Loading...
Permits - Permit# SP-2021-00063 - 4208 West Arm Drive - 6/15/2021City of Spring Park Permit 1 CI I Y 01F P 11 � I i\ I "T A r' To Schedule an Inspection Call: 952-442-7520 Details Permit Number: SP-2021-00063 Issue Date: 6/15/2021 Zoning Type: RESIDENTIAL Use Type: 24 HOUR NOTICE REQUIRED FOR ALL INSPECTIONS ♦ MON-FRI: 8AM-4:30PM ♦ NO HOLIDAYS Site Address: 4208 WEST ARM DRIVE, SP, MN 55384 Description: master and basement bath remodel: 2 wc, 3 lav, 2 shower, 1 bathtub Permit Granted To: Nybo Peterson Plumbing Homeowner's Name: STEVEN J & MARY ANN MILLER Phone Number: Parcel #: 1811723440064 Permit Type: PLG - General (residential) Permit Exp: 12/11/2021 Valuation: $4,000.00 Fees Receipt # Product Sale Date Quantity Date Paid Status Pmt Info Amount 0 State Surcharge Flat Fee - $1.00 6/14/2021 1.00 Due $1.00 PIG - $10 per Fixture over Min 6/14/2021 8.00 Notes Due $80.00 Total: $81.00 • This permit is issued in accordance with and subject to all provisions of Ordinances and policies governing building and zoning in City of Spring Park. • Permit Holder/Contractor/Owners Agent is responsible to call for the inspections! • Permit Packet, including approved plan, and this inspection record must be posted in an accessible location before calling for inspection. Maintain this inspection record until work is complete. • No deviations from the approved plans are allowed without prior consent from the building inspections department. • To Owner, Occupant, or Contractor: It is ILLEGAL TO OCCUPY this area/building until all required final inspections have been made, approved, signed, and certificate of occupancy issued! Scott Qualle, Building Official City of Spring Park +4349 Warren Avenue ♦ 55384 Copyright 02021 o; 19524719160 Page: 2 of 3 2021-06-14 18:03:20 UTC 19526745998 From: Andrew Nybo CITY OF SPRING PARK PAGE 1 BUILDING PERMIT 4349 Warren Avenue jo v - dt�0 Spring Park, MN 55384 L7 Handout Given -!�'D. Routed to MNSRECT Phone: 952-4-71.9051 Fax: 952-471-9160 ❑ Lead Handout Given ti ADDRESS: �1 i pw:.�- y .:oo��/ i) was the home wristructed befa'e a7a? (Y9S a, continue wM Kne.4 RO o continue wittiots; 400mpleung £P4 Section) Will the woikdLsturb i=f3 sq ft of Interior paintW su faces. or z20 sq #t of exterior painted surfaces? (M. ago to tine 4,140 awiine.3) }.Afet tere.any windows being. ?.:{1lES ago to t)ne4,.NQo Conttr�ue.vnlhoutaornpietirrg EPA,Sed+oxt) 4} #ias'itils bgr re been Certified Lead Free? (YM a, you MUST Attach Ced0lu tion informlim NO n. wmptete title 5) EPA Contractor owwatrm Nximber: NA - PROPERTY VANAR:. s rEYE f.� a �lA st i E � Address Aw' zip: Ernaif: State. \ 1 Ztw iantrac�rtacet: Na: t ;, �n '`l.lo Contact Name: Erraaa:. 5n� ire fr�t>` _l --------------- ARCHITECT? Address: . City, State: zip: Phone: ;".FWc ErsYatl; Con 'etName.iL.,^ ";a „: ne: TYPE OFWORK, ORK: a New Consumliion p Deck' Pot " Re -Roof a Comrnerdat esiderq at �e� i#y4w Pore DRe-Side a Chan of Uw V RA 1,4 pFinish easerner poi Y ; �, a Fence.__ EST VALUATIONfN OF WORK .� Y' • l3 V : ~, VSh6d o R�E�r(y1odat �.�"'.�"-r lzft ��RR/^, :tquarQ IWM' g t/ij. l}lq�IAVSI„ VJ,7 Zi Addition 4 a(�I (F of y�,y q ��/yyp �{%�r aGarap-A#tactt1tttf AV1^18i1r, rQ�A4�'4VY�INyQt{t n 4 11 MUQ�,�ng.ttepllace[1' being. Aeces re �•• MecttatliCe' rcw 'deli, on*P*pe2 �]..la kw VLIICI DAlaffedt•'i 44 MI of Nlb gppircadioarDYtpt ie 1propartY awrar c8 c', � a _,' e t raaarda6va. is;;aid- n; a e o* a v* 5nmp, Wa ftW*r ar dwvwe aw v a su inp. geeto antaF apoh iha ¢mpt Rg� p� nabdad Rpg�lediota..E-by." A naYci. t heraay.acknap►adge VW[ taus ne6ttaa appicatipn a!i! *tate'Oe0. aq'6dotmptlRrc le jrus arE to.the.0satarmgMn+rlWpe.�'4e!hara0�thatmi s'ersuxla?�ca�appmwtl.Plea.apacipcaGotxtndcW�lOnaand3oabkSaOgala�FmrxasatLaAiwilcpeQy itro kris or4a.Staea nrshoo*e rror.ba proasad vrr MO W* k. Pamtlt e7pkaa wean %Wk .r nolapanlarFad.widfF11sQdagahom. at da4a49n44naq.GcnaS.Led1er380daSw+AwdcbeyoodapgolPpmlawohYipamtorinapactlan. A* sokJect LR d p�aYg. w`< Noise Ortarie . ffeca!M -hill e 7 am. and a8pr 10 pin : Wasimideffioiidays baWe 7 am. and kft�ra'p m $fC:sNATblttiE DF" DATE; pMai::. Th4 is the signature of: 0 otMw or Qwner`s fitepresentabya OCCUR C . T` PE: CfiDE: BLDG SPRINKLED Yes 1W VP LUARON*,•. Permit Fee: $ WAC Charge. $ F4an.Rsview'Fee-6 Sewer& -Water Hook -lip: S. State Surchatg8: $ Sewer & Water Nseonnect: $ Site inspection Fee_ $ Water Meter. $ S-E.C. Fee: $ Muni SENUA Fee: S investigation Fee I Other Fee: $ `23't'B SAC Escrow. ** as5 Copy Charge ($.25 per8.3 xfi page) ;B Other $ Ueonso Chock ($6) I Lzad Check (86) $ TOTAL DUE .S ut SUB -TOTAL $ Plumbing Fee front 2 F�/ 00 `ero�r£: coow+ere�ar pwta wr as w�nad.eo n,a reec cour� swiromne�w two 3 $ v for sac debow"km Fsmr.peymenf VA be r** r d When perauars Issued, .If Mechanical Fee from Page 2 $ slat CowwY Wow no SAC to detennined=**crow war be refd1. unded M h Special ConditionslRequired Setbacks: Building Approval By: DATE: Printed Building Approval By: O License Verificaton O Lead Verification - Checked By; City'Approval By. DATE: JPWd: k1 0 0 Date: iS ,t l Reoeipt No. / 4, .3 p S Sr l 2 I— Vage: J of 3 2021-06-14 18:03:20 UTC 19526745998 From: Andrew Nybo CITY OF SPRING PART{ 1 MECHMICAL.PERMIT 'R PLUMBING PERMIT .SP-JO-t 1-c900103 PAGE 2 FOR PERMIT ISSUANCE PAGE 1 and PAGE 2 should be complete MECHANICAL INFORMATION Mechanical Contractor. Addrew— CitT State: 4a Phone. Fax' State Bond No: Contact Name: . Email- Contact Phone: Detailed DmirliAlon o� Wcetcc wr indicate type of project, fixtures, and Gas Lines you will be installing or replacing (include count fore ty104,fture): I) ECHAN/CAL FW RES GAS L Nd s Y Quantity Quantity Quard fY k s Furnace Kitchen Fan Furnaces " Air Conditioning System .Bath Fan Fireplace Air Exchanger Grill Unit Heater Y Fireplace Water Unit Heater Grill In Floor Heat Gas La r o Replacement. (one fixture only, no ping or vent charms) #echanical Petm Fee: $ • AdditiontRemodel Gas Line Permit Fee: S o New Construction :. State Surcharge:.'b o Other k r Other $ F Total Mechanical Permit: .$ INFORMATION Plum" Contractor: ���> :.r � Address: 4 C' gi'e- e: r�_.`f l� Phone: '�-D , ax: Plumbers License No: State Bond No: ConUct Name:.- G" lContect Phone: .- Email: 1 Detailed cdwo of ek-, Q ICA Indicate type of project and fixtures you wilt be installing or replacing (mciude count for each type o€ €i3ctur+e): PLtMIBMKi FUTLMS Quantity. — Water: Heater Shower Laundry Tub ❑ Gas c Electric Dishwasher Rom gh-1n Future Fixture Water Softener Clothes Washer Sump atCloset (Tollet) Hose BA) Floor Drain LL�awr2prinklar System Ice Maker Line Water Piping System vat ash Basin BafMub omae use cagy: ❑ Replacement (one fixture only, no piping or vent changes) Plumbing Permit Fee: $ ;,Add'ition/Remodel State Surcharge $ /.'00 o New Construction Other: $ o Other Total Plumbing Permit: $ INSPECTION RECORD 2020 MN State Building Code City of Spring Park Permit Number: SP-2021-00063 Issue Date: 6/15/2021 SITE ADDRESS: 4208 WEST ARM DRIVE, SP, MN 55384 Description: PERMIT TYPE: PLG - General (residential) master and basement bath remodel: 2 we, 3 lav, 2 shower, I bathtub ZONE/USE TYPE: RESIDENTIAL APPLICANT: Nybo Peterson Plumbing OWNER: STEVEN 3 & MARY ANN MILLER No inspection will be performed, and a re -inspection fee will be charged, if this "Inspection Record", the "City of Spring Park Permit", and, when applicable, the approved plans are not available to the inspector. This permit expires if construction activity does not commence within 180 days from obtaining this permit; when construction activity has been suspended or abandoned for at least 180 days; or the work has not been inspected within 180 days from the last documented activity. IF SEPARATE PERMITS ARE REQUIRED, REFER TO THE "SEPARATE PERMITS REQUIRED FOR:" STAMP ON YOUR APPROVED PLANS/CONSTRUCTION DOCUMENTS TO IDENTIFY WHAT SEPARATE PERMITS ARE REQUIRED. ALL REQUIRED ROUGH -IN INSPECTIONS, NOTED ON SEPARATE PERMITS, MUST BE COMPLETED PRIOR TO SCHEDULING A FRAMING INSPECTION. ALL REQUIRED FINAL INSPECTIONS, NOTED ON SEPARATE PERMITS, MUST BE COMPLETED PRIOR TO SCHEDULING A BUILDING FINAL INSPECTION. DO NOT COVER ITEMS TO BE INSPECTED. Permit Card (4) Plumbing Underground R. I. Required Plumbing Aboveground R. I. Required Gas Line Certification Required Plumbing Final Required MUST CALL TO SCHEDULE NO LATER THAN THE BUSINESS DAY PRIOR TO THE INSPECTION DAY: 8:00 A.M. TO 4:30 P.M. MONDAY THRU FRIDAY. PHONE NUMBER TO CALL: 952-442-7520 When a Certificate of Occupancy is needed, return this card and the approved final inspection notice to the City of Spring Park office. Thank you for your Payment! Transaction ID: 12714 Transaction Number. Transaction Type: Payment Recipient: Contractor Notes: Fees State Surcharge Flat Fee - $1.00 PIG - $10 per Fixture over Min l lI 1 Y OF `SE'kI_�IUpf"ARK City of Spring Park 4349 Warren Avenue SP MN, 55384 Ph: 952-442-7520 $81.00 Date: 6/15/2021 Method: Check: 16385 Address: 4208 WEST ARM DRIVE, SP, MN 55384 Reference: Permit Number: SP-2021-00063 Type: PLG - General (residential) for Nybo Peterson Plumbing Paid 1.00 $1.00 $1.00 Paid 8.00 $80.00 $80.00 Total Amount: $81.00 Page 1 of 1 Printed on: 6/15/2021 ice' _ (� T Y2-7520 /- M N i E Cr 1 Phone: -442- 521 � f ��c Fax: 952-442-7521 4I1"I;4, i;J;' Email: info@mnsr)ect.com BASEMENT FINISH ➢ This handout is intended only as a guide. It shall not be considered a complete set of requirements. ➢ Materials and installation must comply with the current Minnesota State Building Code and the manufacturers' installation specifications for each product. ➢ A building permit is required to finish an area in your basement, including: constructing, moving, and/or altering a wall; installing a wall surface on existing exposed studs; or installing a ceiling surface. Additional permits are required if electrical, sprinkler, ductwork, fireplace, plumbing, or gas piping work is being performed. BUILDING Permit Submittal shall include: ❑ Building Permit Application, completed in its entirety, including signature and valuation. ❑ SUPPLEMENTAL WORKSHEET FOR BASEMENT FINISH (included in this handout). ❑ One set of plans (drawn to scale) showing the proposed design, and including: o The year home was built. o Proposed floor plan design including dimensions. o Existing floor plan overview. o A list of construction materials to be used and where the listed materials will be located. o A description of the plumbing fixtures to be used and their locations. o A description of any changes to existing heating, ventilation or air conditioning and their locations. o Whether there is a radon system present. o Labeling of all rooms. o Sprinkler placement (if present). ❑ Additional information may be required by the plan reviewer. POSTED prior to start of work - VISIBLE from street or driveway - ACCESSIBLE to the inspector. Inspections MUST be scheduled during office hours AT LEAST one business day prior to inspection. If a specific date and time is required, additional notice may be needed. Failure to cancel a scheduled inspection may result in a reinspection fee. ➢ Office Hours: Monday - Friday • 8:00 a.m. - 4:30 p.m. ➢ Phone: (952) 442-7520 or (888) 446-1801 Inspections: (Refer to your permit card regarding project -specific inspections) o Someone 18 years or older must be present at the time of each inspection. o Plumbing rough -in (A plumbing permit is required if water supply or drain, waste, or vent pipes are altered or installed.): New or altered underground plumbing pipes must be inspected before being concealed with dirt or concrete. Above ground vent and waste pipes must be inspected and air -tested before wall covering is applied. o Mechanical (HVAC) rough -in (A mechanical permit is required for the installation of bath/kitchen fans, and/or a fireplace or other type of heating appliance.): Ducts and pipes used to convey the source of heat throughout the finished area must be accessible and exposed. o Electrical rough -in (An electrical permit is required for any electrical changes): Electrical work must be inspected before installing insulation, sheet -rock, paneling, or any work concealing electrical wiring. Underground wiring must be inspected before the trench is back -filled. Except for the final connection to switches, receptacles, and lighting fixtures, all ground wires and other wires in boxes must be spliced and pigtailed. o Framing: Framing is inspected after the interior partitions and any fire blocking and bracing are in place; sprinkler, mechanical, electrical, and plumbing systems are in place; and the rough -in inspections have been approved. Basement Finish Handout Page 1 of 3 Copyright 0 MNSPECT 2020, Rev. April 2020 o Insulation: This inspection is performed after the insulation and the interior vapor barrier are in place and fully taped. o Final Inspections for plumbing, HVAC, sprinklers and electrical work must be performed before the wiring/plumbing/mechanical equipment is utilized; and before the basement finish final inspection. o Final: All life safety items must be complete, including smoke and carbon monoxide alarms, before the final inspection will be signed off. The space may not be occupied prior to the final inspection approval. NOTICE: Construction or work for which a permit is required shall be subject to inspection by the Building Official, and such construction or work shall remain accessible and exposed for inspection purposes until approved. It is the responsibility of the permit applicant to be in attendance on site and provide access to the Building Official for all required inspections. If work is concealed and/or work is not complete at time of inspection, an additional inspection is required and a reinspection fee may apply. Note: The State of Minnesota requires all residential building contractors, remodelers, roofers, plumbers, and electricians to obtain a state license, unless they qualify for a specific exemption. Any person claiming an exemption must provide a copy of a Certificate of Exemption from the Department of Labor & Industry to the Municipality before a permit will be issued. Note: To determine contractor requirements, or to check the licensing status of a contractor, please call the Minnesota Department of Labor & Industry at 651-284-5065 or toll free 1-800-342-5354. Note: For specific code requirements, contact the Building Inspection Department at 952.442-7520 or 888-446-1801 or e-mail: info a()mnspect.com. The following is a guideline to assist in compliance with the requirements of the MN State Building Code. ❑ The home address must be visible from the street. ❑ Smoke alarms and carbon monoxide alarms must be installed and operational. (See handouts regarding smoke and CO alarms for requirements.) ❑ Unobstructed headroom of 6'- 4" feet must be provided in habitable spaces, kitchens, halls, bathrooms, toilet compartments, and laundry rooms located in basements. ❑ Foundation plates or sills resting on concrete slabs in direct contact with the ground, unless separated by an impervious moisture barrier, shall be treated. ❑ Sill -sole plates shall be adequately secured to the floor. ❑ Fireblocking must be in place. ❑ If fireplace is was installed, the shut-off valve and unit must be within 6' of each other and in accordance with manufacturer's instructions. ❑ When the underside of the stairway is enclosed and accessible by means of a door, '/2" gypsum board is required on walls and ceiling of enclosed area. ❑ An egress window is required in every bedroom in new basements and when habitable space is first added or expanded unless a compliant automatic sprinkler system is installed. If an egress window is installed in a basement bedroom, an additional egress window is not required in the rest of the basement unless there are additional bedrooms. (See Emergency Escape & Rescue Opening handout for more information.) Basement Finish Handout Page 2 of 3 Copyright © MNSPECT 2020, Rev. April 2020 SUPPLEMENTAL WORKSHEET FOR BASEMENT FINISH (MUST be included when applying for permit) The following information is required when applying for a Basement Finish permit. (Some of this information may also be listed on your plans.) 1. Exterior wall construction: a. Size of studs/stripping b. Spacing of studs c. Type and thickness of insulation d. Vapor barrier (i.e. 4 or 6 mil polyethylene) e. Wall covering (i.e. '/z" sheetrock) 2. Interior wall construction: a. Size of studs b. Spacing of studs c. Wall covering (i.e. '/2" sheetrock) 3. Ceiling covering (i.e. '/2" or %" sheetrock) 4. Plumbing to be installed (check one for each bathroom) a. NONE b. '/2 bath on existing rough -in plumbing C. % or full bath on existing rough -in plumbing d. '/2 bath including new rough -in plumbing e. % or full bath including new rough -in plumbing f. other (please specify) 5. Heating to be installed (check one) a. extend supply and returns b. use existing with no changes C. other (please specify) 6. Will a fireplace be installed? ❑ Yes ❑ No Type of fireplace 7. Total square footage of the finished basement area 8. Sprinkler to be installed/modified? Basement Finish Handout Page 3 of 3 Copyright © MNSPECT 2020, Rev. April 2020