged: _
Permit
State Surcharge 3. DO
Plan Review
SAC Charge —
Availability Chrg -t—
TOTAL / oZ oI S
f)'Vbti- 90q"_7
NAME OF OWNER zl lr L., / X , HOME PHONE WORK PHONE
MAILING ADDRESS Z S ��= �[. `K (1 CITY r� n.�o. r Z� ZIP s 3 `(
1 CONTRACTOR PHONE MOBILE PHONE
,[
MAILING ADDRESS aJ �S SNy�rj LLD#- CITY �i�'`�V� 1�', ZIP l ��
STATE LICENSE NO. S �O
ARCHITECTIENGINEER
MAILING ADDRESS
NAME
CITY
REGISTRATION NO
PHONE
ZIP
TYPE OF WORK: NEW ADDITION ACCESSORY STRUCTURE MOVE DEMO
REMODELIALTERATION RENOVATT^E/� LAND ALTERATION
PROPOSED WORK (Describe In Detail)
ZONING DISTRICT
STORIES SQ FEET OR EACH FLOOR NO. OF BEDROOMS GARAGE STALLS
ATTACHED OR DETACHED BLDG. SIZE: LENGTH WIDTH HEIGHT
ESTIMATED CONSTRUCTION VALUATION (excluding land) $ 7 D 0
I BUILDING PERMIT APPLICATION
PAGE 2
HARDCOVER CALCULATION WORKSHEET
A. House X =
S.F.
Length width
X =
S.F.
B. Garage X
S.F.
C. Driveway X =
S.F.
X =
S.F.
D. Sidewalk X =
S.F.
X =
S.F.
E. Patio/Deck X =
S.F.
F. Other X =
S.F.
1. TOTAL HARDCOVER
S.F.
2. TOTAL PROPERTY AREA
S.F.
1 DIVIDED BY 2 X 100 =
%
1 hereby apply for a building permit and I acknowledge that the Information above Is complete and accurate; that the work will be in conformance
with the ordinances and codes of the City and with the State Building Code; that 1 understand this is not a permit and work Is not to start without
a permit; and that the work will be In accordance with the approved plan.
APPLICANT'S SIGNATURE DATE
INSPECTION REQUIRED: WORK REQUIRING SEPARATE PERMITS:
Footing before a pour Plumbing
Framing rough -in Mechanical
Insulation Well
Wallboard before taping Grading & filling
FINAL before occupancy Sewer
Water
WORK BEYOND OR WITHOUT A REQUIRED
INSPECTION WILL BE SUBJECT TO PENALTY Electrical from State
24 HOUR NOTICE REQUIRED CALL 952-249-4600
ZONING CERTIFICATE
I do hereby certify to the Orono Building Official that the following described work has been reviewed for
compliance with the Zoning Requirements of the City of Spring Park and will be approved for construction upon
approval of the con ctio lans by the Building Official.
Z 0 L
Name Date
BUILDING CODE PLAN REVIEW
Name Date