Loading...
Permits - Permit# 98-09 - 2429 Black Lake Road - 1/1/1998CITY OF SPRING PARK BUILDING PERMIT APPLICATION CITY OF SPRING PARK P. 0. BOX 452 SPRING PARK, MN 55384-0452 Building Permit Application Requirments: 1. Application to be filled out & siggned 2. Mechanical Permit Application & Calculation filled out 3. Energy Calculations filled out 4. Furnish a Certificate of Survey - See Attached 5. Furnish 3 Sets of Construction Plans a. 1 set for City Files b. 1 set for builder to use on site c. 1 set for city Building Inspector Construction Plans should include: 1. First floor plan 2. Footing & foundation plan 3. Elevations of all sides 4. Wall sections & cross sections 5. Details - stairs & any special connections Date Received: Date Approved: '11L q'K Permit No.: 1��09 Fees To Be Charged: Permit $ State Surcharge :V, Plan Review SAC Charge Availability Chrg TOTAL $ ALL INFORMATION MUST BE SUBMITTED IN FULL BEFORE PLAN REVIEW WILL BE STARTED THE APPLICANT IS: (Circle One) OWNER or CONTRA JOB SITE ADDRESS rid 11 .KI C• C k Lc.k NAME OF OWNER �► �I "' �'`G HOME PHONE 9-9 as / 9 - /i� -.-- .,2 WORK PHONE MAILING ADDRESS LE a-"l 81 L . K, Ok CITY ZIP-S�53eg— CONTRACTOR IN LkUTVS S- 004 PHONE.Sg-1"0309' MOBILE PHONE MAILING ADDRESS CITY ti Vr►u �H. /� A/ ZIP SfI STATE LICENSE NO. a,eo ( -.D -7 ARCHITECT/ENGINEER MAILING ADDRESS NAME TYPE OF WORK: New Addition Remodel/Alteration _ PHONE �d� REGISTRATION NO Accessory Structure Move Renovate Land Alteration _ PROPOSED WORK (Describe in Detail) �eur o':' 4 Re rooms Ao-lfe ZONING DISTRICT STORIES W9 Demo SQ. FEET OR EACH FLOOR NO. OF BEDROOMS GARAGE STALLS ATT. OR DET. L" W ESTIMATED CONSTRUCTION VALUATION (excluding land) $ 39 3 0 ° 0 0 HT • CI FX OF SPRING PARK BUILDING PERMIT APPLICATION PAGE 2 HARDCOVER CALCULATION WORKSHEET A. House X - Length Width X — B. Garage X C. Driveway X X D. Sidewalk X X E. PatiC/ X F. Other X X 1. TOTAL HARDCOVER 2. TOTAL PROPERTY AREA 1 -2 X 100 = S.F. S.F. S. F. S. F. S. F. S.F. S.F. S.F. S.F. S.F. S.F. S.F. o� I hereby apply for a building permit and I acknowledge that th information above is complete and accurate; that the work will be in conformance with the ordi antes and codes of City and with the State Building Code; that I understand this is not a permit and work is not to sta wi out a perm' ; nd that the work will be in accordance with the approved plan. APPLICANT'S SIGNATURE DATE 4' I b " g i INSPECTION REQUIRED: Footing before a pour Framing rough -in Insulation Wallboard before Taping FINAL before occupancy WORK BEYOND OR WITHOUT A REQUIRED INSPECTION WILL BE SUBJECT TO PENALTY. 24 HOUR NOTICE REQUIRED 473-7357 WORK REQUIRING SEPERATE PERMITS Plumbing Mechanical Well Grading & filling Sewer Water Electrical from State ZONING CERTIFICATION I do hereby certify to the Orono Building Official that the following described work has been reviewed for compliance with the Zoning Requirements of the City of Spring Park and will be approved for construction upon approval of the construction plans by the Building Official. Name Date BUILDING CODE PLAN REVIEW Name Date r-orm No. cna—)ttev. ti-w-no) wit e 1 87.25 ... ............................ Total *0 $89.25 miner-uavis uu., atate of Minnroata, ....... J. y................. of..SPr.in9... park ..................................... County of ............ Hennep.in............... Office of Bu i .. d.. ng Inspector ---------............------... i�Permit g IN CONSIDERATION OF The statements and representations made by........................................................................... Western Cedar Supply ------------------------------------------------------•---...---................------------------...........-----.........--------................-..................... in.A 1 S_.__._._.___application therefor duly filed in this office, which application is hereby made a part hereof, PERMISSION IS HEREBY GRANTEDTo said. Western ...Cedar ...SuP..PI.Y.............................................._........................................................ as owner Tear off and re-r f .p. ��. a building described as follows: kind of construction to QQ hQ.t�se er.... a 1.i ca.t.i-are .............. (build, erect, install, add to, alter, repair, move, wreck, as the case may be) front or width in feet ................ number of stories ----------------------- ......---•--------------; side or length in feet ...................................................... ; height in feet ------------------------------------------------------ ; ; contents..................................................................cubic feet; ............... .................................... square feet, upon that tract of land described as follows: Lot ....... ..................................... Block ........................................................... ; plat or addition ......................................................... 2429 Black Lake Road 19-117-23-12-0018 ..................................................................................................................................................................................................................................-----...----------.....-----..........................-----.......--•--- which tract is of the size and area specified in said application. This permit is granted upon the express conditions that said owner and h_i_S_ contractors, agents, workers and employees, shall comply in all respects with the ordinances of the .............. �1.tY................................................... of..........P.rilr.l9... Part .................................... ; that it does not cover the use of public property, such as streets, sidewalks, alleys, etc., for which special permits must be secured; and that it does not cover the following: ...... None of the following ......................... . ...-•-•--......g........ - ...................... (Electrical work, plumbing, heating, plastering, etc., if such there be.) for which special permits must be secured. Given under the hand of the ........ B-0-.1.ding... .Inspector ......................of said..........City and its corporate seal and attestedby its ....................... .leek................. -----------•------......this ........ !-6th............................day of ........... AA.r l.....---...---.........-------------•-••-•-----------.................19-DB------- Attest: PatriciaHi - us.................. .............................. LY.le....Oman--•--•------:-•- ....-----J ............................. Clerk Building Inspector ..............